Found 75 inspections:

# 772100340462
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration:
Authority:
Purpose of inspection:


# 772100403551
Unscheduled inspection
Start date: 2021-07-30, end date: —, duration:
Authority:
Purpose of inspection:


# 772100392297
Unscheduled inspection
Start date: 2021-07-30, end date: 2021-08-19, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100213239
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100213234
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100213218
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100127470
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-05-05, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100048413
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-04-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100026378
Unscheduled inspection
Start date: 2021-02-19, end date: —, duration:
Authority:
Purpose of inspection:


# 772100026365
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-02-26, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772005292960
Unscheduled inspection
Start date: 2020-12-30, end date: —, duration:
Authority:
Purpose of inspection:


# 772005246632
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005191126
Unscheduled inspection
Start date: 2020-10-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772004448872
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004416134
Unscheduled inspection
Start date: 2020-05-22, end date: 2020-06-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used


# 772004364490
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 771903941448
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771903741957
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803481920
Unscheduled inspection
Start date: 2019-08-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803443095
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803413468
Unscheduled inspection
Start date: 2019-05-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803396388
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803398348
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803331303
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803344030
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803316216
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803320143
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-02-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803316223
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-01-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803321947
Unscheduled inspection
Start date: 2019-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803294035
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803293416
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803287048
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803275134
Unscheduled inspection
Start date: 2018-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803241934
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803246273
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803250895
Unscheduled inspection
Start date: 2018-10-10, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803247622
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803247614
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803230592
Unscheduled inspection
Start date: 2018-09-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803237237
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803240975
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-10-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803218425
Unscheduled inspection
Start date: 2018-09-06, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803223778
Unscheduled inspection
Start date: 2018-09-07, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803199009
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-09-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803205769
Unscheduled inspection
Start date: 2018-08-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803158021
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-07-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the presence of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, the presence of a construction permit, the compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803138676
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803144978
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-06-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the presence of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, the presence of a construction permit, the compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800363573
Unscheduled inspection
Start date: 2018-05-04, end date: 2018-06-01, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: the purpose and objective of this audit is to verify compliance with the mandatory requirements of legislation on participation in the shared construction of apartment buildings and or other real estate objects. The subject of an unscheduled documentary audit is compliance with the requirements of legislation on participation in the shared construction of apartment buildings and or other real estate objects


# 77180803128060
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803103166
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-03-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803099534
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803068240
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-02-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803068241
Unscheduled inspection
Start date: 2018-02-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803079680
Unscheduled inspection
Start date: 2018-01-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803066506
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803059147
Unscheduled inspection
Start date: 2018-01-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802989625
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802990508
Unscheduled inspection
Start date: 2017-12-14, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802897184
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802810532
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802830547
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802764820
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-10-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802772183
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-11-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802719096
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-10-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802719095
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-10-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802504967
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701894320
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170801934309
Unscheduled inspection
Start date: 2017-08-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701739797
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701739799
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701425634
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701353593
Unscheduled inspection
Start date: 2017-02-02, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701135645
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701028772
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the inspection is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of a notification received from the developer, the customer or the person carrying out the construction on the commencement of work for which state construction supervision is provided. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and design documentation committed by the audited person. The subject of this inspection is the compliance of the work and the applied construction materials in the process of construction reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.