Found 20 inspections:

# 742201532282
Unscheduled inspection
Start date: 2022-01-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742101408394
Unscheduled inspection
Start date: 2021-12-07, end date: 2021-12-13, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the roof installation, installation of window and door blocks and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742101358610
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 742101244626
Unscheduled inspection
Start date: 2021-10-27, end date: 2021-11-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of external water supply, sewerage, heating networks and the construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100793709
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-10-04, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on masonry walls and partitions of the 2nd floor, installation of floors and building materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100362087
Unscheduled inspection
Start date: 2021-07-21, end date: 2021-07-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on laying walls and partitions on the 1st floor, installation of floors and building materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100226265
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741802138744
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the masonry of the parapet and ventilation shafts in the attic for the installation of a multilayer roof structure for the installation of rafter structures of a gable roof with an external drain for the installation of equipment pits, etc. for internal engineering heating systems for hot and cold water supply for the installation of power supply systems and electrical switchboard equipment for low-current systems for interior finishing and installation of technological equipment in facilities for complex automation of engineering systems for compliance with fire and sanitary epidemiological measures measures to ensure access for low mobility groups of the population and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802045257
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the landscaping of the territory adjacent to the kindergarten for the installation of small architectural forms and playgrounds for landscaping for the decoration of the basement for the installation of pits at the entrance to the basement and porches for the installation of an outdoor electric lighting system and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation 2 Availability of a permit for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802078341
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering systems and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801757149
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of precast concrete pavement on otm+3300 for filling the window openings of the kindergarten on the 1st floor before the slopes and installation of window sills for the installation of outdoor heating networks, water supply and sewerage networks, compliance with fire and sanitary epidemiological measures, materials during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of building permits 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801980389
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the interior and exterior decoration works, landscaping and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801878459
Unscheduled inspection
Start date: 2018-10-08, end date: —, duration:
Authority:
Purpose of inspection:


# 741800596995
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration:
Authority:
Purpose of inspection:


# 741800609006
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on dismantling walls floors and roofs strengthening the structure and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741800533597
Unscheduled inspection
Start date: 2018-07-11, end date: 2018-07-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of horizontal and vertical waterproofing of foundations on the masonry of the basement on the installation of a prefabricated floor of the technical basement on otm 0300 on the backfilling of the excavation sinuses before the start of work on the masonry of the exterior and interior walls of the 1st floor and the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800486852
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the zero cycle construction work, the installation of a prefabricated strip foundation made of PL concrete slabs and FBS blocks before the start of work on waterproofing the foundations and backfilling the sinuses of the excavation pit and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 The availability of a construction permit 3 The fulfillment of the requirements of hh Articles 23 and 31 of the Urban Planning Code of the Russian Federation


# 741800433564
Unscheduled inspection
Start date: 2018-06-09, end date: 2018-06-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the building axes during excavation work on the development of a foundation pit on compliance with fire and sanitary epidemiological measures prior to the installation of the ribbon foundation and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 74170802927464
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the strapping of the GRPB, the restoration of landscaping and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701787620
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-07-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a trench for laying a polyethylene gas pipeline, the construction of a polyethylene gas pipeline, the construction of an above-ground steel gas pipeline, the installation of GRPB and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation