# 262101487051
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration: 3
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program dated 11/24/2020 No. 24/09-2020 stage No. 4,5.
The objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person carrying out construction.
- compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks;
- compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation;
- compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 262101461811
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 262101314344
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program dated 11/24/2020 No. 24/09-2020 stage No. 2.
The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction.
- compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks;
- compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation;
- compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 262101487042
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: