Found 13 inspections:

# 741904036758
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a lightning protection cable wire at crossings through communications and the construction materials used during the construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31st st52 of the Urban Planning Code of the Russian Federation


# 741903572654
Unscheduled inspection
Start date: 2019-09-20, end date: 2019-09-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu provoda montazhu grozozaschitnogo trosa na odnocepnyh uchastkah montazh ustroistvo zazemlitelei metallicheskih opor 100 158 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902690701
Unscheduled inspection
Start date: 2019-05-15, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902547194
Unscheduled inspection
Start date: 2019-03-07, end date: 2019-03-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the grounding of supports, installation of a lightning protection cable on single-chain sections, wire installation, installation of anti-bird barriers, installation of struts and dampers used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902527946
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of foundations of supports installation of crossbars installation of metal supports installation of wires installation of lightning protection cable on single-chain sections and construction materials used during the construction of a capital construction facility as well as the results of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902480845
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-02-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the preparation of the breakdown of the support centers, the breakdown of the pits of metal supports and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801980250
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of wall sandwich panels of an overhead crane internal pipelines landscaping installation of electricity supply electric lighting after the actual completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800546121
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on concreting waterproofing of the foundation of the VN module of the monolithic oil receiver with the foundation device for the NN module drilling wells for reinforced concrete piles sinking piles under foundations grounding device and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800368917
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Proverka vypolneniya predpisaniya ot 16 aprelya 2018 g 2Nalichie razresheniya na stroitelstvo 3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800410126
Unscheduled inspection
Start date: 2018-05-31, end date: 2018-06-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of pits for the foundation of the VN foundation of the VN module of the monolithic oil receiver with crushed stone preparation reinforcement of the oil receiver and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800267847
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the breakdown of pits of metal supports, the installation of foundations of supports, the installation of metal supports, taking into account the consolidation assembly, the installation of supports on reinforced concrete racks, the installation of crossbars, the installation of wires, the grounding of supports and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800310717
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of metal supports, taking into account the enlargement assembly, the installation of a wire, the transition device in the span of supports 67, the transition device in the span of supports 1314, the transition device in the span 1415, the grounding device of supports, the installation of vibration dampers, the installation of information signs, testing, wrapping of supports and building materials used during the construction of a capital construction facility, as well as the results of such work, with technical requirements regulations of project documentation 2The receipt of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800235892
Unscheduled inspection
Start date: 2018-03-29, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.