Found 59 inspections:

# 742101321037
Unscheduled inspection
Start date: 2021-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 742101193059
Unscheduled inspection
Start date: 2021-10-18, end date: 2021-10-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the construction of the roadbed, paving, landscaping, reclamation and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100902798
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-10-04, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the construction of the roadbed, paving, artificial structures and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100528737
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100384155
Unscheduled inspection
Start date: 2021-07-30, end date: 2021-08-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the construction of the roadbed, paving, artificial structures and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100306000
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the construction of the roadbed, paving, artificial structures and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100231756
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004187838
Unscheduled inspection
Start date: 2020-01-23, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741904097063
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of small architectural forms after the completion of the work, the installation of internal engineering systems, the installation of technological equipment and building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for construction 3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903939500
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the landscaping works, driveways, sidewalks, landscaping of sites after the completion of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903815095
Unscheduled inspection
Start date: 2019-10-10, end date: —, duration:
Authority:
Purpose of inspection:


# 741903349440
Unscheduled inspection
Start date: 2019-09-19, end date: 2019-09-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of building structures on the 2nd floor, brickwork walls and partitions on the 1st and 2nd floors after the installation of slabs and applied building materials during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902900528
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of the 1st floor annex and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741902843069
Unscheduled inspection
Start date: 2019-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 741902781556
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-06-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the reconstruction of the existing building, the expansion of doorways, the installation of monolithic reinforced concrete floors, the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902716797
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the organization of the construction site and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741902583350
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802290004
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802289984
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802289970
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801774591
Unscheduled inspection
Start date: 2018-10-04, end date: 2018-10-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800647923
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 741800627733
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the GRPN installation works with the installation of GRPN fencing, purging and crimping of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800554512
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on cleaning the cavity of the gas pipeline, the installation of identification marks and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800576834
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of carpets, the installation of house pipes, the purging of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800576826
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of carpets, the installation of house pipes, the purging of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800534076
Unscheduled inspection
Start date: 2018-07-11, end date: 2018-07-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work with the excavator, manual modification of the soil, installation of a sand cushion, laying of pipelines D=315, laying of pipelines using the HDD method, installation of sewage wells, installation of a gate valve and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800542592
Unscheduled inspection
Start date: 2018-07-13, end date: 2018-07-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the development of a trench, the installation of a sand cushion, the laying of gas pipeline weaves, the filling of the gas pipeline, the laying of a signal tape, the backfilling of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meets the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3The requirements of hh 23 and 31st 52 of the Urban Planning Code of the Russian Federation


# 741800406163
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction project completed 2 Receipt of a construction permit 3 Fulfillment of the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800492413
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of trench development work, sand cushion installation, welding, laying of gas pipeline weaves, sprinkling of gas pipeline, laying of signal tape and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800492317
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of trench development work, sand cushion installation, welding, laying of gas pipeline weaves, sprinkling of gas pipeline, laying of signal tape and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800413948
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of trench development work, sand cushion installation, welding, laying of gas pipeline weaves, ballasting of the gas pipeline, sprinkling of the gas pipeline, laying of the signal tape, backfilling of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3The requirements of hh 23 and 31st 52 of the Urban Planning Code of the Russian Federation


# 741800492004
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-07-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the route, the development of a trench for a gas pipeline, the installation of a gas pipeline, the filling of the trench bottom with sand, the laying of a gas pipeline, the laying of a signal tape, the installation of basement entrances to houses and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741800475100
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-06-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development work, sand cushion installation, welding, laying of gas pipeline weaves, ballasting of the gas pipeline, sprinkling of the gas pipeline, laying of the signal tape, backfilling of the gas pipeline, purging of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741800475070
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-06-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development work, sand cushion installation, welding, laying of gas pipeline weaves, ballasting of the gas pipeline, sprinkling of the gas pipeline, laying of the signal tape, backfilling of the gas pipeline, purging of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 74180803050886
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-02-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction project completed 2 Receipt of a construction permit 3 Fulfillment of the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802913584
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 The receipt of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802913581
Unscheduled inspection
Start date: 2017-12-01, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170802816336
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802816335
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-12-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 The receipt of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802816327
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-12-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 The receipt of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802782870
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-11-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the breakdown of the route, the development of a trench for a gas pipeline, the sprinkling of the trench bottom with sand, the installation of a gas pipeline, the laying of a gas pipeline, the installation of basement entrances to houses, the sprinkling of a gas pipeline with sand, the laying of a signal tape upon completion of work, the cleaning of the gas pipeline cavity, the testing of the gas pipeline for tightness and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2the receipt of permits for building3compliance with the requirements of HH 23 and 31 ST52 of the Urban Planning Code of the Russian Federation


# 74170802729856
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-10-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the compliance of excavation work on strengthening roadsides, construction of culverts, the arrangement of the upper layer of the motorway pavement at the exits, the arrangement of the turntable of the bus stop pavilion, the installation of signal poles, the application of road markings and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit 3Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802729854
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-10-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of compliance of the work on the device of surface treatment with black rubble strengthening of roadsides installation of signal posts road signs barrier fencing application of road markings and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a building permit 3Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802729853
Unscheduled inspection
Start date: 2017-10-24, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802451668
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802451665
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802451662
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of the roadbed, the construction of culverts, the installation of the underlying layer of the base from the crushed stone mixture, the installation of the base from the fractionated crushed stone of the lower and upper layers of the ab coating and the construction materials used during the construction process, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The presence of a building permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802582808
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an underground low-pressure gas pipeline, the installation of an above-ground gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802582807
Unscheduled inspection
Start date: 2017-09-26, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701866868
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline to the installation of an underground gas pipeline of 1500 m, the installation of the foundation for the PHB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 art. 52 of the Urban Planning Code of the Russian Federation


# 74170701901679
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-08-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of preparatory work on the reconstruction of gas supply networks, the construction of an earthen bed, the installation of an additional layer of foundation, the construction of a road surface and the construction materials used during construction, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31st52 of the Urban Planning Code of the Russian Federation


# 74170701902338
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-08-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of preparatory work on the construction of an earthen bed for the repair of reinforced concrete pipes for the installation of an additional layer of foundation for the installation of pavement and building materials used during construction, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit 3Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701901676
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-08-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of preparatory work on paving, reconstruction of gas supply networks, installation of an additional layer of foundation, paving and construction materials used during construction, as well as the results of such work, with the requirements of technical regulations for project documentation2 Receipt of a construction permit 3Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701883268
Unscheduled inspection
Start date: 2017-08-23, end date: 2017-08-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the capital construction facility installation of an underground low-pressure gas pipeline installation of an above-ground gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74160701214100
Unscheduled inspection
Start date: 2016-12-22, end date: 2017-01-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hr 23 Art 52 of the Urban Planning Code of the Russian Federation


# 74160701105387
Unscheduled inspection
Start date: 2016-11-28, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701031191
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-11-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Development of a trench for a gas pipeline installation of a trench bottom installation of a gas pipeline installation of cases laying of a signal tape backfilling of a trench on Kirova 650m street 2 Availability of a building permit 3 Fulfillment of requirements of hh 23 st 52 of the Urban Planning Code of the Russian Federation


# 74160700884598
Unscheduled inspection
Start date: 2016-10-05, end date: —, duration:
Authority:
Purpose of inspection: