Found 100 inspections:

# 002004116373
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection:


# 001902591817
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection:


# 001802150274
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-23, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: ispolneniya p 10 protokola soveschaniya zamestitelya Predsedatelya Pravitelstva Rossiiskoi Federacii Kozaka DN ot 19092018 DKP9166pr ob organizacii i provedenii proverok Rosprirodnadzora s uchastiem Prokuratury Rossiiskoi Federacii v ramkah gosudarstvennogo ekologicheskogo nadzora na osnove dannyh NO «Fond razvitiya trubnoi promyshlennosti» i drugih obschestvennyh organizacii provesti proverki soblyudeniya zakonodatelstva v oblasti obrascheniya s othodami organizaciyami u kotoryh obrazuyutsya otrabotannye stalnye truby nefte i gazoprovodov klassificiruemye kak othody IV klassa opasnosti i organizaciyami osuschestvlyayuschih sbor hranenie obezvrezhivanie utilizaciyu takih othodov a takzhe vyyavlenie territorii promyshlennyh ploschadok na kotoryh osuschestvlyaetsya hranenie obezvrezhivanie utilizaciya i renovaciya takih trub i obespechit kontrol za ekspluataciei takih territorii kak obektov okazyvayuschih suschestvennoe negativnoe vozdeistvie na okruzhayuschuyu sredu


# 001800833745
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-27, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka provoditsya s celyu proverki soblyudeniya licenziatom licenzionnyh trebovanii pri provedenii ekspertizy promyshlennoi bezopasnosti na osnovanii prikaza Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru ot 28 fevralya 2018 g 86 izdannogo v sootvetstvii s porucheniem Pravitelstva Rossiiskoi Federacii ot 13022018 g AHP9771 Zadachei nastoyaschei proverki yavlyaetsya proverka soblyudeniya licenziatom obyazatelnyh trebovanii


# 00170701652417
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-06-21, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Moskve
Purpose of inspection: Verification of the execution of the order to eliminate violations of land legislation The tasks of the audit are to prevent identify and suppress violations of the requirements established by land legislation


# 772101446794
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772101440474
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration:
Authority:
Purpose of inspection:


# 502101182609
Unscheduled inspection
Start date: 2021-10-05, end date: 2021-11-01, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti «Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti»
Purpose of inspection: Compliance with mandatory requirements or requirements established by housing legislation, legislation on energy conservation and energy efficiency improvement; Fulfillment of the prosecutor's requirement; Verification of compliance with the requirements of housing legislation of the Russian Federation


# 772100725825
Unscheduled inspection
Start date: 2021-09-16, end date: 2021-10-13, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100965614
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-09-30, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100479718
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 772100462017
Unscheduled inspection
Start date: 2021-08-16, end date: 2021-08-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100297424
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772100186671
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-05-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100191742
Unscheduled inspection
Start date: 2021-05-12, end date: 2021-05-28, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100242464
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: 5
Authority: Gosudarstvennaya zhilischnaya inspekciya goroda Moskvy
Purpose of inspection: Proverki ispolneniya ranee vydannogo predpisaniya № R-SV-00023-OES/2 ot 19.04.2021; Preduprezhdenie, vyyavlenie i presechenie narushenii trebovanii zakonodatelstva; vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya.


# 772100168118
Unscheduled inspection
Start date: 2021-04-16, end date: —, duration: 5
Authority: Gosudarstvennaya zhilischnaya inspekciya goroda Moskvy
Purpose of inspection: to ensure the posting of complete and reliable information by persons providing housing and communal services in order to implement, from July 1, 2021, the provisions of Articles 159 and 160 of the Housing Code of the Russian Federation as amended by Federal Law No. 442-FZ of November 28, 2018 "On Amendments to Articles 159 and 160 of the Housing Code of the Russian Federation"; Prevention, detection and suppression of violations of legal requirements; compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 772100123269
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-05-05, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu: kontrolya vypolneniya punktov 3, 4 predpisaniya dolzhnostnogo lica ob ustranenii vyyavlennyh narushenii sanitarnyh trebovanii №01-03-00058 ot 15 dekabrya 2020 goda zadachami nastoyaschei proverki yavlyayutsya: kontrol za soblyudeniem obyazatelnyh trebovanii v sfere sanitarno - epidemiologicheskogo blagopoluchiya cheloveka Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora)


# 772100172581
Unscheduled inspection
Start date: 2021-04-22, end date: —, duration: 15
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po g. Moskva i Kaluzhskoi oblasti
Purpose of inspection: zadachami nastoyaschei proverki yavlyayutsya: ispolnenie i soblyudenie licenziatom - AO «MOSGAZ» pri osuschestvlenii deyatelnosti po adresu: 105120, g. Moskva, Mruzovskii pereulok, d. 11 licenzionnyh trebovanii.


# 772100030495
Unscheduled inspection
Start date: 2021-02-17, end date: 2021-03-18, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu: kontrolya vypolneniya punktov 1, 2 predpisaniya dolzhnostnogo lica ob ustranenii vyyavlennyh narushenii sanitarnyh trebovanii №01-03-00058 ot 15 dekabrya 2020 goda zadachami nastoyaschei proverki yavlyayutsya: kontrol za soblyudeniem obyazatelnyh trebovanii v sfere sanitarno - epidemiologicheskogo blagopoluchiya cheloveka Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora)


# 772005206600
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu zaschity prav i interesov rabotnikov v svyazi s rassmotreniem obrascheniya rabotnika ot 23092020 PR1235 po voprosam nevyplate zarabotnoi platy Zadachami proverki yavlyayutsya nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami sootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyam sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya provedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei srede obektam kulturnogo naslediya pamyatnikam istorii i kultury narodov Rossiiskoi Federacii muzeinym predmetam i muzeinym kollekciyam vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii dokumentam imeyuschim osoboe istoricheskoe znachenie nauchnoe kulturnoe znachenie vhodyaschim v sostav nacionalnogo bibliotechnogo fonda po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera po obespecheniyu bezopasnosti gosudarstva po likvidacii posledstvii prichineniya takogo vreda


# 772004459338
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004429749
Unscheduled inspection
Start date: 2020-06-11, end date: 2020-06-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004384265
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-03-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used


# 002004116373
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-02-07, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: proverka provoditsya s celyu proverki ustraneniya narushenii ukazannyh v Uvedomlenii o napravlenii perechnya nesootvetstvii kriteriyam akkreditacii po rezultatam okazaniya gosudarstvennoi uslugi po podtverzhdeniyu kompetentnosti ot 15112019 2694804AVZadachami nastoyaschei proverki yavlyayutsya ustanovlenie fakta ustraneniya akkreditovannym licom nesootvetstvii ego deyatelnosti trebovaniyam zakonodatelstva Rossiiskoi Federacii k deyatelnosti akkreditovannyh lic ukazannyh v Uvedomlenii o napravlenii perechnya nesootvetstvii kriteriyam akkreditacii po rezultatam okazaniya gosudarstvennoi uslugi po podtverzhdeniyu kompetentnosti ot 15112019 2694804AVPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 771904047059
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision


# 771904105368
Unscheduled inspection
Start date: 2019-12-17, end date: 2019-12-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision


# 771903809339
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration:
Authority:
Purpose of inspection:


# 771903809094
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the audited person. The subject is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the design documentation, including the requirements of energy efficiency and the requirements of the facility's equipment capital construction accounting devices for used energy resourcesperformance by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code


# 771903623599
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration:
Authority:
Purpose of inspection:


# 771903655383
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for the energy resources used are fulfilled by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code


# 771903644554
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s postupleniem izvescheniya zastroischika zakazchikaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkivypolnenie zastroischikom trebovanii chasti 31 stati 52 Gradostroitelnogo kodeksasootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 771903644778
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803472103
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code


# 77190803471096
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803473997
Unscheduled inspection
Start date: 2019-08-09, end date: 2019-08-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: vypolnenie zastroischikom trebovanii chasti 31 stati 52 Gradostroitelnogo kodeksanalichie specialistov po organizacii stroitelstva glavnyh inzhenerov proektasootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 77190803435283
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803435904
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources


# 771902807370
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-07-19, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: ocenki sootvetstviya soiskatelya licenzii licenzionnym trebovaniyam i sootvetstvie svedenii o soiskatele licenzii soderzhaschihsya v edinom gosudarstvennom reestre yuridicheskih lic i drugih federalnyh informacionnyh resursah po zayavleniyu yuridicheskogo lica 0116326 ot 10062019 o pereoformlenii licenzii


# 77190803426672
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803412758
Unscheduled inspection
Start date: 2019-05-15, end date: 2019-06-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code


# 77190803413201
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803413783
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803416705
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code


# 77190803408205
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803405756
Unscheduled inspection
Start date: 2019-04-26, end date: 2019-04-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code


# 77190803391784
Unscheduled inspection
Start date: 2019-04-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803381949
Unscheduled inspection
Start date: 2019-04-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803365500
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-03-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803367696
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, certificates of admission issued by a self-regulatory organization to works that affect the safety of capital construction facilities, construction permits


# 77190803366485
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803361837
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803367685
Unscheduled inspection
Start date: 2019-03-15, end date: 2019-04-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902591817
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-04-19, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: This inspection is carried out in order to comply with paragraph 10 of the protocol of the meeting of the Deputy Chairman of the Government of the Russian Federation Kozak DN dated 19092018 DKP9166pr on the organization and conduct inspections of Rosprirodnadzor with the participation of the Prosecutor's Office of the Russian Federation within the framework of state environmental supervision based on data from the NGO "Fund for the Development of the Pipe Industry" and other public organizations to verify compliance with legislation in the field of waste management by organizations which produce spent steel pipes of oil and gas pipelines classified as hazard class IV waste and organizations that collect store neutralize and dispose of such waste , as well as identify industrial sites where such pipes are stored, neutralized , disposed of , and renovated , and monitor the operation of such territories as facilities that have a significant negative impact on the environment.


# 77190803335881
Unscheduled inspection
Start date: 2019-02-14, end date: 2019-02-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803329050
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803328682
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803325301
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, certificates of admission issued by a self-regulatory organization to works that affect the safety of capital construction facilities


# 77190803316847
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803315121
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-01-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovnalichie svidetelstva o dopuske vydannye samoreguliruemoi organizaciei k rabotam kotorye okazyvayut vliyanie na bezopasnost obektov kapitalnogo stroitelstvanalichie razresheniya na stroitelstvoproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom


# 77190803317813
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-01-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, certificates of admission issued by a self-regulatory organization to works that affect the safety of capital construction facilities


# 77190803320283
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803305654
Unscheduled inspection
Start date: 2018-12-21, end date: 2019-01-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803306209
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803296962
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803299155
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803265170
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a construction permit compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803261964
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803285869
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 001802150274
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-23, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: ispolneniya p 10 protokola soveschaniya zamestitelya Predsedatelya Pravitelstva Rossiiskoi Federacii Kozaka DN ot 19092018 DKP9166pr ob organizacii i provedenii proverok Rosprirodnadzora s uchastiem Prokuratury Rossiiskoi Federacii v ramkah gosudarstvennogo ekologicheskogo nadzora na osnove dannyh NO «Fond razvitiya trubnoi promyshlennosti» i drugih obschestvennyh organizacii provesti proverki soblyudeniya zakonodatelstva v oblasti obrascheniya s othodami organizaciyami u kotoryh obrazuyutsya otrabotannye stalnye truby nefte i gazoprovodov klassificiruemye kak othody IV klassa opasnosti i organizaciyami osuschestvlyayuschih sbor hranenie obezvrezhivanie utilizaciyu takih othodov a takzhe vyyavlenie territorii promyshlennyh ploschadok na kotoryh osuschestvlyaetsya hranenie obezvrezhivanie utilizaciya i renovaciya takih trub i obespechit kontrol za ekspluataciei takih territorii kak obektov okazyvayuschih suschestvennoe negativnoe vozdeistvie na okruzhayuschuyu sredu


# 771802139500
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-12-11, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Moskve
Purpose of inspection: Verification of the execution of the order to eliminate violations of land legislation The tasks of the audit are to prevent identify and suppress violations of the requirements established by land legislation


# 77180803277669
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803257452
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-11-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803264001
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803265162
Unscheduled inspection
Start date: 2018-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803251635
Unscheduled inspection
Start date: 2018-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803247555
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803250874
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-10-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803228681
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803227217
Unscheduled inspection
Start date: 2018-09-18, end date: 2018-09-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803222697
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803226243
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, certificates of admission issued by a self-regulatory organization to works that affect the safety of capital construction facilities


# 77180803223960
Unscheduled inspection
Start date: 2018-09-06, end date: 2018-09-24, duration:
Authority: Gosudarstvennaya zhilischnaya inspekciya goroda Moskvy
Purpose of inspection: Proverka faktov izlozhennyh v obraschenii ot 01092018 GR011096818


# 77180803233503
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-10-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803197424
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803197423
Unscheduled inspection
Start date: 2018-08-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803189815
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803170207
Unscheduled inspection
Start date: 2018-07-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803187249
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-07-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 001800833745
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-27, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka provoditsya s celyu proverki soblyudeniya licenziatom licenzionnyh trebovanii pri provedenii ekspertizy promyshlennoi bezopasnosti na osnovanii prikaza Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru ot 28 fevralya 2018 g 86 izdannogo v sootvetstvii s porucheniem Pravitelstva Rossiiskoi Federacii ot 13022018 g AHP9771 Zadachei nastoyaschei proverki yavlyaetsya proverka soblyudeniya licenziatom obyazatelnyh trebovanii


# 77180803174413
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-04, duration:
Authority: Gosudarstvennaya zhilischnaya inspekciya goroda Moskvy
Purpose of inspection: Proverka ispolneniya ranee vydannogo predpisaniya ROZ077201 ot 23042018


# 771800486975
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-16, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: monitoring compliance with the rules for suspending the activities of hazardous industries and organizations on the basis of the order of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare 351 dated 14052018 "On conducting unscheduled inspections for compliance with the rules for suspending the activities of hazardous industries and organizations" issued in order to implement the order of the Government of the Russian Federation dated 13042018 RDP72189


# 77180803158876
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803164348
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-18, duration:
Authority: Gosudarstvennaya zhilischnaya inspekciya goroda Moskvy
Purpose of inspection: Proverka ispolneniya ranee vydannogo predpisaniya ROZ077191 ot 23042018


# 77180803166457
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803152392
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803138957
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 771800425935
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-06-20, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Moskve
Purpose of inspection: Verification of the execution of the order to eliminate violations of land legislation The tasks of the audit are to prevent identify and suppress violations of the requirements established by land legislation


# 77180803146520
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803126915
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-04-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.