# 522101403368
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out: in order to verify the fulfillment of the requirements of the regulation dated 09/06/2021 No. 519-03/01-04/132 issued by Kurs LLC, based on the approved inspection program for the capital construction facility, including during the construction stages (installation of aboveground structures, installation of internal engineering support networks), in order to assess compliance:
1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF);
2) the requirements established by Parts 2 and 3.1 of Article 52 of the Russian Civil Code;
3) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.
The task of the audit is to monitor compliance with the requirements of urban planning legislation and approved project documentation.
# 522100286259
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify the fulfillment of the requirements of the regulation dated 30.03.2021 No.519-03/01-04/46 issued to the person carrying out the construction, Kurs LLC, on the basis of an approved inspection program for the capital construction facility, in order to assess the compliance of the work and the construction materials used during the construction process, as well as the results of such work with the requirements of the approved project documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation, including including during the construction phase (installation of structures of the aboveground part).
The task of the audit is to monitor compliance with the requirements of urban planning legislation and approved project documentation.
# 522005202915
Unscheduled inspection
Start date: 2020-07-21, end date: 2020-08-17, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Nizhegorodskoi oblasti
Purpose of inspection: execution of Golikova's order
# 521902442245
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the approved inspection program for the capital construction facility, as well as in order to verify compliance with the requirements of regulations dated 01102018 519030204111 519030204112 issued to the general contractor of KURS LLC for assessing the compliance of work performed and building materials used during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, except for capital construction facilities which are not subject to energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, the fulfillment of the requirements set out in parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, including during the construction phase, the installation of an engineering support network, the installation of structures of the underground part up to otm 0000 of the administration building, the structures of the above-ground part of the garage with the installation of a block modular boiler house, the task of verification is to monitor compliance with the requirements of urban planning legislation and project documentation