# 742005141396
Unscheduled inspection
Start date: 2020-09-30, end date: 2020-10-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po razrabotke kotlovana po ustroistvu osnovaniya pod monolitnye betonnye fundamenty v ryadah VZH” v osyah 17” po soblyudeniyu protivopozharnyh i sanitarnoepidemiologicheskih meropriyatii i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742101464440
Unscheduled inspection
Start date: 2021-12-24, end date: 2022-01-20, duration: 14
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu monolitnyh fundamentov pod oborudovanie v ryadah “V–D” v osyah “3–5” niz na otm.–6.330, v ryadah “V–E” v osyah “2–5” niz na otm.–6.410, po betonirovaniyu naruzhnyh sten cokolya i priyamkov v osyah “V–E” /“1–7” do otm.–0.540 i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.
# 742101277891
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100349735
Unscheduled inspection
Start date: 2021-07-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100222828
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100182516
Unscheduled inspection
Start date: 2021-04-23, end date: —, duration: 12
Authority: Glavnoe upravlenie «Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti»
Purpose of inspection: Execution of the order dated 02/22/2021 MX-P16-3531
# 742105324392
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-05, duration: 10
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: Osuschestvleniya kontrolya za vypolneniem predpisaniya po ustraneniyu narushenii ustanovlennyh trebovanii i meropriyatii v oblasti grazhdanskoi oborony № 3 ot 22 sentyabrya 2020 goda
# 742005206110
Unscheduled inspection
Start date: 2020-11-06, end date: 2020-11-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnyh betonnyh fundamentov s ustanovkoi ankernyh boltov v ryadah VE” v osyah 27” niz na otm7230 po osi 7” v ryadah AV”otm4200 po betonirovaniyu fundamentov pod blochnomodulnuyu kotelnuyu i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742004350849
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The actual condition of the object2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004178992
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-02-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004178949
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-02-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904109095
Unscheduled inspection
Start date: 2019-12-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741904096406
Unscheduled inspection
Start date: 2019-12-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741904096235
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the gas pipeline installation work with the hydraulic fracturing unit 1 and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation
# 741903987468
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903993590
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903857905
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the PK38PK3 gas pipeline installation and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or information model in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741903761918
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-10-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903643658
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on laying the PK73PK38 gas pipeline and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or information model in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741903055913
Unscheduled inspection
Start date: 2019-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802373767
Unscheduled inspection
Start date: 2018-09-18, end date: 2018-10-15, duration: —
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po CHelyabinskoi oblasti
Purpose of inspection: ustanovleniya dopolnitelnyh svedenii po faktam vyyavlennyh narushenii ukazannyh v motivirovannom predstavlenii dolzhnostnogo lica ot 27072018 g 79 po rezultatam analiza akta administrativnogo obsledovaniya Upravleniya Rosreestra po CHelyabinskoi oblasti ot 26032018g
# 741800662116
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800661917
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800751375
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-30, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu Ispolneniya podpunkta 51 punkta 5 protokola operativnogo soveschaniya Soveta Bezopasnosti Rossiiskoi Federacii ot 19072018 goda zadachami nastoyaschei proverki yavlyayutsya ocenka sootvetstviya osuschestvlyaemyh yuridicheskim licom individualnym predprinimatelem deyatelnosti ili deistvii bezdeistviya obyazatelnym trebovaniyam pozharnoi bezopasnosti Predmetom nastoyaschei proverki yavlyaetsya Soblyudeniya obyazatelnyh trebovanii pozharnoi bezopasnosti na obekte zaschity zadeistvovannyh v provedenii edinogo dnya golosovaniya
# 741800751289
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-30, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu Ispolneniya podpunkta 51 punkta 5 protokola operativnogo soveschaniya Soveta Bezopasnosti Rossiiskoi Federacii ot 19072018 goda zadachami nastoyaschei proverki yavlyayutsya ocenka sootvetstviya osuschestvlyaemyh yuridicheskim licom individualnym predprinimatelem deyatelnosti ili deistvii bezdeistviya obyazatelnym trebovaniyam pozharnoi bezopasnosti Predmetom nastoyaschei proverki yavlyaetsya Soblyudeniya obyazatelnyh trebovanii pozharnoi bezopasnosti na obekte zaschity zadeistvovannyh v provedenii edinogo dnya golosovaniya
# 741800495340
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800495370
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800051211
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-03-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 74170802938403
Unscheduled inspection
Start date: 2017-12-08, end date: 2018-01-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The verification of the completed construction of the object2the receipt of a construction permit3the observance of the requirements of parts 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170802938351
Unscheduled inspection
Start date: 2017-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802938317
Unscheduled inspection
Start date: 2017-12-08, end date: 2018-01-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The verification of the completed construction of the object2the receipt of a construction permit3the observance of the requirements of parts 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170803015306
Unscheduled inspection
Start date: 2017-12-27, end date: 2018-01-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu gazoprovoda po ul Tatischeva Burannaya Rechnaya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 74170802992850
Unscheduled inspection
Start date: 2017-12-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802873643
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802597340
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu gazoprovoda po ul Blyuhera ot doma 21 do doma 39 ul Ostrovskogo ul Stepnaya ul Beregovaya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 74170802597102
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po produvke pokraske gazoprovoda i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 74170802597056
Unscheduled inspection
Start date: 2017-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170801918379
Unscheduled inspection
Start date: 2017-08-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170801918462
Unscheduled inspection
Start date: 2017-08-30, end date: 2017-09-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu transhei montazhu gazoprovoda ul Stroitelei Vasnecova Ryabinovaya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Soblyudenie trebovanii ch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 74170701805202
Unscheduled inspection
Start date: 2017-08-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701759821
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of trenches, the installation of a gas pipeline along Stroitelei Street and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701759786
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of trenches, the installation of the gas pipeline along Tsiolkovsky Street, Veselaya Uralskaya, May 9, Friendship, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74150600101922
Unscheduled inspection
Start date: 2015-08-24, end date: 2015-08-28, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po CHelyabinskoi oblasti
Purpose of inspection: Federalnyi zakon ot 30031999 52FZ O sanitarnoepidemiologicheskom blagopoluchii naseleniya SanPiN 242282110 Sanitarnoepidemiologicheskie trebovaniya k usloviyam i organizacii obucheniya v obscheobrazovatelnyh uchrezhdeniyah SanPiN 245240908 Sanitarnoepidemiologicheskie trebovaniya k organizacii pitaniya obuchayuschihsya v obscheobrazovatelnyh uchrezhdeniyah uchrezhdeniyah nachalnogo i srednego professionalnogo obrazovaniya