# 742005264800
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-31, duration: 19
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: this audit is carried out in order to monitor the implementation of regulation 35311 of 13122019 on the elimination of violations of mandatory fire safety requirements. The objectives of this audit are to verify compliance with fire safety requirements, the execution of which was prescribed by a previously issued regulation on the elimination of violations, taking measures in case of non-compliance. The subject of this audit is to comply with the instructions of state control and supervision bodies
# 742005264796
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741904104250
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-20, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: control over the implementation of regulation 24411 of 04/12/2018 on the elimination of violations of mandatory fire safety requirements the tasks of this audit are to verify compliance with fire safety requirements, the execution of which was prescribed by a previously issued regulation on the elimination of violations, taking measures in case of non-compliance
# 741904104171
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-20, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: control over the implementation of regulation 24311 of 04/12/2018 on the elimination of violations of mandatory fire safety requirements the tasks of this audit are to verify compliance with fire safety requirements, the execution of which was prescribed by a previously issued regulation on the elimination of violations, taking measures in case of non-compliance
# 741904042002
Unscheduled inspection
Start date: 2019-12-12, end date: 2020-01-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of electric lighting systems of low-current SS APS SOWE spectator stands and team houses during the commissioning of technological equipment and during the integrated automation of engineering systems for the implementation of fire-fighting and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements for with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources Availability of a construction permit 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Verification of the completed construction of the facility
# 741902665522
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-06-04, duration: —
Authority: Glavnoe upravlenie lesami CHelyabinskoi oblasti
Purpose of inspection: verification of compliance with regulation 11 on the elimination of violations of the requirements of forest legislation identified as a result of the audit
# 741902603749
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering systems for heating hot and cold water supply of sewerage during electrical installation work on interior decoration for filling window and door openings of command houses 11 a” 11 b” 11 c” for the implementation of fire-fighting and sanitary epidemiological measures and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 741801914353
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800375929
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering heating systems, supply and exhaust ventilation and smoke removal for the installation of ventilation chambers on the 1st and 2nd floors in the spectator stands for the implementation of fire-fighting and sanitary epidemiological measures and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800304116
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration: —
Authority: Glavnoe upravlenie lesami CHelyabinskoi oblasti
Purpose of inspection: Checking the fulfillment of the prescription
# 741800284679
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the assembly and installation of wooden structures of command houses 11 a” 11 b” 11 c” the first and second floors and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741800286846
Unscheduled inspection
Start date: 2018-03-23, end date: 2018-04-19, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: this audit is conducted in order to carry out federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms The objectives of this audit are to ensure that the employer complies with the labor legislation of the Russian Federation and other regulatory legal acts containing labor law norms The subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 741800026688
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800011234
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-01-31, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the application received on 25122017 7545717 for compliance with mandatory requirements and or requirements established by municipal legal acts
# 74170802976715
Unscheduled inspection
Start date: 2017-12-22, end date: 2017-12-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work during electrical installation work on the device of low-current systems for the installation of entrances and porches of floors in the premises of spectator stands with commentator booths for the installation of stained glass windows and building materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations of project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802767743
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of a retaining wall for filling window openings of spectator stands for laying outdoor power supply and sanitation networks to spectator stands for compliance with fire-fighting and sanitary epidemiological measures and building materials used during the construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 74170802658175
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of a flat roof at the level of the rooms of commentator cabins on otm+9850 for the installation of a hinged system of ventilated facades of commentator cabins on the facade “267” and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 74170701826285
Unscheduled inspection
Start date: 2017-08-03, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701784317
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Compliance with the regulation of June 14, 20172the receipt of a construction permit 3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701724151
Unscheduled inspection
Start date: 2017-07-06, end date: 2017-07-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of metal structures of the second tier for the device of overlapping of the subtribe space from otm+0770 to otm+5570 floor slabs under the commentator cabins of otm+6850 before the start of work on the installation of farms for the implementation of fire-fighting and sanitary epidemiological measures and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design Documentation2the presence of a building permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701634978
Unscheduled inspection
Start date: 2017-06-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701598994
Unscheduled inspection
Start date: 2017-05-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701528562
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the device of the buried part of the team houses “11b” for the installation of metal structures of the spectator stands in the axes “J” “1015” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701450037
Unscheduled inspection
Start date: 2017-03-23, end date: 2017-03-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of metal structures of the first tier on the masonry of the exterior walls and partitions of the first floor of the spectator stands before the installation of the floor slabs on the otm+1810 rooms above the commentator booths and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701386355
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The conformity of work on the installation of foundation blocks for the installation of vertical and horizontal waterproofing of spectator stands before the start of work on the installation of metal structures of the first tier and the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701162498
Unscheduled inspection
Start date: 2016-10-05, end date: 2016-10-31, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the appeal received on 29092016 7509116 ensuring compliance with and protection of labor rights and freedoms of citizens
# 74160601752383
Unscheduled inspection
Start date: 2016-08-04, end date: 2016-08-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of outdoor water supply networks B2 and B3 for installation and commissioning at the VOC and KNS for the installation of entrances and porches of the ASK and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700050215
Unscheduled inspection
Start date: 2016-08-25, end date: 2016-09-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction of the object