Found 13 inspections:

# 002004322364
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004322319
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor dated 01102019. 418the purpose of this inspection is to verify the compliance of the work and construction materials used during the reconstruction of the capital construction facility "Reconstruction of the building of the experimental production complex of Novosibirsk State Technical University NSTU" as well as the results of such work with the requirements approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 422000162163
Unscheduled inspection
Start date: 2021-04-13, end date: 2021-04-15, duration: 3
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ustanovit, chto nastoyaschaya proverka provoditsya na osnovanii postupleniya izvescheniya ot 05.04.2021 № 21/405-1 (vh. ot 06.04.2021 № 341/4624) s celyu kontrolya ispolneniya predpisaniya Sibirskogo upravleniya Rostehnadzora ot 26.03.2021 № S-25-21-030, ot 26.03.2021 № S-25-21-031 ob ustranenii vyyavlennyh pravonarushenii. Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii. Predmetom nastoyaschei proverki yavlyaetsya: vypolnenie predpisanii organov federalnogo gosudarstvennogo stroitelnogo nadzora.


# 542100094268
Unscheduled inspection
Start date: 2021-02-16, end date: —, duration:
Authority: Upravlenie Federalnoi antimonopolnoi sluzhby po Novosibirskoi oblasti
Purpose of inspection:


# 422100031942
Unscheduled inspection
Start date: 2021-02-26, end date: 2021-03-26, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. Ustanovit, chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya Sibirskogo upravleniya Rostehnadzora ot 30.06.2020 № S-25-20-182 ob ustranenii vyyavlennyh pravonarushenii, srok ispolneniya kotorogo istek. Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom (podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle proektnoi dokumentacii. 7. Predmetom nastoyaschei proverki yavlyaetsya: vypolnenie predpisanii organov federalnogo gosudarstvennogo stroitelnogo nadzora.


# 422100031940
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 002004421223
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-07-06, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by the Deputy head of the Siberian Department of Rostechnadzor Kolegov DV dated 20122019 g 431the purpose of this inspection is to prevent identify and suppress violations of the legislation on urban development activities by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, the subject of this inspection is to verify the compliance of the work performed and the construction materials used materials in the process of construction of the capital facility "Bridge crossing over the river in the alignment of Hippodromskaya st, Novosibirsk Stage 0 Preparatory work" as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 3_8 and 3_9 article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used, the availability of a permit for construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004420428
Unscheduled inspection
Start date: 2020-06-03, end date: 2020-07-01, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 01102019. 418the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the subject of this inspection is to verify the compliance of the work and the construction materials used in during the reconstruction of the capital construction facility "Reconstruction of the building of the experimental production complex of Novosibirsk State Technical University NSTU" as well as the results of such work, the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 to 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 542004441847
Unscheduled inspection
Start date: 2020-06-30, end date: —, duration:
Authority:
Purpose of inspection:


# 002004322364
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-06, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya Sibirskogo upravleniya Rostehnadzora 2520018 ot 27012020 g ob ustranenii vyyavlennyh narushenii srok ispolneniya kotorogo istekZadachami nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov federalnogo gosudarstvennogo stroitelnogo nadzora


# 002004322319
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor dated 01102019. 418the purpose of this inspection is to verify the compliance of the work and construction materials used during the reconstruction of the capital construction facility "Reconstruction of the building of the experimental production complex of Novosibirsk State Technical University NSTU" as well as the results of such work with the requirements approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001904063039
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor dated 01102019. 418the purpose of this inspection is to verify the compliance of the work and construction materials used during the reconstruction of the capital construction facility "Reconstruction of the building of the experimental production complex of Novosibirsk State Technical University NSTU" as well as the results of such work with the requirements approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 541904036783
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-27, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti
Purpose of inspection: Cel ispolnenie ranee vydannogo predpisaniya 112059 ot 04102019 srok ispolneniya 11112019Zadacha proverka ustraneniya narushenii i vypolneniya trebovanii meropriyatii ukazannyh v predpisaniiPredmet ispolnenie predpisaniya 112059 ot 04102019 vydannogo inspekciei gosudarstvennogo stroitelnogo nadzora Novosibirskoi oblasti


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.