Found 39 inspections:

# 002004161130
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800013767
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-01-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with paragraphs 1 to 2 of the regulation dated 29082017 P012706904, the deadlines for which have expired, the objectives of this audit are to verify compliance with the requirements of legislation in the field of industrial safety, to verify the availability of regulatory and technical documentation, to verify the compliance of existing technological processes in controlled industries with technological regulations and project documentation, to verify the organization and implementation of production control at hazardous production facilities. The subject of this audit is to verify the implementation of paragraphs 1 2 regulations dated 29082017 P012706904, the deadlines for which have expired


# 00170701578393
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701389939
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-10, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "Mining and transport part of the project documentation for the development of reserves of the Kyrgyz Medium subsurface area of Resource III Stage LLC located at the address Kemerovo region Prokopyevsky municipal district with Bolshaya Talda license KEM 01626 TE based on the inspection program 1 dated 21062016, the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentationthe subject of this inspection is the compliance of the work performed and the construction materials used and the results during the reconstruction of the capital construction facility "Mining and transport part of the project documentation development reserves of the Kyrgyz Medium subsurface area of LLC Resurs III Stage, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00160601694839
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-29, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: notification of the start of verification


# 422101300591
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the building materials used in the process of work on the installation of external power supply networks; for the ABC building - on the installation of external power supply networks, fire protection of metal structures, masonry walls of stairwells, plumbing and electrical work, partitions, interior and exterior decoration; landscaping, as well as the results of such work to the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the GRK RF, are part of such project documentation). The task of verifying compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. The subject of the audit is compliance with the requirements of the legislation of the Russian Federation in the field of urban development.


# 422100265906
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the building materials used in the process of work on the installation of external power supply networks; for the ABC building - on the fire protection of metal structures, laying walls of stairwells, plumbing and electrical work, partitions, interior and exterior decoration; landscaping requirements of the design documentation. The purpose of the audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. The subject of the audit is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development activities.


# 422105305691
Unscheduled inspection
Start date: 2021-01-28, end date: 2021-02-03, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the conformity of the work performed and the building materials used in the process of work on the installation of outdoor electrical and power supply networks; for the ABC building, installation of metal structures (porches, entrance groups), installation of monolithic structures (floor slabs, floor slabs, stairs, elevator shafts), wall and roof fencing, installation of window and door blocks; for the construction of storm water treatment plants - excavation, foundation construction, installation and insulation of the reservoir, backfilling of the foundations; landscaping according to the requirements of the project documentation. The task of verifying compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. The subject of the audit is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development activities.


# 422004447775
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-07-31, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the conformity of the work performed and the building materials used in the process of work on the installation of external power supply networks for the ABC building, fire protection of metal structures, the installation of monolithic structures of floor slabs for stairs, elevator shafts and reinforced concrete basement walls, the laying of stairwell walls, the fencing of walls and roofs, sanitary and electrical work, the installation of window blocks, the installation of partitions, the construction of sewage treatment plants stormwater runoff development of a foundation pit foundation construction landscaping of the site to the requirements of the project documentationproblems of verification compliance with the requirements of the legislation of the Russian Federation in the field of urban development during the construction of a capital construction objectproblems of verification compliance with the requirements of the legislation of the Russian Federation in the field of urban development


# 422004404907
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-05-18, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the building materials used in the process of work on the installation of outdoor networks of the WIC in the ABC building the installation of monolithic structures of floor slabs covering stairs, elevator shafts the installation of reinforced concrete walls of the basement and fencing of walls and roofs the installation of window blocks with the requirements of the design documentationthe purpose of this check is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning during construction The object of capital construction is subject to verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban planning


# 422004369959
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-22, duration:
Authority: YUzhnoSibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: this audit is conducted in order to monitor the elimination of Resource LLC violations, the fulfillment of which is mandatory in accordance with the previously issued instruction to the audited person on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 19062019 NCVAT240 p1, the deadline for which expires. The objectives of this audit are to monitor compliance with the mandatory requirements of Resource LLC in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of environmental protection in the field of The subject of this audit is the legal entity's compliance with the mandatory requirements of regulatory and legal acts, compliance with the instructions of state control bodies, municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals and plants, the environment, and measures to prevent emergencies of a natural and man-made nature


# 002004161130
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-01-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Prevention detection and suppression of violations of the legislation on urban planning activities, including project documentationcontrolling of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work with the requirements of project documentation, including energy efficiency requirements for the construction of a building. with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources are the availability of a construction permit, compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation during the construction of a capital construction facility "Mining and transport part of the project documentation for the development of reserves of the Novokazansky 2 subsurface area LLC "Resource" First Stage"


# 002004221270
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of violations specified in the order of the Siberian Directorate of Rostechnadzor dated 31102019 2501305 notification of LLC Resource dated 25122019 1 on the elimination of violations during the construction of reconstruction of capital construction facilities vh 1323710 dated 26122019 Verification of the elimination by a legal entity of the violation specified in the order on the elimination of violations dated 31102019 2501305 notification of LLC Resource dated 25122019 1 on the elimination of violations during the construction and reconstruction of capital construction facilities bx 1323710 dated 26/12/2019. Compliance with the regulations of the federal State construction Supervision authorities


# 421904061590
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-27, duration:
Authority: YUzhnoSibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: this inspection is carried out on the basis of the application of LLC Resurs vx 052288 dated 13112019 for the issuance of an opinion from the federal State environmental supervision authority regarding the capital construction project documentation "Mining and transport part of the project documentation for the development of reserves of the Novokazansky 2 subsurface area of LLC Resurs Pervaya Turn" located on the territory of Prokopyevsky and Novokuznetsk municipal districts of the Kemerovo region


# 421903986415
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001903839631
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, dated 01102019 2503219. Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of a capital construction facility "Mining and transport part of the project documentation for the development of reserves of the Novokazansky 2 subsurface area of Resource First Stage LLC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 421903594385
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 421902921761
Unscheduled inspection
Start date: 2019-08-12, end date: —, duration:
Authority:
Purpose of inspection:


# 421902715390
Unscheduled inspection
Start date: 2019-05-21, end date: —, duration:
Authority:
Purpose of inspection:


# 421902565045
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902530909
Unscheduled inspection
Start date: 2019-02-22, end date: 2019-02-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 191902488388
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-03-07, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: To establish that this audit is conducted for the purpose of overseeing compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the Turnover of Agricultural Land" as part of the execution of the previously issued order to eliminate violations of land legislation 301bZN dated 18052018 the deadline for the execution of the order is 01022019 the objectives of this audit are assessment of the compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the Turnover of Agricultural Land", The subject of this audit is to note the necessary compliance with the instructions of state control bodies, supervision bodies of municipal control


# 421802331523
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802144733
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802147737
Unscheduled inspection
Start date: 2018-11-21, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection:


# 421801732076
Unscheduled inspection
Start date: 2018-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 421801931109
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800633085
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800455512
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800363871
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800316408
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-05-22, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: Supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection of the use of agricultural lands, the turnover of which is regulated by Federal Law No. 24072002 101FZ "On the turnover of agricultural lands" in the framework of the previously issued regulation on the elimination of violations of land legislation 120220 vZN dated 24052017 deadline for the execution of the regulation until 01032018 The objectives of this audit is to assess the compliance of the activities of an economic entity with mandatory requirements the requirements of the land legislation of the Russian Federation for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural land" compliance with mandatory requirements or requirements established by municipal legal acts compliance with the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements compliance with the instructions of state control bodies, supervision bodies of municipal control


# 421800108502
Unscheduled inspection
Start date: 2018-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 001800013767
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-01-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with paragraphs 1 to 2 of the regulation dated 29082017 P012706904, the deadlines for which have expired, the objectives of this audit are to verify compliance with the requirements of legislation in the field of industrial safety, to verify the availability of regulatory and technical documentation, to verify the compliance of existing technological processes in controlled industries with technological regulations and project documentation, to verify the organization and implementation of production control at hazardous production facilities. The subject of this audit is to verify the implementation of paragraphs 1 2 regulations dated 29082017 P012706904, the deadlines for which have expired


# 42170802870262
Unscheduled inspection
Start date: 2017-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 00170802854413
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-11-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: KIP 1408PTSE077 dated 29082017


# 00170701578393
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-19, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to carry out state construction supervision of the capital construction facility "Mining and transport part of the project documentation for the development of reserves of the Kyrgyz Medium subsurface area of Resource III Stage LLC located at the address Kemerovo region Prokopyevsky municipal district with Bolshaya Talda license KEM 01626 TE based on the notice of completion of construction of the capital construction facility dated 18042017 g 387p vh 136142 dated 19042017, the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development by the developer and the technical customer, including the requirements of technical regulations for project documentation. The subject of this audit is the compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility "Mining and Transport part of the project documentation for the development of reserves of the Kyrgyz Sredny Sredny Resource LLC" Stage III" as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 42170701566924
Unscheduled inspection
Start date: 2017-04-19, end date: 2017-05-19, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: 1 Supervision of compliance with the requirements of the legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 24072002 101 FZ On the turnover of Agricultural Land on the basis of reasoned complaints vh 14zh dated 27032017 vh 15zh dated 27032017 vh 16 dated 27032017 2 Assessment of compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation requirements for the protection and enforcement of land for agricultural purposes, the turnover of which is regulated by Federal Law No. 24022002 101 FZ "On the Turnover of Agricultural land" 3 Compliance with the mandatory requirements established by municipal legal acts to prevent harm to the health of citizens, harm to animals, plants, the environment, and to eliminate the consequences of such harm


# 00170701389939
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-10, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "Mining and transport part of the project documentation for the development of reserves of the Kyrgyz Medium subsurface area of Resource III Stage LLC located at the address Kemerovo region Prokopyevsky municipal district with Bolshaya Talda license KEM 01626 TE based on the inspection program 1 dated 21062016, the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentationthe subject of this inspection is the compliance of the work performed and the construction materials used and the results during the reconstruction of the capital construction facility "Mining and transport part of the project documentation development reserves of the Kyrgyz Medium subsurface area of LLC Resurs III Stage, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00160601694839
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-29, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: notification of the start of verification


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.