# 742101170829
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903900701
Unscheduled inspection
Start date: 2019-11-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903857392
Unscheduled inspection
Start date: 2019-10-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902641477
Unscheduled inspection
Start date: 2019-04-17, end date: 2019-04-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the masonry work on the exterior and interior walls of the partitions for the installation of lintels of staircases and platforms on the 4th floor for the installation of precast concrete floors on the 4th floor in the lower block at otm+10080 before the masonry work on the exterior and interior walls of the 5th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements project documentation 2 Availability of a building permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 741800195993
Unscheduled inspection
Start date: 2018-03-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800016185
Unscheduled inspection
Start date: 2018-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701891119
Unscheduled inspection
Start date: 2017-08-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701759734
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701564356
Unscheduled inspection
Start date: 2017-05-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701449919
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-03-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the 2nd floor block section and 12 floors of the individual block insert before the installation of structures of the 3rd floor and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701302223
Unscheduled inspection
Start date: 2017-01-24, end date: 2017-01-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures bricklaying walls and partitions of floor slabs 2 floors of the block section before the installation of load-bearing and enclosing structures 3 floors for the installation of load-bearing and enclosing structures 1 2 floors of individual block installation before the installation of load-bearing and enclosing structures 3 floors and the building materials used during the construction of a capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation2 Obtaining a construction permit3compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701108353
Unscheduled inspection
Start date: 2016-11-22, end date: 2016-11-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The actual condition of the object2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation