# 001903957928
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-11-15, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 04022019 H247, the deadline for which has expired. The objectives of this inspection are to take measures to control the elimination of violations specified in paragraphs of the instruction from 04022019 H247. The subject of this inspection is to comply with the instructions of the state control and supervision authorities
# 001903542513
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-09-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to verify the fulfillment of an earlier issued order dated 23102018 44321273, the deadline for which has expired
# 001903382310
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-11, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the facts stated in a collective appeal from residents of a cottage residential development in Pervomaisky district of the Korkinsky district of the Chelyabinsk region
# 001902730756
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of the points previously issued by the regulations of 23102018 44321271 4432127244321273 and 44321275, the deadline for which has expired
# 001902730754
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of items earlier than the issued prescription dated 18012019 N 161, the deadline for which has expired
# 001902433242
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-01-18, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent, identify and suppress violations in the implementation of measures to monitor compliance by Gazprom Gazoraspredenie Chelyabinsk JSC with the industrial safety requirements of hazardous production facilities.
# 001902459632
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-02-04, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 742005208779
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection:
# 742004260286
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741904130779
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work performance conducting leakproofness tests of high-pressure gas pipelines during work restoration of landscaping of the construction site after completion of work and the construction materials used during construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 Availability of a building permit3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904090164
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-13, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Consideration of the appeal 22868 dated 25/12019 23300 dated 02/122019
# 001904169765
Unscheduled inspection
Start date: 2019-12-30, end date: 2019-12-31, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of previously issued regulations from 31052019 Cb47 from 22112019 Cb471
# 741903931507
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the work performed installation of sections of a high-pressure gas pipeline development of a trench installation of a base laying of a pipeline installation of fittings backfilling installation during work and the construction materials used during construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001903957928
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-11-15, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 04022019 H247, the deadline for which has expired. The objectives of this inspection are to take measures to control the elimination of violations specified in paragraphs of the instruction from 04022019 H247. The subject of this inspection is to comply with the instructions of the state control and supervision authorities
# 741903965839
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903835591
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903896583
Unscheduled inspection
Start date: 2019-10-29, end date: 2019-11-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of underground PE sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling installation during work and construction materials used during construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and equipment requirements of the capital construction facility metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903846712
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903810627
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the organization of the construction site according to the project breakdown of the gas pipeline route during the work installation of aboveground sections of the low-pressure gas pipeline drilling of pits for supports installation of concrete foundations of supports installation of supports during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements They also do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources.2 The availability of a construction permit.3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation.
# 001903542513
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-09-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: It is carried out in order to verify the fulfillment of an earlier issued order dated 23102018 44321273, the deadline for which has expired
# 001903382310
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-11, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the facts stated in a collective appeal from residents of a cottage residential development in Pervomaisky district of the Korkinsky district of the Chelyabinsk region
# 741902883777
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work completion installation of internal water supply and sanitation systems for gas supply and ventilation low-current power supply networks 2 stages of construction in rows AB axes 19 after completion of work Outdoor lighting 2 stages of construction in rows AB axes 19 after completion of work Interior finishing works landscaping 2 stages of construction in rows AB axes 19 after completion of work Fire and sanitary epidemiological measures and measures to ensure access for the disabled during the 2nd stage of construction in rows AB axes 19 after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, project documentation2 Availability of a construction permit3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902785309
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of internal gas supply systems 2 stages of construction in rows AB axes 19 during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001902730756
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of the points previously issued by the regulations of 23102018 44321271 4432127244321273 and 44321275, the deadline for which has expired
# 001902730754
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment of items earlier than the issued prescription dated 18012019 N 161, the deadline for which has expired
# 741902465731
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of internal gas supply systems in section III block in rows and axes 1220 during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001902433242
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-01-18, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent, identify and suppress violations in the implementation of measures to monitor compliance by Gazprom Gazoraspredenie Chelyabinsk JSC with the industrial safety requirements of hazardous production facilities.
# 001902459632
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-02-04, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 741802153142
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation for the installation of sections of a low-pressure gas pipeline the development of a trench the installation of a foundation welding insulation of joints laying of a pipeline backfilling after completion of work and the construction materials used during the construction of a capital construction facility as well as the results of such work
# 741802200121
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of ventilation systems for external and internal gas supply and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 741802129804
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of internal gas supply systems block section I in the rows of axes 18 and block section II in the rows of axes 111 after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation
# 741802026411
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of sections of a low-pressure gas pipeline the development of a trench the installation of a foundation welding insulation of joints laying of a pipeline backfilling during the work Installation of a GRP and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741801774631
Unscheduled inspection
Start date: 2018-10-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741801774598
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801999112
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of external gas supply networks after completion of the work, the installation of internal gas supply systems block section I in rows 18 axes and block section II in rows 111 axes during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Execution of requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801879666
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800783801
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800681342
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work for the installation of the gas pipeline from PC 280 to PC 320 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801460790
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800674608
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of sections of a low-pressure gas pipeline the development of a trench the installation of a foundation welding insulation of joints laying of a pipeline backfilling during the work Installation of aboveground sections of a low-pressure gas pipeline drilling holes for supports installation of concrete foundations of supports installation of supports installation painting during the work and the construction materials used during the construction of a capital construction facility as well as the results of such work requirements technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801460495
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-10-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of external gas supply networks after completion of the work, the installation of internal gas supply systems after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800605339
Unscheduled inspection
Start date: 2018-08-14, end date: 2018-08-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800627772
Unscheduled inspection
Start date: 2018-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800627758
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-08-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on disconnecting the gas pipeline purge replacing the gearbox purging crimping the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800605789
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-08-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed breakdown of the gas pipeline route installation of low-pressure gas pipeline sections development of a trench foundation installation welding insulation of joints laying of the pipeline backfilling during work Installation of aboveground sections of the low-pressure gas pipeline drilling holes for supports installation of concrete foundations of supports installation of supports installation painting during work and the construction materials used during the construction of the capital construction facility as well as the results of of such works to the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800605878
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800605603
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800605494
Unscheduled inspection
Start date: 2018-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800556798
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800493072
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800492919
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800493135
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800445803
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of internal gas supply systems of the 1st stage of construction in rows AB axes 1018 after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800445407
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-06-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work installation of low-pressure gas pipeline sections trench development foundation installation welding insulation of joints pipeline laying backfilling after completion of work Installation of above-ground sections of medium and low-pressure gas pipelines drilling holes for supports installation of concrete foundations supports installation of supports installation painting after completion of work and applied building materials during the construction of the capital construction facility as well as the results of such requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800430911
Unscheduled inspection
Start date: 2018-06-11, end date: 2018-06-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed breakdown of the gas pipeline route installation of low-pressure gas pipeline sections development of a trench foundation installation welding insulation of joints laying of the pipeline backfilling during work Installation of aboveground sections of the low-pressure gas pipeline drilling holes for supports installation of concrete foundations supports installation of supports installation painting during work and the construction materials used during the construction of the capital construction facility as well as the results of such works to the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800488108
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work for the installation of the gas pipeline from PC 240 to PC 260 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800507134
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-06-28, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Consideration of appeal 5184B dated 31052018
# 741800423412
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the trench development work, the sand cushion installation, welding and laying of PE pipes, the replacement of the power transformer and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800475098
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of sand backfilling, soil backfilling, GRPB installation, power transmission line construction, grounding and lightning protection installation, commissioning and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31st52 of the Urban Planning Code of the Russian Federation
# 741800471574
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the gas pipeline installation works on supports and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 741800485133
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800484528
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800484552
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the development of the trench and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800471627
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of external gas supply networks during the work, the installation of internal gas supply systems during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001800465801
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: it is conducted in order to monitor the implementation of previously issued regulations Sv6063rP1 and Sv6063rP2 dated 08122017, which expired at the time of the audit on the basis of Article 10 of the Federal Law dated 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the exercise of state control supervision and Municipal control" The objectives of this audit are measures to control the elimination of violations specified in the regulation Sv6063rP1 and Sv6063rP2 from 08122017
# 741800412363
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800327892
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work for the installation of the gas pipeline from PK 220 to PK 240 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800368031
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of gas pipeline supports and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of art. 52 of the Urban Planning Code of the Russian Federation
# 741800385300
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of sections of a medium-pressure gas pipeline the development of a trench the installation of a foundation welding insulation of joints laying of a pipeline backfilling after completion of work installation of a GRP and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741800360104
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-05-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work installation of sections of medium and low pressure gas pipelines trench development foundation installation welding insulation of joints pipeline laying backfilling during work Installation of aboveground sections of medium and low pressure gas pipelines drilling holes for supports installation of concrete foundations supports installation of supports installation painting during work Installation of GRPS after completion of work and applied building materials during construction the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800310268
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of sections of a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001800287021
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-05-16, duration: —
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this inspection is carried out in order to comply with the previously issued instruction from 30032018 01180060 the objectives of this inspection are to identify and prevent violations of regulatory legal acts standards and regulations governing the activities of the motor transport complex The subject of this inspection is to comply with the instructions of state control and supervision authorities to take measures to prevent harm to the life health of citizens harm to animals plants and the environment
# 741800290925
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of aboveground sections of a high-pressure gas pipeline painting after completion of work installation of sections of an underground high-pressure gas pipeline development of a trench installation of a foundation welding insulation of joints laying of a pipeline backfilling after completion of work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations design documentation 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800293271
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the breakdown of the gas pipeline route installation of medium and low pressure gas pipeline sections trench development foundation installation welding insulation of joints laying of the pipeline backfilling during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800231765
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work execution breakdown of the gas pipeline route installation of high and medium pressure gas pipeline sections development of the trench foundation device welding insulation of joints laying of the pipeline backfilling after completion of work Installation of low pressure gas pipeline sections development of the trench foundation device welding insulation of joints laying of the pipeline backfilling during work and the construction materials used during the construction of the capital construction facility as well as the results of such works to the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800249724
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work for the installation of the gas pipeline from PK 200 to PK 220 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800205216
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800204947
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800213289
Unscheduled inspection
Start date: 2018-03-21, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800092752
Unscheduled inspection
Start date: 2018-02-22, end date: 2018-03-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work for the installation of the gas pipeline from PK 194 to PK 227 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74180803041539
Unscheduled inspection
Start date: 2018-01-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74180803053459
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work for the installation of the gas pipeline from PK 161 to PK 194 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74180803053330
Unscheduled inspection
Start date: 2018-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170803019977
Unscheduled inspection
Start date: 2017-12-27, end date: 2018-01-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802908880
Unscheduled inspection
Start date: 2017-12-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802906690
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work installation of aboveground sections of a medium-pressure gas pipeline drilling holes for supports installation of concrete foundations of supports installation of supports installation painting installation of GRPS and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations for project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802911451
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the earthworks and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802983833
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the gas pipeline testing, the reclamation pipeline route layout and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802940899
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of parts 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170802797920
Unscheduled inspection
Start date: 2017-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802788202
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the earthworks for the installation of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802873453
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The actual condition of the capital construction facility 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802783821
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-11-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the earthworks for the installation of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802852286
Unscheduled inspection
Start date: 2017-11-22, end date: 2017-11-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work for the installation of the gas pipeline from PK 62 to PK 128 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802854329
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-11-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of excavation work for the installation of a high-pressure low-pressure gas pipeline with the GRP installation and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802841654
Unscheduled inspection
Start date: 2017-11-15, end date: 2017-11-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of earthworks for the installation of a gas pipeline with the installation of a PHB and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802816477
Unscheduled inspection
Start date: 2017-11-15, end date: 2017-11-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the underground part of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 74170802845111
Unscheduled inspection
Start date: 2017-11-16, end date: 2017-11-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of excavation work, installation of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802815691
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802650256
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work installation of aboveground sections of a high-pressure gas pipeline drilling holes for supports installation of concrete foundations of supports installation of supports installation painting Installation of GRPS and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802754740
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the trench development work, the laying of a low-pressure gas pipeline, the installation of GRPSH132N1 PGB 13NV and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802582799
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of PGB 1 GRPSh 3 4 5, the testing of the gas pipeline, the commissioning and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802741302
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-10-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802707314
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-10-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of an above-ground medium-pressure gas pipeline in the area from UP894 to the angle of rotation UP13129 foundations for supports installation of supports installation of the pipeline anti-corrosion protection and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802741169
Unscheduled inspection
Start date: 2017-10-18, end date: 2017-10-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the work 2 stage of construction laying of underground sections of high and low pressure gas pipelines development of a trench foundation installation of pipelines backfilling installation of GRPB after completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation2 Receipt of construction permits 3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802712449
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-10-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work installation of a high-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802759212
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 The receipt of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802486088
Unscheduled inspection
Start date: 2017-09-19, end date: 2017-09-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the preparation of the territory welding of the gas pipeline in the scourge the development of a trench for the gas pipeline the installation of a bed of sand laying the gas pipeline in the trench and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh23 and 31 art 52 of the Urban Planning Code of the Russian Federation
# 74170801990355
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-09-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work breakdown of the gas pipeline route Excavation on a low-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling Installation of aboveground sections of a low-pressure gas pipeline drilling holes for supports installation of concrete foundations supports installation of supports installation painting during work and the construction materials used during the construction of a capital construction facility as well as the results of such work requirements technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802118211
Unscheduled inspection
Start date: 2017-09-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802596999
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of an above-ground medium-pressure gas pipeline in the section from PK1+815 to UP894 foundations for supports installation of supports installation of a pipeline installation of a compensator under a highway anti-corrosion protection and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2 Receipt of a construction permit 3compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation
# 74170802521745
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-09-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the work 1 stage of construction crimping and purging of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802521459
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802322746
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701866330
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The verification of the completed construction of the facility 1 stage of Solontsovaya Street 2 stage of 40 let Oktyabrya Street 4 stage of Gorelova Street 5 stage of 8 Marta street 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701871888
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701853952
Unscheduled inspection
Start date: 2017-08-08, end date: 2017-08-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development, pipe laying, and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701866774
Unscheduled inspection
Start date: 2017-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170801933199
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of exits to houses and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the design documentationthe construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701906042
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the development of the trench and the preparation of the trench bottom, the laying of the gas pipeline into the trench, followed by sanding, the installation of the GRP, the strapping of the GRP, the cleaning of the inner cavity of the gas pipeline, the testing of the gas pipeline for tightness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation
# 74170701904865
Unscheduled inspection
Start date: 2017-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701841493
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701774947
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-07-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development, pipe laying, and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701805135
Unscheduled inspection
Start date: 2017-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701676587
Unscheduled inspection
Start date: 2017-06-14, end date: 2017-06-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on site 4 of Gorelova Street trench development foundation installation welding insulation of joints laying of pipeline backfilling during work and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701719449
Unscheduled inspection
Start date: 2017-06-27, end date: 2017-06-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701596433
Unscheduled inspection
Start date: 2017-05-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701629595
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 art 52 of the Urban Planning Code of the Russian Federation
# 74170701564789
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on sections 2 of turn 40 let Oktyabrya street installation of aboveground sections of the gas pipeline drilling pits for supports installation of concrete foundations of supports installation of supports installation painting after completion of work and 5 of turn 8 Marta street installation of aboveground sections of the gas pipeline drilling pits for supports installation of concrete foundations of supports installation of supports installation painting after completion of work and applied building materials in during the construction of a capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701528538
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-04-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of excavation work on a high-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling after completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, meets the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701518546
Unscheduled inspection
Start date: 2017-04-10, end date: 2017-04-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701493565
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the development of a trench, the installation of a bed for a gas pipeline, the laying of a gas pipeline into a trench and the construction materials used during the construction of a capital construction facility, as well as the results of such work, comply with the requirements of technical regulations for project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701497088
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on site 2, turn 40 let Oktyabrya St. installation of aboveground sections of the gas pipeline drilling of pits for supports installation of concrete foundations of supports installation of supports installation painting during work and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701543963
Unscheduled inspection
Start date: 2017-04-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701411992
Unscheduled inspection
Start date: 2017-03-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701461366
Unscheduled inspection
Start date: 2017-03-22, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701449476
Unscheduled inspection
Start date: 2017-03-20, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701357164
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-02-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The verification of the completed construction of the facility, turn 3 Kalinina St. 2The receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701361824
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-02-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Cleaning the internal cavity and testing the gas pipeline for tightness 2 Obtaining a construction permit 3 Complying with the requirements of HR 23 ST52 of the Urban Planning Code of the Russian Federation
# 74170701336153
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-02-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of internal gas supply systems 2 stages of construction in axes 13 after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701286132
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-01-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The actual condition of the capital construction object2the receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701331432
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-02-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the installation and concreting of supports, the laying of a gas pipeline along the supports, the installation of a foundation for a GRP, the installation of a GRP fence, and the construction materials used during the construction of a capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701269236
Unscheduled inspection
Start date: 2017-01-09, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701310118
Unscheduled inspection
Start date: 2017-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701310168
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work 3 stage of construction from support 035 on Maukskaya Street to support 0122 on Egozinka Street from support 0122 on Egozinka Street to support 0160 with installation of PGB042U1 installation of aboveground sections of a high-pressure gas pipeline drilling pits for supports installation of concrete foundations of supports installation of supports installation painting during work and applied building materials during the construction of a capital facility construction as well as the results of such work to the requirements of the technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701226484
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The verification of the completed construction of the facility 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701240811
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation and concreting of supports, the laying of a gas pipeline along the supports, the installation of a foundation for a GRP, the installation of fencing and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701233542
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the commissioning works, fencing, landscaping and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Receipt of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701162319
Unscheduled inspection
Start date: 2016-12-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701207900
Unscheduled inspection
Start date: 2016-12-07, end date: 2016-12-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the sites of stage 1 of Solontsovaya Street, stage 3 of Kalinina Street, trench development, foundation installation, welding, joint insulation, pipeline laying, backfilling during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701226375
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work excavation on a high-pressure gas pipeline development of a trench foundation installation welding insulation of joints laying of a pipeline backfilling during work Installation of aboveground sections of a high-pressure gas pipeline drilling holes for supports installation of concrete foundations of supports installation of supports installation painting during work Installation of GRPS and applied building materials during the construction of a capital construction facility as well as the results of such requirements of the technical regulations of the project documentation2 Obtaining a construction permit3compliance with the requirements of HR 23 ST52 of the Urban Planning Code of the Russian Federation
# 74160701106213
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on sections PK0 PK0+1773 PK2+645 PK3+50 PK4+805 PK5+30 PK9+248 PK11+573 PK13+80 PK14+39 PK15+741 PK23+685 PK24+541 PK27+28 trench development sand cushion installation welding joint insulation laying of high-pressure gas pipeline backfilling after completion of works and construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700915753
Unscheduled inspection
Start date: 2016-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701051033
Unscheduled inspection
Start date: 2016-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701034903
Unscheduled inspection
Start date: 2016-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701019577
Unscheduled inspection
Start date: 2016-10-26, end date: 2016-10-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on sections PK0 PK0+1773 PK2+645 PK3+50 PK4+805 PK5+30 PK9+248 PK11+573 PK13+80 PK14+39 PK15+741 PK23+685 PK24+541 PK27+28 trench development sand cushion installation welding joint insulation laying of high-pressure gas pipeline backfilling and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700072597
Unscheduled inspection
Start date: 2016-09-01, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160700828050
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-09-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of excavation work for the installation of a high-pressure gas pipeline, the GRPB foundation, the GRPB installation, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Receipt of a construction permit 3 Compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700861950
Unscheduled inspection
Start date: 2016-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700432576
Unscheduled inspection
Start date: 2016-09-13, end date: 2016-09-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700572177
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601795701
Unscheduled inspection
Start date: 2016-08-22, end date: 2016-08-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of outdoor gas supply networks and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601781838
Unscheduled inspection
Start date: 2016-08-12, end date: 2016-08-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The actual condition of the object2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601761339
Unscheduled inspection
Start date: 2016-07-07, end date: —, duration: —
Authority: —
Purpose of inspection: