# 612005294476
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-20, duration: 5
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: verification of execution Order 0201329794 from 31082020 to 02112020 issued by the Office of ALL Tax ID 6145010807 The objectives of this audit are to prevent identify and suppress violations of the laws of fencing activity committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentation. The purpose of this audit is to verify compliance with the regulations of state control bodies supervision of municipal control agencies
# 611802290878
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-28, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: execution of the p6 inspection program Final inspection
# 611802098327
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-11-30, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: execution of the p5 inspection program external engineering networks internal engineering networks roofing installation finishing works landscaping of the adjacent territory
# 611801138548
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-09-25, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: execution of the p4 inspection program Roof installation external and internal engineering networks Finishing works of premises and common areas Landscaping
# 611800368157
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-20, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: execution of the p3 inspection program Bricklaying of building walls Installation of floor slabs of stairwells of precast reinforced concrete lintels Installation of engineering networks
# 611800185915
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-16, duration: —
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: verification of the execution of regulation 4 dated 29.012018