# 772005263982
Unscheduled inspection
Start date: 2020-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005223616
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004477720
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004414249
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used by specialists in the organization of construction of the main engineers of the project
# 772004384270
Unscheduled inspection
Start date: 2020-03-27, end date: 2020-04-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004340670
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004264017
Unscheduled inspection
Start date: 2020-02-07, end date: 2020-03-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 772004220311
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004220295
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904047116
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 781904138645
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-27, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: Compliance with the requirements in the field of environmental protection provided for in the project documentation, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer, the customer, of compliance with the requirements of project documentation and other regulatory legal acts performed during the construction of reconstruction of capital construction facilities
# 771904111082
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 781903542720
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-25, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: compliance with project documentation
# 771903854433
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903642380
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803472406
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 781903017549
Unscheduled inspection
Start date: 2019-08-29, end date: 2019-09-25, duration: —
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: Compliance with the requirements in the field of environmental protection provided for in the project documentation, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer, the customer, of compliance with the requirements of the project documentation performed during the construction reconstruction of capital construction facilities
# 77190803458237
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803435244
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501902889077
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501902888858
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-07, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order dated 24042019 0342063200501
# 77190803354965
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 501802160954
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 341801960127
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation b the task of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and design documentation 7 The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and the construction materials used to meet the requirements of the design documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 501802374182
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341800661266
Unscheduled inspection
Start date: 2018-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501800645318
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-21, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of regulation 0824015800508 dated 29062018 due date until 20082018
# 501802357428
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341800269611
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and applied requirements of technical regulations of project documentation b availability of a building permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 77180803116581
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 501800205795
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-03-23, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the fulfillment of the requirement 0824015800505 from 21022018 to 16032018
# 501800201193
Unscheduled inspection
Start date: 2018-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501800198048
Unscheduled inspection
Start date: 2018-02-06, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 501800198084
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-02-12, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 13122017 0712082900505 with a deadline of up to 05022018 assessment of compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Capital construction facility Engineering storm sewer networks at the address Moscow region Domodedovo microdistrict Yuzhny verification of the execution of the order from 13122017 0712082900505 with a deadline of up to 05022018
# 341800077233
Unscheduled inspection
Start date: 2018-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803066845
Unscheduled inspection
Start date: 2018-01-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501700194935
Unscheduled inspection
Start date: 2017-12-07, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 50170803037252
Unscheduled inspection
Start date: 2017-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 71170803034380
Unscheduled inspection
Start date: 2017-12-27, end date: 2017-12-27, duration: —
Authority: Inspekciya Tulskoi oblasti po gosudarstvennomu arhitekturnostroitelnomu nadzoru
Purpose of inspection: The objectives of checking the fulfillment of the instruction of the inspection of the Tula region for state architectural supervision on the elimination of violations of EL31 dated 01112017 Tasks prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation Subject verification of compliance with the requirements of the instruction of the inspection of the Tula region for state architectural supervision on the elimination of violations of EL31 dated 01112017
# 50170802959062
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-15, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order 0824015800504 from 14112017 due date until 04122017
# 77170802877801
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-12-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 71170802824085
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-24, duration: —
Authority: Inspekciya Tulskoi oblasti po gosudarstvennomu arhitekturnostroitelnomu nadzoru
Purpose of inspection: the purpose of checking the fulfillment of the instruction IV13 from 07082017 on the basis of the expiration of the deadline for the fulfillment of the instruction of the task is to prevent identify and suppress violations of the legislation on urban development activities, including technical regulations and project documentation, the subject of checking the fulfillment of the instruction IV13 from 07082017
# 50170802763955
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-13, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the prescription from 05092017 0824015800503 the deadline for execution is 29092017
# 71170802586133
Unscheduled inspection
Start date: 2017-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 71170802585966
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-09, duration: —
Authority: Inspekciya Tulskoi oblasti po gosudarstvennomu arhitekturnostroitelnomu nadzoru
Purpose of inspection: Purpose verification of compliance with the requirements of the inspection PM03 from 03082017 on the basis of the expiration of the deadline for the fulfillment of the prescriptionthe task is to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentationsubject verification of compliance with the requirements of the inspection PM03 from 03082017
# 71170802776851
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-01, duration: —
Authority: Inspekciya Tulskoi oblasti po gosudarstvennomu arhitekturnostroitelnomu nadzoru
Purpose of inspection: Purpose verification of compliance with the instruction of the inspection EL24 of 28082017 on the basis of the expiration date of the prescription Task prevention detection and suppression of violations of legislation on urban development activities, including technical regulations and project documentationsubject verification of compliance with the requirements of the prescription EL24 of 28082017
# 77170802674992
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 50170701903170
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-18, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the prescription from 14072017 0824015800502 the deadline for execution is 11082017
# 77170801945174
Unscheduled inspection
Start date: 2017-08-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801945172
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 50170701895725
Unscheduled inspection
Start date: 2017-08-07, end date: 2017-08-10, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the regulation from 30062017 0342062100508
# 77170701861143
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 34170701855188
Unscheduled inspection
Start date: 2017-08-02, end date: 2017-08-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with the requirements technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 71170701833140
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50170801947889
Unscheduled inspection
Start date: 2017-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 52170701706703
Unscheduled inspection
Start date: 2017-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 44170701669914
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-06, duration: —
Authority: Departament stroitelstva arhitektury i gradostroitelstva Kostromskoi oblasti
Purpose of inspection: the purpose is to monitor the implementation of the instruction issued by the Department of Construction Architecture and Urban Planning of the Kostroma region dated January 24, 2017 14 the deadline for fulfilling the instruction is February 20, 2017 tasks are to establish the presence or absence of violations of the requirements established by the instruction in case of violations, taking response measures established by current legislation the subject of verification is the fulfillment of the instructions of state control supervision bodies
# 44170701669760
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-06, duration: —
Authority: Departament stroitelstva arhitektury i gradostroitelstva Kostromskoi oblasti
Purpose of inspection: the purpose is to monitor the implementation of the instruction issued by the Department of Construction Architecture and Urban Planning of the Kostroma region dated January 24, 2017 14 the deadline for fulfilling the instruction is February 20, 2017 tasks are to establish the presence or absence of violations of the requirements established by the instruction in case of violations, taking response measures established by current legislation the subject of verification is the fulfillment of the instructions of state control supervision bodies
# 77170701694393
Unscheduled inspection
Start date: 2017-06-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50170701675054
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-22, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 30032017 0712069902503 deadline up to 15052017 assessment of compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Residential building of the I155Mm series pos 44 at the address Moscow region Domodedovo MKR Yuzhny kvartal 4 verification of the execution of the order from 30032017 0712069902503 deadline up to 15052017
# 50170701675266
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-24, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 28032017 0712069903502 deadline up to 15052017 assessment of compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Residential building of the I155Mm series pos 45 at the address Moscow region Domodedovo MKR Yuzhny kvartal 4 verification of the execution of the order from 28032017 0712069903502 deadline up to 15052017
# 50170701667145
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-22, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 28032017 0712069901503 deadline up to 15052017 assessment of compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Residential building of the I155Mks series pos 47 at the address Moscow region Domodedovo MKR Yuzhny kvartal 4 cor 7 verification of the execution of the order from 28032017 0712069901503 deadline up to 15052017
# 50170701667103
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-22, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 28032017 0712069904501 deadline up to 15052017 assessment of compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Residential building of the I155Mm series pos 46 at the address Moscow region Domodedovo MKR Yuzhny kvartal 4 verification of the execution of the order from 28032017 0712069904501 deadline up to 15052017
# 34170701599212
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with the requirements technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 50170701562872
Unscheduled inspection
Start date: 2017-05-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50170701490732
Unscheduled inspection
Start date: 2017-03-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50170701458006
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-24, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the prescription from 15022017 0824015800501 the deadline is up to 10032017
# 50170701338061
Unscheduled inspection
Start date: 2017-01-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170701317495
Unscheduled inspection
Start date: 2017-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50160701226531
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-01, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the execution of the order dated 21102016 1234011300502 deadline until 30112016 assessment of compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility 17-storey 3-section residential building at the address Moscow region Pavlovsky Posad 1st May 1st lane building 4
# 34160700598664
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with the requirements technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work