# 001800090775
Unscheduled inspection
Start date: 2018-02-15, end date: 2018-02-16, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 00170802711415
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-09, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 742100092749
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-04-21, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742105342239
Unscheduled inspection
Start date: 2021-02-11, end date: 2021-02-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the Installation of load-bearing and enclosing structures and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 741902600955
Unscheduled inspection
Start date: 2019-04-02, end date: 2019-04-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of the 49th floor before the start of the installation of load-bearing and enclosing structures of the 5th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902580394
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-03-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal engineering systems during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741902547125
Unscheduled inspection
Start date: 2019-03-06, end date: 2019-03-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of the technical floor for the installation of load-bearing and enclosing structures of the 14th floor before the start of the installation of load-bearing and enclosing structures of the 5th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802218529
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work performed when filling window openings, installing partitions, finishing facade surfaces and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802291858
Unscheduled inspection
Start date: 2018-12-14, end date: 2019-01-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed in meeting the requirements of sanitary and epidemiological nature of fire protection of buildings landscaping installation of elevator equipment fencing and glazing of balconies decoration of premises and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Verification of the completed construction of the facility 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802095403
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the foundation plate before the installation of the base panels and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802130934
Unscheduled inspection
Start date: 2018-11-21, end date: 2018-11-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of aluminum loggia fencing structures in the axes "15" "AB" and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741802094936
Unscheduled inspection
Start date: 2018-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802153897
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800962561
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-10-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of structures from the 6th to the 10th floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800680998
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the organization of the construction site, the removal of networks from the construction site, the removal of the axes of the object in kind, the development of the excavation pit and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800620248
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of structures from the 2nd to the 5th floors and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800569394
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the basement and ground floor structures, the laying of external engineering networks and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800525798
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-07-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the monolithic grillwork and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800565432
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the regulations of 2006-2018 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800396385
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the pile foundation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800487720
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the monolithic grillwork and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800487664
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the monolithic grillwork and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800423037
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures from the ceiling of the sixth floor to the technical floor installation of Windows in the axes "15" "AB" and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code Russian Federation
# 741800253375
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of reinforced concrete structures from the fourth to the sixth floor in axes 15 AB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741800166935
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-03-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures from the basement to the overlap of the 3rd floor of the axes "15" "AB" and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001800090775
Unscheduled inspection
Start date: 2018-02-15, end date: 2018-02-16, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 741800079415
Unscheduled inspection
Start date: 2018-02-19, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802978098
Unscheduled inspection
Start date: 2017-12-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802965158
Unscheduled inspection
Start date: 2017-12-11, end date: 2018-01-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the requirements of sanitary and epidemiological nature of fire protection of the building and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Verification of the completed construction of the facility
# 74170802965157
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802815877
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802796670
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the laying of internal engineering systems for electricity, heating, water supply, sewerage, finishing works and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802903153
Unscheduled inspection
Start date: 2017-11-29, end date: 2017-12-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of internal engineering systems, landscaping, installation of small architectural forms, facades, verification of fire-fighting sanitary and epidemiological measures, measures to ensure access for low-mobility groups of the population and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations, project documentation, Verification of the completed construction of the capital construction facility,2The receipt of a construction permit,3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802852014
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of window blocks before the installation of slopes and window sills and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 00170802711415
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-09, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 74170802631456
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work performed when filling window and door openings, finishing facade surfaces and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802631439
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on filling window openings of 710 floors prior to the slopes and installation of window sills finishing works in common areas plumbing installation of internal cold and hot water supply systems heating drainage installation of elevator equipment before the actual completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work requirements of technical regulations project documentation2 Permits for Building3compliance with the requirements of HR 23 ST52 of the Urban Planning Code of the Russian Federation
# 74170802527130
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The conformity of work on the installation of insulation on the technical floor of the annex, the installation of windows after completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701814636
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of structures of the technical floor, insulation of the attic, roofing and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701719588
Unscheduled inspection
Start date: 2017-06-21, end date: 2017-06-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of 910 floors of the structures of the technical floor of the parapet before the end of the installation of roofing panels and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701605448
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of the 58th floor before the start of the installation of load-bearing and enclosing structures of the 9th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701513045
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of supporting structures on the ground floor with the installation of supporting and enclosing structures on the 14th floor before the installation of supporting and enclosing structures on the 5th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701567366
Unscheduled inspection
Start date: 2017-04-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701567273
Unscheduled inspection
Start date: 2017-04-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701452114
Unscheduled inspection
Start date: 2017-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701401377
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-04-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701401232
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-04-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701401345
Unscheduled inspection
Start date: 2017-03-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701401304
Unscheduled inspection
Start date: 2017-03-06, end date: 2017-03-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the work on the installation of window blocks glazing of balconies waterproofing of the roof thermal insulation of the attic and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701479750
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 810 floors and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations of project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701479817
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 810 floors and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations of project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701385040
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-02-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of pile work prior to the start of work on the foundations and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701381905
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 46 floors prior to the start of installation of load-bearing and enclosing structures of the 7th floor and the building materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 Urban Planning Code Russian Federation
# 74170701381839
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 57 floors before the start of installation of load-bearing and enclosing structures of the 8th floor and the building materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 Urban Planning Code Russian Federation
# 74170701378754
Unscheduled inspection
Start date: 2017-02-14, end date: 2017-02-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the technical floor, the roofing and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701397672
Unscheduled inspection
Start date: 2017-02-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701397530
Unscheduled inspection
Start date: 2017-02-22, end date: 2017-03-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures at the roof level and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701302127
Unscheduled inspection
Start date: 2017-01-18, end date: 2017-01-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing structures on the 24th floor before the start of the installation of load-bearing and enclosing structures on the 5th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701320395
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site, the removal of networks from the construction site, the removal of the axes of the object in kind, the development of the excavation before the start of pile work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701320227
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of pile foundations before the installation of grillings and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701244401
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of supporting structures of the basement and first floor, exterior and interior walls, ceilings and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701229404
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures at the 5th floor level and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701229362
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures at the 5th floor level and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701214157
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701214159
Unscheduled inspection
Start date: 2016-12-16, end date: 2016-12-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701207728
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701206614
Unscheduled inspection
Start date: 2016-12-07, end date: 2016-12-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of pile foundations before the installation of grillings and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701206546
Unscheduled inspection
Start date: 2016-12-07, end date: 2016-12-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site, the removal of the axes of the object in kind, the development of the excavation pit and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701248430
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of the monolithic grillwork and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701070575
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing structures of external and internal walls floor slabs of staircases and platforms of the 2nd, 3rd and 4th floors windows external and internal engineering networks and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 Urban Planning the Code of the Russian Federation
# 74160701131743
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the implementation of fire-fighting and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population the arrangement of small architectural forms landscaping and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations for project documentation2 Obtaining a construction permit3 Complying with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701059368
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the construction site, the removal of the axes of the object in kind, the development of the excavation before the installation of the pile foundation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701127673
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the grillwork after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701121895
Unscheduled inspection
Start date: 2016-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701053090
Unscheduled inspection
Start date: 2016-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700870133
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site, the removal of networks from the construction site, the removal of the axes of the object in kind, earthworks, the foundation and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700870098
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site, the removal of networks from the construction site, the removal of the axes of the object in kind, earthworks, the foundation and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700823045
Unscheduled inspection
Start date: 2016-09-23, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160700870253
Unscheduled inspection
Start date: 2016-09-29, end date: 2016-10-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the construction site, the removal of the axes of the object in kind, the development of the excavation before the installation of the pile foundation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation