Found 1 inspection:

# 722005219010
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-09, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, checking the availability of a construction permit, checking compliance with the requirements established by Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation. The basis is a notice from JSC Salekhardenergo on the completion of construction of a capital construction facility dated 02112020.7 Hereinafter, the notificationthe objectives of this audit are to prevent identify and suppress violations of legislation on urban development, project documentation, and other mandatory requirements


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.