# 742005206794
Unscheduled inspection
Start date: 2020-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004482757
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the roadway and landscaping of the passage of the Central Square of the 23rd anniversary of October Street to the passage of the Central Square of Metallurgov Street from the Central Square to the Shkolny passage after completion of the work to replace the heating networks of Metallurgov Street after completion of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in the in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of facilities capital construction to which the requirements of energy efficiency do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004436141
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004416223
Unscheduled inspection
Start date: 2020-05-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903903226
Unscheduled inspection
Start date: 2019-10-31, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741903631708
Unscheduled inspection
Start date: 2019-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903572464
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the 23rd anniversary of October St. laying of reinforced concrete pipe after completion of the work on the 23rd anniversary of October St. landscaping after completion of the work on Metallurgov St. from the passage of the Central Square to the passage of the School landscaping after completion of the work on the Passage of the Central Square landscaping after completion of the work and the construction materials used during the construction of the capital construction facility as well as the results of such works according to the requirements of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903021228
Unscheduled inspection
Start date: 2019-09-05, end date: 2019-09-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the 23rd anniversary of October Street reconstruction of engineering networks roadbed installation laying of reinforced concrete pipe after completion of the work on Metallurgov Street from the passage of the Central Square to the passage of the School reconstruction of engineering networks roadbed arrangement after completion of the work on the Passage of the Central Square reconstruction of engineering networks roadbed arrangement after completion of the work and the construction materials used during the construction of the capital facility construction as well as the results of such work to the requirements of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902986394
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902891086
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-08-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the 23rd anniversary of October street excavation work after completion of the work on Metallurgov Street from the passage of the Central Square to the passage of the School dismantling work after completion of the work on the Passage of the Central Square dismantling work after completion of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802096881
Unscheduled inspection
Start date: 2018-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800661961
Unscheduled inspection
Start date: 2018-08-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800071499
Unscheduled inspection
Start date: 2018-02-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802992895
Unscheduled inspection
Start date: 2017-12-25, end date: 2017-12-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering heating systems internal cold and hot water supply and sanitation systems during electrical installation work on the installation of equipment in an electrical panel for the installation of internal engineering systems of supply and exhaust ventilation and smoke removal to comply with fire and sanitary epidemiological measures and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802815640
Unscheduled inspection
Start date: 2017-11-16, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802727176
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The correspondence of the work on filling the window openings of the first and second floors to the slopes and installation of window sills for the installation of concrete floors on the ground on the ground floor to otm0200 for the improvement and formation of microrelief, the installation of sidewalks and driveways along the facade “119” from the southeast side and the construction materials used during the construction of the capital construction facility as well as the results of such work requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74160700915896
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on landscaping for the installation of small architectural forms and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701020032
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-11-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of trays, asphalting of the dam crest and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700088228
Unscheduled inspection
Start date: 2016-09-08, end date: —, duration: —
Authority: —
Purpose of inspection: