# 00170803042741
Unscheduled inspection
Start date: 2017-12-27, end date: 2017-12-27, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of the technical condition and safe operation of thermal power plants and heating networks
# 741800269793
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-05-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800010777
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the fulfillment of n 234 of the regulation on the elimination of violations during the construction of the reconstruction of the capital construction facility from 2009-2017 and n 12 of the regulation on the elimination of violations during the construction of the reconstruction of the capital construction facility from 11102017
# 74180803034107
Unscheduled inspection
Start date: 2018-01-15, end date: 2018-01-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the fulfillment of p234 of the regulation on the elimination of violations during the construction of the reconstruction of the capital construction facility from 20092017 and p12 of the regulation on the elimination of violations during the construction of the reconstruction of the capital construction facility from 11102017
# 00170803042741
Unscheduled inspection
Start date: 2017-12-27, end date: 2017-12-27, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of the technical condition and safe operation of thermal power plants and heating networks
# 74170802642825
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The actual condition of the capital construction object2the receipt of a construction permit3the fulfillment of the requirements of HH 23 and 31st52 of the Urban Planning Code of the Russian Federation
# 74170802628059
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the roof of the building and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802773630
Unscheduled inspection
Start date: 2017-10-31, end date: 2017-11-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal engineering systems and facades during the production of works and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802206113
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-09-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with p1 and p6 regulations on the elimination of violations during the construction and reconstruction of a capital construction facility dated 03/12/2016 Availability of a construction permit
# 74170801929337
Unscheduled inspection
Start date: 2017-08-21, end date: 2017-09-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: To establish that this inspection is being carried out with the aim of carrying out federal state supervision over compliance with labor laws and other regulatory legal acts containing labor law norms in connection with the received appeal of Nevolin's employee AB LLC "Construction Technologies of the City" about the violation of labor rights
# 74170701661239
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with p1 and p6 regulations on the elimination of violations during the construction and reconstruction of a capital construction facility dated 03/12/2016 g2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701486857
Unscheduled inspection
Start date: 2017-04-11, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701530082
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: This audit is conducted with the aim of carrying out federal state supervision over compliance with labor laws and other regulatory legal acts containing labor law norms in connection with the complaints received from employees of Davydov and Yatsenko EA LLC "Construction Technologies of the City" about the violation of labor rights
# 74170701318394
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-02-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: verification of the implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with an application received that includes issues related to remuneration ensuring that the employer complies with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms compliance with mandatory requirements or requirements established by municipal legal acts
# 74170701318067
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal electrical works of 1314 floors in axes 17 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701325538
Unscheduled inspection
Start date: 2017-01-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701254216
Unscheduled inspection
Start date: 2016-12-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701041810
Unscheduled inspection
Start date: 2016-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700918825
Unscheduled inspection
Start date: 2016-10-05, end date: 2016-10-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal electrical works on the 16th floor, the installation of the roof and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700323520
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-09-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the load-bearing structures of the inner walls of the floor slabs of the stairwell shafts of the basement before the construction of the load-bearing structures of the 1st floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601744033
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the bricklaying of the roof exit walls at OTM+29700 with the installation of the porch 2 during the installation work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 2 3 ST52 of the Urban Planning Code of the Russian Federation
# 74160601742670
Unscheduled inspection
Start date: 2016-08-08, end date: —, duration: —
Authority: —
Purpose of inspection: