# 00160700724851
Unscheduled inspection
Start date: 2016-07-20, end date: 2016-07-22, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka ustraneniya narushenii ukazannyh v predpisanii ot 06052016 570rp P20161
# 00160601566407
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-25, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka zaversheniya rabot
# 00160601566369
Unscheduled inspection
Start date: 2016-03-01, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: fulfilling the prescription
# 772101427849
Unscheduled inspection
Start date: 2021-12-06, end date: 2021-12-17, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772101362999
Unscheduled inspection
Start date: 2021-11-19, end date: 2021-11-23, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101362997
Unscheduled inspection
Start date: 2021-11-19, end date: 2021-11-23, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100708914
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100812222
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100365764
Unscheduled inspection
Start date: 2021-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100231994
Unscheduled inspection
Start date: 2021-05-21, end date: 2021-05-25, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 662100194599
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-21, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki informacii, postupivshei iz sredstv massovoi informacii 29.04.2021 (https://www.e1.ru/news/spool/news_id-69890195.html) o proisshestvii neschastnogo sluchaya s letalnym ishodom pri narushenii tehniki bezopasnosti pri stroitelstve rabot na obekte kapitalnogo stroitelstva «CHetyrehsekcionnyi zhiloi dom peremennoi etazhnosti № 3 (№№ 9A-9G po PZU), chetyrehsekcionnyi zhiloi dom peremennoi etazhnosti so vstroenno-pristroennymi nezhilymi pomescheniyami № 4
(№№ 10A-10G po PZU), pristroennyi dosugovyi centr (№ 8 po PZU), vstroenno-pristroennaya podzemnaya avtostoyanka so vstroennoi transformatornoi podstanciei
(№ 11 po PZU), kanalizacionnaya nasosnaya stanciya (№ 12 po PZU)» po adresu: Sverdlovskaya oblast, g. Ekaterinburg, po ulicam Mashinnoi i Tkachei, vyyavleniya faktov, prichin narusheniya gradostroitelnogo zakonodatelstva pri organizacii stroitelnyh rabot generalnym podryadchikom.
7. Predmetom nastoyaschei proverki yavlyaetsya provedenie meropriyatii
po predotvrascheniyu prichineniya vreda zhizni, zdorovyu lyudei, imuschestvu fizicheskih i yuridicheskih lic, organizacii likvidacii posledstvii prichineniya takogo vreda v sootvetstvii s polozheniyami chasti 2, podpunkta «b» punkta 2 chasti 5 stati 54 Gradostroitelnogo kodeksa Rossiiskoi Federacii.
# 662100041567
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-12, duration: 6
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki ispolneniya trebovanii predpisaniya ot 05.02.2021 № 29-14-29/5, vydannogo OOO «Alfa Stroi», zadachei nastoyaschei proverki yavlyaetsya: osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora.
# 772100080646
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-03-25, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100010979
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-17, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772005274655
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772004448726
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662004447242
Unscheduled inspection
Start date: 2020-06-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004433939
Unscheduled inspection
Start date: 2020-06-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004384201
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-03-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004334239
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004216466
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004222852
Unscheduled inspection
Start date: 2020-01-23, end date: 2020-01-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s proverkoi vypolneniya predpisaniyaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzoromsrokom ispolneniya do 15012020
# 661904126588
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904005943
Unscheduled inspection
Start date: 2019-11-21, end date: 2019-11-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of the notification of the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of Mosgosstroynadzor
# 661903891848
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661903896356
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-11-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 66 Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki dovodov ukazannyh v obraschenii ot 17102019 290101259251 zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora7 Predmetom nastoyaschei proverki yavlyaetsya proverka dovodov obrascheniya ot 17102019 290101259251
# 661903899712
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-11-08, duration: —
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: supervision of compliance with the requirements of labor legislation and regulations containing labor law norms
# 771903809152
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661903805869
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607642P ot 23 avgusta 2019 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora7 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607642P ot 23 avgusta 2019 goda
# 661902839726
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-19, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607162P ot 11 marta 2019 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora7 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607162P ot 11 marta 2019 goda
# 661902795337
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-06-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Kontrol ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 29160754P2 ot 15 fevralya 2019 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 29160754P2 ot 15 fevralya 2019 goda
# 661902769659
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-21, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 29130763P ot 26 aprelya 2019 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora7 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 29130763P ot 26 aprelya 2019 goda
# 661902715387
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-29, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291607196 P2 ot 29 marta 2019 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzoraPredmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291607196 P2 ot 29 marta 2019 goda
# 77190803426484
Unscheduled inspection
Start date: 2019-05-29, end date: 2019-06-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 661902745960
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902736743
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902630034
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 29170763p ot 14 fevralya 2019 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 29170763p ot 14 fevralya 2019 goda
# 77190803400601
Unscheduled inspection
Start date: 2019-04-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902648451
Unscheduled inspection
Start date: 2019-04-17, end date: 2019-04-30, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: cel kontrol ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291707115P1 ot 07 marta 2019 goda zadacha osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora predmet vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291707115P1 ot 07 marta 2019 goda
# 661902600329
Unscheduled inspection
Start date: 2019-04-02, end date: 2019-04-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 29160761P ot 15 fevralya 2019 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 29160761P ot 15 fevralya 2019 goda
# 77190803335668
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 661902502568
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-11, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607928P2 ot 17 dekabrya 2018 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607928P2 ot 17 dekabrya 2018 goda
# 661902433304
Unscheduled inspection
Start date: 2019-01-16, end date: 2019-01-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607865 P2 ot 07 dekabrya 2018 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607865 P2 ot 07 dekabrya 2018 goda
# 77180803246313
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 661801669469
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661801432335
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-10-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291307148 P1 ot 31 iyulya 2018 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291307148 P1 ot 31 iyulya 2018 goda
# 661801131922
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-10-05, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Cel kontrol ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291707431p2 ot 12 iyulya 2018 goda zadacha osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora predmet vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291707431p2 ot 12 iyulya 2018 goda
# 77180803219172
Unscheduled inspection
Start date: 2018-09-04, end date: 2018-09-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 661800487676
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607176P2 ot 27 aprelya 2018 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291607176P2 ot 27 aprelya 2018 goda
# 661800555076
Unscheduled inspection
Start date: 2018-07-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803188172
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803174662
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803172109
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 661800569207
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800417651
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii ot 13 aprelya 2018 goda 29130762P zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii ot 13 aprelya 2018 goda 29130762P
# 661800417556
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6 Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii ot 20 aprelya 2018 goda 291307154P zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora 7 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii ot 20 aprelya 2018 goda 291307154P
# 661800037596
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705S9846P ot 04 dekabrya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora7 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705S9846P ot 04 dekabrya 2017 goda
# 77180803087252
Unscheduled inspection
Start date: 2018-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800022437
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 5 Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291302742 ot 01 dekabrya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora 6 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291302742 ot 01 dekabrya 2017 goda
# 77170803061997
Unscheduled inspection
Start date: 2017-12-26, end date: 2017-12-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 66170802931163
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-29, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291302634 ot 20 oktyabrya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 77170802780020
Unscheduled inspection
Start date: 2017-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802881275
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-12-01, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6Predmetom nastoyaschei proverki yavlyaetsya vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291302595 ot 29 sentyabrya 2017 goda
# 77170802541604
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-10-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 66170701803968
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-07-31, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291605309P2 ot 11 maya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 77170701793004
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-07-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701768469
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701830674
Unscheduled inspection
Start date: 2017-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701760186
Unscheduled inspection
Start date: 2017-06-30, end date: 2017-07-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291705S9314P2 ot 09 iyunya 2017 goda
# 77170701637225
Unscheduled inspection
Start date: 2017-05-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701643925
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-06-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 6Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291302131 ot 06 aprelya 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 66170701621059
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-06-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291605171P2 ot 28 marta 2017 goda zadachami nastoyaschei proverki yavlyayutsya osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora
# 77170701504142
Unscheduled inspection
Start date: 2017-03-28, end date: 2017-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701338557
Unscheduled inspection
Start date: 2017-02-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160700951653
Unscheduled inspection
Start date: 2016-10-06, end date: 2016-10-19, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii 291604618P2 ot 03 avgusta 2016 goda
# 66160701029333
Unscheduled inspection
Start date: 2016-10-03, end date: 2016-10-17, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovanii 291302425 ot 19 avgusta 2016 goda zadachei nastoyaschei proverki yavlyaetsya osuschestvlenie gosudarstvennogo stroitelnogo nadzora
# 00160700724851
Unscheduled inspection
Start date: 2016-07-20, end date: 2016-07-22, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka ustraneniya narushenii ukazannyh v predpisanii ot 06052016 570rp P20161
# 00160601566407
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-25, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka zaversheniya rabot
# 00160601566369
Unscheduled inspection
Start date: 2016-03-01, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: fulfilling the prescription