# 001902578136
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-03-29, duration: —
Authority: Volzhskoe mezhregionalnoe territorialnoe upravlenie po nadzoru za yadernoi i radiacionnoi bezopasnostyu Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with paragraph 1 of Regulation 1329118TS dated October 19, 2018 issued by the Orenburg Inspection Department of the Volga MTU for the Supervision of the NRS of Rostechnadzor based on the results of a scheduled field inspection conducted on the basis of the order of the acting head of the Volga MTU for the Supervision of the NRS dated September 18, 2018 572
# 562101398785
Unscheduled inspection
Start date: 2021-12-07, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562100378658
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementing regional state construction supervision based on the inspection program approved on 06/30/2021.
- the objectives of this inspection are: to identify and prevent violations of the requirements of project documentation, legislation on urban development (Part 2 of art. 51, Part 2, 3.1, 6 of art. 52, Part 2, 4 of art. 53 of the Urban Planning Code of the Russian Federation).
- the subject of this check is: compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (including taking into account the changes made to the working documentation and which are in accordance with Part 1.3 52 of this Code as part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code); requirements for a construction permit; requirements established by parts 2 and 3.1 of Article 52 of this Code; requirements for the procedure for construction control, established by this Code and other regulatory legal acts; (item No. 1 of the inspection program dated 30.06.2021 – carrying out preparatory work, earthworks, installation of foundations for a sunflower seed heater)
# 562100223356
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Orenburgskoi oblasti
Purpose of inspection:
# 562100222641
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 562100195443
Unscheduled inspection
Start date: 2021-05-13, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementing regional state construction supervision on the basis of the developer's notice dated 04/28/2021 No. 1 on the completion of the construction of the capital construction facility;
- the objectives of this audit are: to identify and prevent violations of the requirements of the legislation on urban development (Part 2 of art. 51, Part 2, 3, 3.1, 6 of art. 52, Part 2, 4 of art. 53 of the Urban Planning Code of the Russian Federation).
- the subject of this audit is: assessment of the compliance of completed works and applied building materials during the construction of a capital construction facility, as well as the results of such work with the requirements of the design documentation, code: 00292-20 (positive expert opinion No. 56-2-1-2-021814-2020 dated 06/01/2020), taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of art. 49 of the Urban Planning Code. Code of the Russian Federation), including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, elimination of violations identified during construction control and regional state construction supervision; registration and submission of executive documentation
# 562100115229
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-04-15, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 03/23/2021;
- the objectives of this audit are: to identify and prevent violations of the requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, legislation on urban development (Part 2 of art. 51, Part 2, 3, 3.1, 6 of art. 52, Part 2, 4 of art. 53 Urban Planning Code of the Russian Federation);
-the subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of art. 49 of the Urban Planning Code of the Russian Federation), including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources (item No. 4 of the inspection program approved on 03/23/2021 – electrical installation; lightning protection and grounding, integrated automation; fire alarm; lighting)
# 562005246426
Unscheduled inspection
Start date: 2020-12-03, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562000115158
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-09-01, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program approved by 11062020 the objectives of this inspection are to identify and prevent violations of the requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used legislation on urban development h 2 art 51 h 2 3 31 6 art 52 Part 2 4 of Article 53 of the Urban Planning Code of the Russian Federation The subject of this audit is compliance with the mandatory requirements of urban planning legislation to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Articles 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to project documentation in accordance with Paragraphs 38 and 39 of Articles 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, paragraph 25 of the inspection program approved 11062020 installation of RVSF installation of metal structures installation of engineering networks installation of technological equipment installation of fire extinguishing systems collapsing device
# 562004500137
Unscheduled inspection
Start date: 2020-08-25, end date: 2020-09-01, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program approved by 11062020 the objectives of this inspection are to identify and prevent violations of the requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used legislation on urban development h 2 art 51 h 2 3 31 6 art 52 Part 2 4 of Article 53 of the Urban Planning Code of the Russian Federation the subject of this audit is compliance with the mandatory requirements of urban planning legislation to verify the compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Articles 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to project documentation in accordance with parts 38 and 39 of Articles 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources n 1 of the inspection program approved 11062020 Preparatory work foundation installation RVS5000 cubic meters
# 562004439407
Unscheduled inspection
Start date: 2020-06-25, end date: 2020-07-02, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the developer's notice dated 09062020 1 on the start of construction of a capital construction facility. The objectives of this inspection are to identify and suppress violations of the requirements of legislation on urban development activities h 2 art 51 h 2 3 31 5 6 art 52 h 2 4 Art 53 h 2 Art 55 of the Urban Planning Code The subject of this audit is compliance with the deadlines for the developer to send a notice of the start of construction of a capital construction facility compliance with urban planning legislation h 2 art 51 h 2 3 31 5 6 Art 52 h 2 4 Art 53 h 2 Art 55 of the Urban Planning Code of the Russian Federation
# 562004409512
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561903985611
Unscheduled inspection
Start date: 2019-11-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561903644245
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the developer's notification dated 10092019 1 on the start of construction of a capital construction facility. The objectives of this inspection are to identify and suppress violations of the requirements of legislation on urban development h 2 art 51 h 2 3 31 5 6 Art 52 h 2 4 Art 53 of the Urban Planning Code of the Russian Federation. compliance with the deadlines for sending a notice by the developer on the start of construction of a capital construction facility compliance with urban planning legislation h 2 art 51 h 2 3 31 5 6 Art 52 h 2 4 Art 53 of the Urban Planning Code of the Russian Federation
# 001902578136
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-03-29, duration: —
Authority: Volzhskoe mezhregionalnoe territorialnoe upravlenie po nadzoru za yadernoi i radiacionnoi bezopasnostyu Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with paragraph 1 of Regulation 1329118TS dated October 19, 2018 issued by the Orenburg Inspection Department of the Volga MTU for the Supervision of the NRS of Rostechnadzor based on the results of a scheduled field inspection conducted on the basis of the order of the acting head of the Volga MTU for the Supervision of the NRS dated September 18, 2018 572
# 561801685530
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 561801980686
Unscheduled inspection
Start date: 2018-10-31, end date: 2018-11-06, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Ensuring the observance and protection of the labor rights and freedoms of citizens, including the right to safe working conditions
# 561801914094
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-11-01, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to establish the facts of compliance with the regulation of 13102017 PNE2301 on the elimination of violations of legislation in the field of environmental protection. The objectives of this audit are to confirm the facts of compliance with the regulation of 13102017 PNE2301. The subject of this audit is the implementation of the regulation of the state control and supervision body
# 56170802563672
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection:
# 56160700928733
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-10-12, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Orenburgskoi oblasti
Purpose of inspection: verification of the fulfillment by a legal entity in connection with the expiration of a previously issued order dated 15/12/2015 22363B of an official authorized to carry out state supervision and control over the fulfillment of mandatory requirements of the legislation of the Russian Federation in the field of sanitary and epidemiological welfare of the population and consumer protection on the elimination of violations of mandatory requirements in accordance with paragraph 1 of part 2 of Article 10 of Federal Law No. 26 December 2008 294FZ