# 742100024172
Unscheduled inspection
Start date: 2021-02-25, end date: 2021-03-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of works on landscaping of the construction site, installation of hydraulic fracturing and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility construction of metering devices for used energy resources;
2. Availability of a building permit.
3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742005255242
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005235928
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-11-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the works on the improvement of the construction site with the installation of GRPS and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005193789
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu gazoprovoda vysokogo davleniya i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742005147189
Unscheduled inspection
Start date: 2020-10-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902437485
Unscheduled inspection
Start date: 2019-01-22, end date: 2019-02-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka zakonchennogo stroitelstvom obekta 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741802129595
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-12-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu GRPSH ograzhdeniyu blagoustroistvu territorii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741802031106
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu polietilenovogo truboprovoda nizkogo davleniya blagoustroistvo trassy ustroistvo podvodov k domam i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741802078270
Unscheduled inspection
Start date: 2018-11-14, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741801878646
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline, the installation of a high-pressure pipeline, the installation of a low-pressure steel pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800894546
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800894594
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800583375
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800586066
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development work, laying of the gas pipeline, backfilling along Aerodromnaya Street, May 1, Shkolnaya Street, Shkolny Street, Sovetskaya Street and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800569553
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po razbivke osei gazoprovoda razrabotke transhei montazh podzemnogo truboprovoda i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800556586
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800447416
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work for the installation of the gas pipeline along Oktyabrskaya Ivanov Letyagina Street and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800487865
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-07-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the trench development work, the laying of the gas pipeline, the backfilling of Molodezhnaya Mira per Solnechny Street and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800362259
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development work, laying of the gas pipeline, backfilling along Novoselov Street, Dorozhnaya Sovetskaya Tsvetochnaya, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800249997
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu PGB i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800170566
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800067156
Unscheduled inspection
Start date: 2018-02-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800037036
Unscheduled inspection
Start date: 2018-02-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74180803033647
Unscheduled inspection
Start date: 2018-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802999221
Unscheduled inspection
Start date: 2017-12-25, end date: 2017-12-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802972978
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an underground low-pressure gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802844838
Unscheduled inspection
Start date: 2017-11-15, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701841549
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The actual condition of the capital construction facility 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701593648
Unscheduled inspection
Start date: 2017-05-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701528513
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po razrabotke transhei pod gazoprovod ustroistvu peschanoi podushki svarke gazoprovoda v pleti ukladke gazoprovodov v transheyu i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74160701243056
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot ustroistvo transhei osnovaniya ukladka pe truby gazoprovoda nizkogo davleniya obratnaya zasypka transhei ispytanie gazoprovoda posle fakticheskogo okonchaniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Soblyudenie trebovanii ch 23 st 52 Gradostroitelnogo kodeksa RF
# 74160701101643
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-11-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot obratnaya zasypka transhei podvodyaschego gazoprovoda montazh GRPB montazh nadzemnogo gazoprovoda iz stalnyh trub gruntovka okraska stalnyh trub gazoprovoda posle fakticheskogo okonchaniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Soblyudenie trebovanii ch 23 st 52 Gradostroitelnogo kodeksa RF
# 74160701088757
Unscheduled inspection
Start date: 2016-11-15, end date: 2016-11-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701075675
Unscheduled inspection
Start date: 2016-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701015654
Unscheduled inspection
Start date: 2016-10-18, end date: 2016-10-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot Razbivochnye raboty ryte transhei ustroistvo osnovaniya ukladka pe truby podvodyaschego gazoprovoda i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Soblyudenie trebovanii ch 23 st 52 Gradostroitelnogo kodeksa RF
# 74160700993282
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu podzemnogo truboprovoda i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74160700896815
Unscheduled inspection
Start date: 2016-10-03, end date: 2016-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the GRP and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700884690
Unscheduled inspection
Start date: 2016-10-03, end date: 2016-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po razrabotke transhei ustroistvu transhei pod gazoprovod ukladke gazoprovoda ukladke signalnoi lenty ustroistve vyhodov iz zemli ustroistvu futlyarov obratnoi zasypka transhei ot ul CHelyabinskaya do ul Zavodskaya razrabotke transhei ustroistvu transhei pod gazoprovod ukladke gazoprovoda ukladke signalnoi lenty ustroistvu vyhodov iz zemli ot ul Zavodskaya do GRPB ustroistvu GRPB i ograzhdeniya ustanovke zapornoi armatury i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74160701033052
Unscheduled inspection
Start date: 2016-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700068495
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the pipeline installation work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601748444
Unscheduled inspection
Start date: 2016-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160601752228
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the pipeline installation work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation