# 002004481641
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-09-16, duration: 30
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: based on Rostechnadzor's instruction dated July 10, 2020 000706578 in order to fulfill the instructions of Deputy Chairman of the Government of the Russian Federation Abramchenko VA dated June 4, 2020 WAP116041 dated June 17, 2020 WAP116495 and instructions from Deputy Chairman of the Government of the Russian Federation Borisov YU dated June 30, 2020 YUBP97031, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts The purpose of this audit is to note the necessary compliance by a legal entity individual entrepreneur in the process of carrying out activities in the field of industrial safety requirements, as well as compliance with the specified requirements of the buildings, premises, structures, technical devices, equipment and materials of the technological processes being carried out
# 00170802705214
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-15, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo predpisaniya ot 11052017g 591858P2
# 00170802705213
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo predpisaniya ot 11052017g 591858P2
# 00160601567121
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567119
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567117
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567115
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567112
Unscheduled inspection
Start date: 2016-04-18, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00160601567109
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567106
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554523
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-09, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554521
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-09, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 002004481641
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-09-16, duration: 30
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: based on Rostechnadzor's instruction dated July 10, 2020 000706578 in order to fulfill the instructions of Deputy Chairman of the Government of the Russian Federation Abramchenko VA dated June 4, 2020 WAP116041 dated June 17, 2020 WAP116495 and instructions from Deputy Chairman of the Government of the Russian Federation Borisov YU dated June 30, 2020 YUBP97031, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts The purpose of this audit is to note the necessary compliance by a legal entity individual entrepreneur in the process of carrying out activities in the field of industrial safety requirements, as well as compliance with the specified requirements of the buildings, premises, structures, technical devices, equipment and materials of the technological processes being carried out
# 721902723261
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-08-09, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: cel kontrol vypolneniya punkta 1 ranee vydannogo OOO «Severneft Urengoi» predpisaniya ob ustranenii vyyavlennyh narushenii ot 23112017 7T dalee Predpisanie srok ispolneniya kotorogo istekaet 22 iyulya 2019 godaZadach proverka ustraneniya ranee vyyavlennyh narushenii lesnogo zakonodatelstva Rossiiskoi FederaciiPredmet proverka vypolneniya Predpisaniya
# 00170802705215
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-15, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo predpisaniya ot 11052017g 591858P2
# 00170802705214
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-15, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo predpisaniya ot 11052017g 591858P2
# 00170802705213
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo predpisaniya ot 11052017g 591858P2
# 89170701755835
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-07-25, duration: —
Authority: Federalnaya sluzhba po trudu i zanyatosti
Purpose of inspection: zaschity prav i interesov rabotnikov v svyazi s rassmotreniem obrascheniya rabotnikaDorohova EM
# 89170701564806
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-14, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po YAmaloNeneckomu avtonomnomu okrugu
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu soblyudeniya deistvuyuschego zakonodatelstva i inyh normativnyh pravovyh aktov Rossiiskoi Federacii v sfere prirodoohrannogo zakonodatelstva v ramkah vypolneniya yuridicheskim licom predpisaniya ot 31052016 17 vydannogo Upravleniem Rosprirodnadzora po YAmaloNeneckomu avtonomnomu okrugu po rezultatam vneplanovoi dokumentarnoi proverki OOO «Gazprom dobycha Nadym» provedennoi v mae 2016 akt ot 31052016 106 zadachami nastoyaschei proverki yavlyaetsya nadzor za soblyudeniem obyazatelnyh trebovanii v oblasti geologicheskogo izucheniya racionalnogo ispolzovaniya i ohrany nedrPredmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 89170701401455
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-28, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po YAmaloNeneckomu avtonomnomu okrugu
Purpose of inspection: Proverka vypolneniya predpisaniya 15 ot 29042016
# 89170701389154
Unscheduled inspection
Start date: 2017-02-03, end date: 2017-02-10, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po YAmaloNeneckomu avtonomnomu okrugu
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu soblyudeniya deistvuyuschego zakonodatelstva i inyh normativnyh pravovyh aktov Rossiiskoi Federacii v sfere prirodoohrannogo zakonodatelstva v ramkah vypolneniya yuridicheskim licom predpisaniya ot 25042016 13 vydannyh Upravleniem Rosprirodnadzora po YAmaloNeneckomu avtonomnomu okrugu po rezultatam planovoi vyezdnoi proverki OOO «SeverneftUrengoi» provedennoi v aprele 2016 akt ot 25042016 64 zadachami nastoyaschei proverki yavlyaetsya nadzor za soblyudeniem obyazatelnyh trebovanii v oblasti geologicheskogo izucheniya racionalnogo ispolzovaniya i ohrany nedr
# 89160701261448
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-20, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po YAmaloNeneckomu avtonomnomu okrugu
Purpose of inspection: Polozhenie ob Upravlenii Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya Rosprirodnadzora po YAmaloNeneckomu avtonomnomu okrugu utverzhdennoe prikazom Rosprirodnadzora ot 24062011 424 p 1 ch 2 st 10 Federalnogo zakona ot 26122008 294FZ «O zaschite prav yuridicheskih lic i individualnyh predprinimatelei pri osuschestvlenii gosudarstvennogo kontrolya nadzora i municipalnogo kontrolya» Zakon Rossiiskoi Federacii ot 21021992 23951 «O nedrah» Poruchenie Pravitelstva Rossiiskoi Federacii ot 11022016 AHP9726 obraschenie OOO «SeverneftUrengoi» ish 2570 ot 16122016 inye normativnye pravovye akty ustanavlivayuschie trebovaniya kotorye yavlyayutsya predmetom proverkinastoyaschaya proverka provoditsya s celyu preduprezhdeniya vyyavleniya i presecheniya narushenii deistvuyuschego zakonodatelstva i inyh normativnyh pravovyh aktov Rossiiskoi Federacii v ustanovlennoi sfere v ramkah vypolneniya yuridicheskim licom predpisanii ot 25042016 13 14 vydannyh Upravleniem Rosprirodnadzora po YAmaloNeneckomu avtonomnomu okrugu po rezultatam planovoi vyezdnoi proverki OOO «SeverneftUrengoi» provedennoi v period s 15042016 po 25042016 akt ot 25042016 64zadachei nastoyaschei proverki yavlyaetsya proverka vypolneniya yuridicheskim licom predpisanii ot 25042016 13 14
# 89160701247750
Unscheduled inspection
Start date: 2016-11-23, end date: 2016-11-25, duration: —
Authority: Departament prirodnoresursnogo regulirovaniya lesnyh otnoshenii i razvitiya neftegazovogo kompleksa YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: proverka ispolneniya OOO «SeverneftUrengoi» predpisaniya ob ustranenii vyyavlennogo narusheniya zakonodatelstva v oblasti ohrany okruzhayuschei sredy i narushenii prirodoohrannyh trebovanii ot 26052016 5E srok ispolneniya kotorogo istek 01 noyabrya 2016 goda
# 89160701188237
Unscheduled inspection
Start date: 2016-11-25, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po YAmaloNeneckomu avtonomnomu okrugu
Purpose of inspection:
# 00160601567121
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567119
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567117
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567116
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567115
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567112
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567109
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601567106
Unscheduled inspection
Start date: 2016-04-18, end date: 2016-05-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554523
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-09, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility
# 00160601554521
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-09, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance of the completed works with the requirements of technical regulations norms and rules of other normative legal acts of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for the energy resources used in the construction of the capital construction facility