# 001902864903
Unscheduled inspection
Start date: 2019-07-05, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902673096
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-08, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 Ustanovit chto nastoyaschaya proverka provoditsya v sootvetstvii s programmoi provedeniya proverok p 1 utverzhdennoi zamestitelem rukovoditelya ZapadnoUra1 skogs upravleniya Rostehnadzora Loginovym VV 01022019 s celyu proverki sootvetstviya vypolneniya rabot i primeneniya stroitelnyh materialov e processe rekonstrukcii a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii vypolnenie trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zaka chikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov iny> normativnyh pravovyh aktov i proektnoi i rabochei dokumentacii 7 Predmetom gosudarstvennogo stroitelnogo nadzora yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelny materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheski reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheski^ resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa RF
# 00150600005584
Unscheduled inspection
Start date: 2015-07-08, end date: 2015-07-29, duration: —
Authority: Federalnaya sluzhba po trudu i zanyatosti
Purpose of inspection: rassmotreniya obrascheniya
# 162101440222
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162101314303
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine the compliance of the completed works, the construction materials used in the process of reconstruction of the capital construction facility, and the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/09/2021 case No. 12-04-2021/0068. prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, of compliance with the work performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and design documentation. Documentation
# 162100612213
Unscheduled inspection
Start date: 2021-09-08, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works, applied in the process of construction (reconstruction) of the capital construction facility of building materials, the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of capital construction facilities with metering devices for energy resources used; verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction, on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162100366094
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: opredelenie sootvetstviya vypolnyaemyh rabot, primenyaemyh v processe stroitelstva (rekonstrukcii) obekta kapitalnogo stroitelstva stroitelnyh materialov, rezultatov takih rabot trebovaniyam tehnicheskih reglamentov, proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; opredelenie sootvetstviya ustranennyh narushenii trebovaniyam proektnoi dokumentacii, drugih normativnyh aktov, a takzhe sostavleniya akta ob ustranenii narushenii na osnovanii postupivshim v Inspekciyu izvescheniem ob ustranenii narushenii pri stroitelstve, rekonstrukcii obekta kapitalnogo stroitelstva ot 13.07.2021 № 7367, kotoroe bylo predpisano ustranit v srok, ustanovlennyi predpisaniem ot 21.06.2021 № 15-12/0135-01 do 02.08.2021; preduprezhdenie, a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom, zakazchikom, licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom, narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov, inyh normativnyh pravovyh aktov i proektnoi dokumentacii; soblyudenie obyazatelnyh trebovanii ili trebovanii, ustanovlennyh municipalnymi pravovymi aktami.
# 162100279230
Unscheduled inspection
Start date: 2021-06-16, end date: 2021-03-15, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the completed works applied in the process of construction (reconstruction) of the capital construction facility of building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used; verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, ; prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out the construction, on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of design documentation; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162100243712
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162100111666
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-04-09, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works, applied in the process of construction (reconstruction) of the capital construction facility of building materials, the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of capital construction facilities with metering devices for energy resources used; verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction, on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction of the capital construction facility; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162100057926
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-03-15, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the completed works applied in the process of construction (reconstruction) of the capital construction facility of building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used; verification of the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, ; prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out the construction, on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of design documentation; compliance with mandatory requirements or requirements established by municipal legal acts.
# 162005256431
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-08, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 28102020 case 150420200008 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004482950
Unscheduled inspection
Start date: 2020-08-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004442075
Unscheduled inspection
Start date: 2020-07-03, end date: 2020-07-06, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 15042020 case 150420200008 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004427371
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-06-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 15042020 case 150420200008 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 162004401985
Unscheduled inspection
Start date: 2020-05-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902864903
Unscheduled inspection
Start date: 2019-07-05, end date: 2019-07-15, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 Ustanovit chtonastoyaschaya proverka provoditsya v sootvetstvii s programmoi provedeniyaproverok p 2 utverzhdennoi zamestitelem rukovoditelya ZapadnoUralskogo upravleniya Rostehnadzora Loginovym VV 18062019 s celyu proverki sootvetstviya vypolneniya rabot i primeneniya stroitelnyh materialov v processe rekonstrukcii a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii vypolnenie trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi FederaciiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi i rabochei dokumentacii 7 Predmetom gosudarstvennogo stroitelnogo nadzora yavlyaetsya proverka 1 K sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa RF
# 181902784136
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902808387
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-07, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya vypolneniya OOO «Konventstroiinzhiniring» ranee vydannogo ZapadnoUralskim Upravleniem Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru predpisaniya 2944419 ot 08052019Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi i rabochei dokumentacii7 Predmetom proverki yavlyaetsya ispolnenie ranee vydannogo Zapadno Uralskim Upravleniem Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru predpisaniya 2944419 ot 08052019
# 001902673096
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-08, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 Ustanovit chto nastoyaschaya proverka provoditsya v sootvetstvii s programmoi provedeniya proverok p 1 utverzhdennoi zamestitelem rukovoditelya ZapadnoUra1 skogs upravleniya Rostehnadzora Loginovym VV 01022019 s celyu proverki sootvetstviya vypolneniya rabot i primeneniya stroitelnyh materialov e processe rekonstrukcii a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii vypolnenie trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zaka chikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov iny> normativnyh pravovyh aktov i proektnoi i rabochei dokumentacii 7 Predmetom gosudarstvennogo stroitelnogo nadzora yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelny materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheski reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheski^ resursov nalichiya razresheniya na stroitelstvo vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo Kodeksa RF
# 16160701103471
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-11-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: opredelenie sootvetstviya vypolnyaemyh rabot primenyaemyh v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva stroitelnyh materialov rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obektov kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na osnovanii postupivshego v Inspekciyu izvescheniya ot 02112016 9785 o srokah zaversheniya rabot kotorye podlezhat proverke na obekte kapitalnogo stroitelstva preduprezhdenie a takzhe vyyavlenie i presechenie dopuschennyh zastroischikom zakazchikom licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili zakazchikom narushenii sootvetstviya vypolnyaemyh v processe stroitelstva obekta kapitalnogo stroitelstva rabot trebovaniyam tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 16160700780290
Unscheduled inspection
Start date: 2016-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160601772490
Unscheduled inspection
Start date: 2016-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16160601692851
Unscheduled inspection
Start date: 2016-07-01, end date: 2016-07-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Verification of compliance of the completed works with the requirements of technical regulations and project documentation
# 00150600005584
Unscheduled inspection
Start date: 2015-07-08, end date: 2015-07-29, duration: —
Authority: Federalnaya sluzhba po trudu i zanyatosti
Purpose of inspection: rassmotreniya obrascheniya