# 772101426823
Unscheduled inspection
Start date: 2021-12-08, end date: 2021-12-17, duration: 8
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101418735
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101315485
Unscheduled inspection
Start date: 2021-11-12, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101311513
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101365752
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101346327
Unscheduled inspection
Start date: 2021-11-16, end date: 2021-11-29, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100735381
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100805019
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100461665
Unscheduled inspection
Start date: 2021-08-17, end date: 2021-08-30, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100464572
Unscheduled inspection
Start date: 2021-08-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100558844
Unscheduled inspection
Start date: 2021-08-31, end date: 2021-09-14, duration: 11
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100419209
Unscheduled inspection
Start date: 2021-08-04, end date: 2021-08-09, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100394899
Unscheduled inspection
Start date: 2021-07-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100294555
Unscheduled inspection
Start date: 2021-06-16, end date: 2021-06-18, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100291080
Unscheduled inspection
Start date: 2021-06-17, end date: 2021-06-30, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100287820
Unscheduled inspection
Start date: 2021-06-17, end date: 2021-06-25, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100281013
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-07-08, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100228835
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100151664
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-04-19, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100108377
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100035385
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-25, duration: 12
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100026809
Unscheduled inspection
Start date: 2021-02-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100031721
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105335306
Unscheduled inspection
Start date: 2021-02-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105296478
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005265151
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005207165
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005245258
Unscheduled inspection
Start date: 2020-11-27, end date: 2020-12-24, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the inspection are to carry out control measures in connection with the implementation of the inspection program. The objectives of the inspection are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being checked. The subject of the inspection is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code. The conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance with the requirements of the project documentation identified during construction control and state construction supervision
# 772004450612
Unscheduled inspection
Start date: 2020-07-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004465129
Unscheduled inspection
Start date: 2020-07-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004432904
Unscheduled inspection
Start date: 2020-07-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004470724
Unscheduled inspection
Start date: 2020-07-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004321225
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004293795
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004355743
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-03-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004367750
Unscheduled inspection
Start date: 2020-03-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004252087
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the person being audited.The subject of the audit is the presence of construction specialists, chief engineers of the project, the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy requirements efficiency and requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004296704
Unscheduled inspection
Start date: 2020-02-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004241002
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-02-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the establishment of violations of the requirements for a construction permit and the requirements specified in the construction permit. The objectives of the audit are to prevent the identification and suppression of violations of the requirements for a construction permit and the requirements specified in the construction permit. The subject of the audit is the presence of a construction permit
# 772004211715
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004220231
Unscheduled inspection
Start date: 2020-01-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004219818
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-01-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904040368
Unscheduled inspection
Start date: 2019-12-05, end date: 2020-01-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used
# 771904075837
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903980765
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903979115
Unscheduled inspection
Start date: 2019-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903883926
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903629467
Unscheduled inspection
Start date: 2019-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903643499
Unscheduled inspection
Start date: 2019-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803471834
Unscheduled inspection
Start date: 2019-08-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803455052
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803411286
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803396509
Unscheduled inspection
Start date: 2019-05-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803398451
Unscheduled inspection
Start date: 2019-04-18, end date: 2019-04-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803374769
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803354207
Unscheduled inspection
Start date: 2019-03-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803366387
Unscheduled inspection
Start date: 2019-03-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803322596
Unscheduled inspection
Start date: 2019-01-30, end date: 2019-02-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803302970
Unscheduled inspection
Start date: 2018-12-29, end date: 2019-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803299955
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803283791
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803283929
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-11-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803247230
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803218001
Unscheduled inspection
Start date: 2018-09-27, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 771800613788
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-31, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: establishment of compliance of the licensee's license applicant with licensing requirements verification of information on the activities of the licensee's license applicant on the availability and condition of equipment tools technical means measuring instruments technical documentation and other objects used by the licensee to carry out the licensed type of activity on compliance of employees of the licensee's license applicant with licensing requirements compliance of information contained in the application and documents of a legal entity or individual entrepreneur on the provision of legal the status of a special permit license for the right to carry out certain types of activities or permit approval for other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities unified state register of legal entities the register of individual entrepreneurs and other federal information resources the condition of premises buildings structures technical means equipment and other facilities that are supposed to be used by the license applicant or licensee in the implementation of the licensed type of activity and the availability of employees necessary for the implementation of the licensed type of activity in order to assess the compliance of such facilities and employees with licensing requirements
# 77180803193176
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803213517
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803191320
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803174565
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-07-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803172884
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803167650
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803136703
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803144537
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-06-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803121863
Unscheduled inspection
Start date: 2018-04-11, end date: 2018-04-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803090492
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803067625
Unscheduled inspection
Start date: 2018-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170803018752
Unscheduled inspection
Start date: 2017-12-21, end date: 2017-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170803006147
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802915647
Unscheduled inspection
Start date: 2017-11-29, end date: 2017-12-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802708011
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802764670
Unscheduled inspection
Start date: 2017-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802731269
Unscheduled inspection
Start date: 2017-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801944855
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802412730
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-09-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170801971851
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701873837
Unscheduled inspection
Start date: 2017-08-08, end date: 2017-08-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701785449
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701790408
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-07-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701768660
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701828419
Unscheduled inspection
Start date: 2017-07-24, end date: 2017-08-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701587023
Unscheduled inspection
Start date: 2017-06-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701668830
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701637125
Unscheduled inspection
Start date: 2017-05-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701549115
Unscheduled inspection
Start date: 2017-04-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701529391
Unscheduled inspection
Start date: 2017-04-10, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701446950
Unscheduled inspection
Start date: 2017-03-10, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701408821
Unscheduled inspection
Start date: 2017-03-09, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701391003
Unscheduled inspection
Start date: 2017-03-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701379213
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701302500
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-01-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used