Found 8 inspections:

# 522105313759
Unscheduled inspection
Start date: 2021-01-19, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection:


# 392004321442
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-04-13, duration:
Authority: Gosudarstvennaya inspekciya truda v Kaliningradskoi oblasti
Purpose of inspection:


# 521902650320
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-04-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of an approved inspection program for the capital construction facility, as well as in order to verify compliance with the requirements of regulation No. 519030301041 dated 18012019 issued to the general contractor Pharm Construction LLC to assess the compliance of work performed and building materials used during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities which energy efficiency requirements do not apply to, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, including during the construction phase of the aboveground structure, the task of verification is to monitor compliance with the requirements of urban planning legislation and design documentation


# 521801635286
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-09-27, duration:
Authority: Departament lesnogo hozyaistva Nizhegorodskoi oblasti
Purpose of inspection: Regulation 22 of 20082018


# 521800170743
Unscheduled inspection
Start date: 2018-03-16, end date: —, duration:
Authority:
Purpose of inspection:


# 52180803040072
Unscheduled inspection
Start date: 2018-01-10, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection:


# 52170802873924
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 52170802447632
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of an approved inspection program for the capital construction facility in order to verify compliance with the requirements of regulation No. 14062017 519030401045 issued to the technical customer, general contractor Pharm Construction LLC, to assess the compliance of work performed and building materials used during construction with the requirements of technical regulations, norms and rules, and design documentation, including during the construction phase of the Reproductor site."site "Domestic drinking water supply intake" site "PNS technical water supply intake"The purpose of the audit is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.