Found 317 inspections:

# 922101420998
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration:
Authority:
Purpose of inspection:


# 922101428213
Unscheduled inspection
Start date: 2021-12-09, end date: 2021-03-29, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 30.03.2021. Tasks: assessment of the compliance of the activities of the State Committee for Civil Engineering GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922101371466
Unscheduled inspection
Start date: 2021-12-09, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to implement the inspection program dated 12/21/2020. Tasks: assessment of the compliance of the activities of the State Committee for Civil Engineering GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922101513834
Unscheduled inspection
Start date: 2021-12-28, end date: —, duration:
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection:


# 922101398189
Unscheduled inspection
Start date: 2021-12-06, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to implement the inspection program dated 04/22/2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922101371484
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection:


# 922101371384
Unscheduled inspection
Start date: 2021-12-02, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 28.01.2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922101466064
Unscheduled inspection
Start date: 2021-12-17, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to carry out an inspection of the completed construction, reconstruction of the capital construction facility, based on the received notice of completion of construction, reconstruction of the capital construction facility reg. No. 494-04-137 dated 12/07/2021 (ex. no. 3468/01-25-1-23/01/21 dated 07.12.2021); Tasks: to assess the compliance of the activities of the State Committee for Civil Engineering GS "EDKS", during the construction of the facility, with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922101465982
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 922101462437
Unscheduled inspection
Start date: 2021-12-17, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to carry out an inspection of the completed capital construction facility, based on the received notice of completion of construction, reconstruction of the capital construction facility per. No. 496-04-132 (ex. no. 3466/01-25-1-23/01/21 dated 07.12.2021) Tasks: assessment of compliance of the activities of the State-owned institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility of part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922101465902
Unscheduled inspection
Start date: 2021-12-17, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to carry out an inspection of the completed construction, reconstruction of the capital construction facility, based on the received notice of completion of construction, reconstruction of the capital construction facility reg. No. 497-04-104 dated 12/10/2021 (ex. no. 3568/01-25-1-23/01/21 from 10.12.2021); Tasks: assessment of the compliance of the activities of the State Committee for Civil Engineering GS "EDKS", during the construction of the facility, with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922101466082
Unscheduled inspection
Start date: 2021-12-17, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to carry out an inspection of the completed construction, reconstruction of the capital construction facility, based on the received notice of completion of construction, reconstruction of the capital construction facility reg. No. 495-04-130 dated 12/07/2021 (ex. no. 3467/01-25-1-23/01/21 dated 07.12.2021); Tasks: to assess the compliance of the activities of the State Committee for Civil Engineering GS EDKS, during the construction of the facility, with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922101371500
Unscheduled inspection
Start date: 2021-12-15, end date: 2021-12-28, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 02/27/2020, Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation., Subject: compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 922101434564
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration:
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection:


# 922101447124
Unscheduled inspection
Start date: 2021-12-16, end date: 2021-03-29, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 04/16/2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922101444978
Unscheduled inspection
Start date: 2021-12-16, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to carry out an inspection of the completed capital construction facility, based on the received notice of completion of construction, reconstruction of the capital construction facility per. No. 482-04-61 (ex. no. 3377/01-25-1-23/01/21 dated 12/01/2021) Tasks: assessment of compliance of the activities of the State-owned institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility of part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922101434608
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration:
Authority:
Purpose of inspection:


# 922101434148
Unscheduled inspection
Start date: 2021-12-13, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to carry out an inspection of a completed construction or reconstruction of a capital construction facility, based on the received notice of completion of construction or reconstruction of a capital construction facility. No. 80-04-0653 dated 12/01/2021 (ex. no. 3379/01-25-1-23/01/21 dated 12/01/2021); Tasks: assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction", during the construction of the facility, with the requirements of part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922101447201
Unscheduled inspection
Start date: 2021-12-14, end date: —, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: to establish the actual condition of the facility, to verify that the work performed and the building materials used during construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation; to implement the inspection program dated 05/11/2021; tasks: to assess the compliance of the activities of the State Committee for Civil Engineering GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1,4 and 6 of Articles 52, 53 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922101371424
Unscheduled inspection
Start date: 2021-12-14, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to implement the inspection program dated 05/25/2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922101188446
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration:
Authority:
Purpose of inspection:


# 922101375494
Unscheduled inspection
Start date: 2021-11-26, end date: 2021-12-28, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 08/03/2021, Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation., Subject: compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 922101330269
Unscheduled inspection
Start date: 2021-11-18, end date: 2021-03-29, duration: 9
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 07/22/2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922101336749
Unscheduled inspection
Start date: 2021-11-17, end date: 2021-03-29, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 11/24/2020. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100752078
Unscheduled inspection
Start date: 2021-10-13, end date: —, duration:
Authority:
Purpose of inspection:


# 922101171643
Unscheduled inspection
Start date: 2021-10-11, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to implement the inspection program dated 30.06.2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922101184358
Unscheduled inspection
Start date: 2021-10-12, end date: 2021-03-19, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 06/23/2021. Tasks: to assess the compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922101139143
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration:
Authority:
Purpose of inspection:


# 922101062373
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration:
Authority:
Purpose of inspection:


# 922101149623
Unscheduled inspection
Start date: 2021-10-07, end date: 2021-03-19, duration: 5
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: verification of compliance with the requirements of the regulation on the elimination of violations during construction and reconstruction of the capital construction facility No. 92-07-0705-040401-40-6 dated 06/25/2021, issued to the legal entity GKU GS "EDKS" and No. 92-07-0705-040402-40-7 dated 06/25/2021, to the official director of GKU GS "EDKS" Babkin V.V., based on the expiration date of the regulations issued by Sevgosstroynadzor on the elimination of violations of mandatory requirements. Tasks: verification of compliance with the requirements of the regulation on the elimination of violations during construction and reconstruction of the capital construction facility No. 92-07-0705-040401-40-6 dated 06/25/2021, issued to the legal entity GKU GS "EDKS" and No. 92-07-0705-040402-40-7 dated 06/25/2021, to the official director of GKU GS "EDKS" Babkin V.V., based on the expiration date of the regulations issued by Sevgosstroynadzor on the elimination of violations of mandatory requirements. Subject: compliance with the regulations of the state control (supervision) bodies


# 922101062275
Unscheduled inspection
Start date: 2021-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 922101099897
Unscheduled inspection
Start date: 2021-10-18, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 03/01/2021. Tasks: assessment of the compliance of the activities of the State Committee for Civil Engineering GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922101197953
Unscheduled inspection
Start date: 2021-10-18, end date: 2021-03-19, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to conduct an inspection of the completed capital construction facility, based on the received notice of completion of construction, reconstruction of the capital construction facility No. 449-04-108 dated 09/29/2021 (ex. no. 2633/01-25-1-23/01/21 dated 09/29/2021). Tasks: to assess the compliance of the activities of the State Committee for Civil Engineering of the EDKS State Corporation during the construction of the facility with the requirements of Part 2 of Article 51, Part 2, Part 3.1, part 4, Part 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922100678135
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 922100632952
Unscheduled inspection
Start date: 2021-09-15, end date: 2021-03-19, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 04/14/2021. Tasks: to assess the compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922100632985
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-03-19, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 04/07/2021. Tasks: to assess the compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922100678036
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration:
Authority:
Purpose of inspection:


# 922100632872
Unscheduled inspection
Start date: 2021-09-10, end date: —, duration:
Authority:
Purpose of inspection:


# 922100608761
Unscheduled inspection
Start date: 2021-09-10, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to implement the inspection program dated 04/28/2021. Tasks: assessment of compliance of the activities of the GKU GS EDKS during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922100580707
Unscheduled inspection
Start date: 2021-09-06, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to implement the inspection program dated 12/21/2020. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922100472062
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration:
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection:


# 922100471972
Unscheduled inspection
Start date: 2021-08-18, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 18.01.2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922100471936
Unscheduled inspection
Start date: 2021-08-18, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 18.01.2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922100436944
Unscheduled inspection
Start date: 2021-08-18, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to implement the inspection program dated 12/13/2020. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922100545724
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection:


# 922100472086
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 922100390543
Unscheduled inspection
Start date: 2021-08-05, end date: —, duration:
Authority:
Purpose of inspection:


# 922100480388
Unscheduled inspection
Start date: 2021-08-25, end date: —, duration:
Authority:
Purpose of inspection:


# 922100486487
Unscheduled inspection
Start date: 2021-08-23, end date: 2021-03-19, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 06/15/2021 Tasks: to assess the compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922100399846
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 922100472013
Unscheduled inspection
Start date: 2021-08-20, end date: —, duration:
Authority:
Purpose of inspection:


# 922100480353
Unscheduled inspection
Start date: 2021-08-20, end date: 2021-03-19, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 11/24/2020. Objectives: to assess the compliance of the activities of the State Committee for Civil Engineering GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922100385312
Unscheduled inspection
Start date: 2021-07-30, end date: —, duration:
Authority:
Purpose of inspection:


# 922100379298
Unscheduled inspection
Start date: 2021-07-28, end date: 2020-02-07, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 03/01/2021. Tasks: assessment of compliance of the activities of the State Committee for Civil Engineering GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation.; Subject: compliance with mandatory requirements


# 922100385292
Unscheduled inspection
Start date: 2021-07-28, end date: 2021-03-19, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to establish the actual condition of the facility, to verify that the work performed and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation; to implement the inspection program dated 05/28/2021. Tasks: to assess the compliance of the activities of the State Committee for Civil Engineering GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3.1, 4 and 6 of Article 52, Article 53 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922100379259
Unscheduled inspection
Start date: 2021-07-28, end date: —, duration:
Authority:
Purpose of inspection:


# 922100300412
Unscheduled inspection
Start date: 2021-07-07, end date: —, duration:
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection:


# 922100357793
Unscheduled inspection
Start date: 2021-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 922100357713
Unscheduled inspection
Start date: 2021-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 922100271428
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-03-17, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 06/03/2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100275410
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-03-17, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program from 30.03.2021; Tasks: assessment of the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100275384
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-03-17, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program from 03.12.2020; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100311006
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated 04/22/2021; objectives: assessment of compliance of the activities of the State Committee for Civil Engineering GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3, 3.1 and 6 of Article 52 of the Urban Planning Code of the Russian Federation.; subject: compliance with mandatory requirements


# 922100311021
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated 04/13/2021; objectives: assessment of compliance of the activities of the State Control Company GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3, 3.1 and 6 of Article 52 of the Urban Planning Code of the Russian Federation.; subject: compliance with mandatory requirements


# 922100316278
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: to carry out an inspection of the completed capital construction facility, based on the received notice of completion of construction, reconstruction of the capital construction facility per. No. 406-04-136 (ex. no. 1664/01-25-1-23/01/21 dated June 22, 2021), as well as letters from GKU EDKS requesting that verification begin on 06/28/2021 (ex. no. 1681/01-25-1-23/01/21 dated June 24, 2021); tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction", during the reconstruction of the facility, with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922100255668
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration:
Authority:
Purpose of inspection:


# 922100298674
Unscheduled inspection
Start date: 2021-06-24, end date: 2021-03-19, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 04/07/2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100193663
Unscheduled inspection
Start date: 2021-05-13, end date: 2021-03-19, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 02/26/2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100191882
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-03-19, duration: 14
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 12/30/2020; Tasks: assessment of the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100183082
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-03-17, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 12/21/2020; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100183112
Unscheduled inspection
Start date: 2021-05-12, end date: 2021-03-17, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 28.01.2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100228935
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated 04/28/2021; objectives: assessment of compliance of the activities of the State Control Company GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3, 3.1 and 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100229131
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: 14
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated 01/13/2021; objectives: assessment of compliance of the activities of the State Control Company GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3, 3.1 and 6 of Article 52 of the Urban Planning Code of the Russian Federation.; subject: compliance with mandatory requirements


# 922100224041
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated January 28, 2021; objectives: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100140517
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-11, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 04/07/2021. Objectives: to assess the compliance of the activities of the GKU GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, parts 2, 3, 3.1 and 6 of Article 52 of the Urban Planning Code of the Russian Federation. Subject: compliance with mandatory requirements


# 922100116408
Unscheduled inspection
Start date: 2021-04-16, end date: 2021-05-07, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 02/26/2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1 and 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100113785
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-05, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 02/05/2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100130547
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-29, duration: 14
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated 03/01/2021; objectives: assessment of compliance of the company's activities with the requirements of Part 2 of Article 51, Parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100123828
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-30, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: to establish the actual condition of the facility, to verify the compliance of the completed works and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation; the implementation of the inspection program dated 07/28/2020; tasks: assessment of compliance of the activities of the State Institution GS EDKS during the construction of the facility with the requirements of part 2 of the article 51, Part 2, Part 3, Part 3.1, Part 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100123053
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-22, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated 03/19/2021; objectives: assessment of compliance with the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100122787
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-27, duration: 13
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated January 14, 2021; objectives: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100130684
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-29, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: to establish the actual condition of the facility, to verify the compliance of the completed works and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation; the implementation of the inspection program dated 12/30/2020; tasks: to assess the compliance of the activities of the GKU GS "EDKS" during the construction of the facility with the requirements of part 2 of the article 51, Part 2, Part 3, Part 3.1, Part 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100170461
Unscheduled inspection
Start date: 2021-04-27, end date: —, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 28.01.2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100176928
Unscheduled inspection
Start date: 2021-04-27, end date: —, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: implementation of the inspection program dated 11/24/2020; objectives: assessment of compliance of the activities of the State Control Company GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51, Part 2, part 3, part 3.1, Part 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100166871
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-18, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 04/15/2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100160161
Unscheduled inspection
Start date: 2021-04-22, end date: 2021-05-14, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 04/14/2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100165354
Unscheduled inspection
Start date: 2021-04-22, end date: 2021-04-30, duration: 7
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program from 03.12.2020; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100038652
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-03-31, duration: 14
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 01/13/2021; Tasks: assessment of the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100074807
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-15, duration: 14
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 03/01/2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100037968
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-17, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives: implementation of the inspection program dated 02.12.2020; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100074833
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-13, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: implementation of the inspection program dated 18.01.2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922100070765
Unscheduled inspection
Start date: 2021-03-22, end date: —, duration:
Authority:
Purpose of inspection:


# 922100056491
Unscheduled inspection
Start date: 2021-03-22, end date: —, duration:
Authority:
Purpose of inspection:


# 922100008045
Unscheduled inspection
Start date: 2021-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 922100023230
Unscheduled inspection
Start date: 2021-02-20, end date: 2021-03-03, duration: 7
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: objectives: to establish the actual condition of the facility, to verify the compliance of the completed works and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation; the implementation of the inspection program dated 12/30/2020; tasks: to assess the compliance of the activities of the GKU GS "EDKS" during the construction of the facility with the requirements of part 2 of the article 51, Part 2, Part 3, Part 3.1, Part 6 of Article 52 of the Urban Planning Code of the Russian Federation; subject: compliance with mandatory requirements


# 922100029218
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 922100022635
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 922100001478
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-03-17, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives: implementation of the inspection program dated 28.01.2021; Tasks: assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation; Subject: compliance with mandatory requirements


# 922105304143
Unscheduled inspection
Start date: 2021-02-02, end date: 2021-02-24, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives: implementation of the inspection program dated 09/14/2020. Tasks: assessment of compliance of the activities of the GKU GS "Unified Directorate of Capital Construction, during the construction of the facility, with the requirements of part 2 of Article 51, parts 3, 6 of Article 52 of the Urban Planning Code of the Russian Federation Subject: compliance with mandatory requirements


# 922105304103
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 922105310219
Unscheduled inspection
Start date: 2021-01-27, end date: 2020-02-07, duration: 15
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives: to implement the inspection program dated 12/01/2020. Tasks: assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction, during the construction of the facility, with the requirements of part 2 of Article 51, parts 3, 6 of Article 52 of the Urban Planning Code of the Russian Federation Subject: compliance with mandatory requirements


# 922105313519
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 922005280883
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-28, duration: 11
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: objectives of the inspection of the completed capital construction facility on the basis of the notice of completion of construction dated 14122020 2800445 bx 324101251230120 dated 14122020 tasks assessment of compliance with the activities of the state-owned institution of the city of Sevastopol "Unified Directorate of Capital Construction during the construction of the facility to the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation subject compliance with mandatory requirements


# 922005280863
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-28, duration: 11
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: objectives of the inspection of the capital construction facility completed on the basis of the received notice of completion of the construction of the reconstruction of the capital construction facility 164040261 dated 14122020 bx 324001251230120 dated 14122020 and a letter on the deadline for the organization of the inspection bx 326401251230120 dated 14122020 tasks assessment of compliance with the activities of the state-owned public institution of the city of Sevastopol "Unified Directorate of Capital Construction during the construction of the facility requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation subject compliance with mandatory requirements


# 922005255891
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-24, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: objectives implementation of the inspection program from 14092020 objectives assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the reconstruction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation subject compliance with mandatory requirements


# 922005264361
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-23, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: objectives implementation of the inspection program from 13032020 objectives assessment of compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the reconstruction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation subject compliance with mandatory requirements


# 922005208616
Unscheduled inspection
Start date: 2020-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 922005227623
Unscheduled inspection
Start date: 2020-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 922005199429
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 922005208662
Unscheduled inspection
Start date: 2020-11-03, end date: 2020-11-10, duration: 5
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: purpose of the inspection of the capital construction facility completed on the basis of the received notice of completion of construction of the reconstruction of the capital construction facility per 148040746 dated 27102020 bx 270801251230120 dated 27102020 tasks assessment of compliance of the activities of the State-owned institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51, parts 3 to 6 of Article 52 of the Urban Planning Code of the Russian Federation subject to compliance with mandatory requirements


# 922005241206
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 922005209648
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-25, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: the purpose of the inspection of the completed capital construction facility on the basis of the notice of completion of construction dated 21102020 145040752 BX 265701251230120 dated 21102020the task is to assess the compliance of the activities of GKU GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation subject to compliance with mandatory requirements


# 922005213594
Unscheduled inspection
Start date: 2020-11-06, end date: 2020-11-12, duration: 5
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: The objectives of the audit program from 1604-2020 are to assess the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the reconstruction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation subject to mandatory requirements


# 922005246614
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 922005246713
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 922005246570
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-11, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: the goal is to fulfill the inspection program from 07042020 tasks assessment of compliance of the activities of the company GKU GS "EDKS" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federationcompliance with mandatory requirements


# 922005217019
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration:
Authority:
Purpose of inspection:


# 922005146495
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-16, duration: 11
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: the purpose of establishing the actual condition of the facility is to ensure that the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation for the implementation of the inspection program from 28072020 tasks to assess the compliance of the activities of the GKU GS "EDKS" during the construction of the facility with the requirements of part 2 of Article 51 Part 3 Part 6 of Article 52 of the Urban Planning Code of the Russian Federation Federationscompliance with mandatory requirements


# 922005195671
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-09, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: the goal is to fulfill the verification program from 14072020 tasks and assess the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the reconstruction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation subject to mandatory requirements


# 922005191872
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration:
Authority:
Purpose of inspection:


# 922004469751
Unscheduled inspection
Start date: 2020-08-04, end date: —, duration:
Authority:
Purpose of inspection:


# 922004510930
Unscheduled inspection
Start date: 2020-08-27, end date: 2020-09-09, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: the goal is to fulfill the inspection program from 13032020 tasks and assess the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the reconstruction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation and the subject of compliance with mandatory requirements


# 922004472500
Unscheduled inspection
Start date: 2020-08-05, end date: 2020-08-25, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The goal is to fulfill the inspection program from 26032020 tasks and assess the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the reconstruction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation subject to mandatory requirements


# 922004478097
Unscheduled inspection
Start date: 2020-08-07, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 922004497738
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-11, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: the purpose of the inspection of the completed capital construction facility on the basis of the notice of completion of construction dated 12082020 123040712 BX 200701251230120 dated 12082020the task is to assess the compliance of the activities of GKU GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation and the subject of compliance with mandatory requirements


# 922004489010
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 922004495908
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-09-04, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the inspection of the completed capital construction facility based on the notice of completion of construction dated 12082020 122040689 cx 200901251230120 dated 12082020 and the letter on the deadline for the organization of the inspection cx 204301251230120 dated 14082020the tasks of the inspection of the completed capital construction facility based on the notice of completion of construction dated 12082020 122040689 cx 200901251230120 dated 12082020 and letters on the deadline for the organization of the verification of VX 204301251230120 from 14082020Present compliance with mandatory requirements


# 922004464088
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 922004458377
Unscheduled inspection
Start date: 2020-07-23, end date: 2020-08-05, duration: 10
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: The objectives of the audit program from 28022020 are to assess the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the reconstruction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation subject to mandatory requirements


# 922004443811
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-08, duration: 5
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of the audit program from 1604-2020 are to assess the compliance of the activities of the State-owned Institution of the city of Sevastopol "Unified Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation subject to mandatory requirements


# 922004444828
Unscheduled inspection
Start date: 2020-07-03, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 922004457046
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-07-31, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: the objectives of the audit program from 12032020 are to assess the compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation subject to compliance with mandatory requirements


# 922004453355
Unscheduled inspection
Start date: 2020-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 922004441663
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 922004460269
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-08-04, duration: 15
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of the construction of the reconstruction of the capital construction facility per 106040686 dated 14072020 bx 168101251230120 dated 14072020 letters from the State Government Institution of Sevastopol "Unified Directorate of Capital Construction" on the inspection of the completed capital construction facility with 15072020 bx 168201251230120 dated 14072020 Tasks assessment of compliance with the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility, the requirements of Part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation are subject to mandatory requirements


# 922004421456
Unscheduled inspection
Start date: 2020-06-02, end date: 2020-06-23, duration:
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives of the audit program from 07042020tags assessment of compliance of the activities of the company GKU GS "EDKS" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federationsubject compliance with mandatory requirements


# 922004422437
Unscheduled inspection
Start date: 2020-06-04, end date: 2020-06-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of checking the compliance of the facade construction work are interior finishing work on the installation of internal and external engineering networks and equipment, commissioning work on landscaping and the implementation of the inspection program from 21052020 Tasks assessment of compliance with the activities of the State Institution GS EDKS during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, subject to compliance with mandatory requirements


# 922004437476
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 922004438464
Unscheduled inspection
Start date: 2020-06-23, end date: 2020-07-07, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection program from 13032020 Tasks assessment of compliance of the activities of the State Committee for Civil Engineering of the EDCS during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation from 29122004 190 FZ Subject of compliance with mandatory requirements


# 922004440952
Unscheduled inspection
Start date: 2020-06-30, end date: —, duration:
Authority:
Purpose of inspection:


# 922004428674
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-06-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives to verify the compliance of the completed works and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the design documentation, the implementation of the inspection program dated 29042020 Tasks assessment of compliance of the activities of the GKU GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation dated 29122004 190FZ Subject Compliance with mandatory requirements


# 922004371872
Unscheduled inspection
Start date: 2020-03-24, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 922004368385
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Targets for the implementation of the inspection program from 12032020 Tasks assessment of compliance of the activities of the GKU GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation from 29122004 190 FZ Subject of compliance with mandatory requirements


# 922004371814
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-04-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection program from 28022020 Tasks assessment of compliance of the activities of the State Committee for Civil Engineering of the EDCS during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation from 29122004 190 FZ Subject of compliance with mandatory requirements


# 922004346001
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-03-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Targets for the implementation of the inspection program from 11022020 Tasks assessment of compliance of the activities of the GKU GS EDKS during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation from 29122004 190 FZ Subject Compliance with mandatory requirements


# 922004358927
Unscheduled inspection
Start date: 2020-03-19, end date: 2020-04-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The purpose of establishing the actual condition of the facility is to ensure that the work performed and the work applied and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, comply with the requirements of the technical regulations of the project documentation for the implementation of the inspection program from 22052019the tasks are to assess the compliance of the activities of the GKU GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code Code of the Russian Federationsubject compliance with mandatory requirements


# 922004363173
Unscheduled inspection
Start date: 2020-03-20, end date: 2020-04-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The purpose of establishing the actual condition of the facility is to ensure that the work performed and the work applied and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, comply with the requirements of the technical regulations of the project documentation for the implementation of the inspection program dated 31012020task assessment of compliance of the activities of the GKU GS "EDKS" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 Urban Planning Code of the Russian Federationsubject compliance with mandatory requirements


# 922004304258
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of verifying the compliance of work on the roof, facade design, interior finishing work, work on the installation of internal and external engineering networks and equipment, landscaping and the implementation of the inspection program from 22012020 Tasks, assessment of compliance with the activities of the GKU GS EDKS during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, Subject to compliance with mandatory requirements


# 922004307513
Unscheduled inspection
Start date: 2020-02-27, end date: —, duration:
Authority:
Purpose of inspection:


# 922004286494
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-02-21, duration:
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: Objectives of the inspection program dated 24092019 Tasks assessment of compliance of the GBU DKS activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation dated 29122004 190 FZ Subject of compliance with mandatory requirements


# 922004441352
Unscheduled inspection
Start date: 2020-02-21, end date: 2020-02-28, duration: 5
Authority: Gosudarstvennaya inspekciya truda goroda Sevastopolya
Purpose of inspection: verification and assessment of compliance with the requirements of labor legislation and other regulatory legal acts containing labor law norms


# 922004206116
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of the audit program dated 10122019 are to assess the compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation and the subject of compliance with mandatory requirements


# 922004220390
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives to ensure that the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, comply with the requirements of the technical regulations of the project documentation, the implementation of the inspection program from 30092019the tasks are to assess the compliance of the GBU DCS activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation from 29122004 190FPREDITS compliance with mandatory requirements


# 921904155619
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of the inspection of the capital construction facility completed on the basis of the notice of completion of construction dated 19122019 300040635 bx 313701251230119 dated 19122019 and the letter of commencement of inspection from 23122019 bx 318501251230119 dated 23122019 as well as compliance with the requirements of the issued regulations on the elimination of violations dated 15102019 9207063504050243295 and 9207063504050143294 dated 10122019 92070635040501477113 and 92070635040502477114 Tasks assessment of compliance with the activities of the State Budgetary Institution "Directorate capital construction during the construction of an object to the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federationinstruction of mandatory requirements


# 921904057239
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 10102019 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation and subject to mandatory requirements


# 921904123120
Unscheduled inspection
Start date: 2019-12-19, end date: 2019-12-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of construction of the reconstruction of the capital construction facility 1320425 dated 10122019 bx 304101251230119 dated 10122019 Tasks assessment of compliance with the activities of the State Budget Institution "Directorate of Capital Construction during the construction of the facility requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Development Code of the Russian Federation and subject to mandatory requirements


# 921903915161
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration:
Authority:
Purpose of inspection:


# 921903973809
Unscheduled inspection
Start date: 2019-11-21, end date: 2019-11-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: To ensure that the completed works and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, comply with the requirements of the project documentation of the Task to assess the compliance of the GBU DCS activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation of 29122004 190 FZ Subject to mandatory requirements


# 921904022065
Unscheduled inspection
Start date: 2019-11-28, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921903947254
Unscheduled inspection
Start date: 2019-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 921903906340
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 10092019 Tasks assessment of compliance of the activities of GBU "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federationsubject compliance with mandatory requirements


# 921903888214
Unscheduled inspection
Start date: 2019-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 921903807166
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 921903849628
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-18, duration:
Authority: Gosudarstvennaya inspekciya truda goroda Sevastopolya
Purpose of inspection: compliance with labor laws


# 921903492556
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 921903639544
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the capital construction facility completed on the basis of the notice of completion of construction dated 13092019 229040635 bx 224801251230119 dated 13092019 Tasks assessment of compliance of the activities of GBU "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921903457541
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the completion notice dated 06092019 220040669 bx 216701251230119 dated 06092019 letter dated 06092019 216801251230119 Tasks assessment of compliance of the developer's activities during the construction of the facility with the requirements of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902945531
Unscheduled inspection
Start date: 2019-08-15, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921902962698
Unscheduled inspection
Start date: 2019-08-16, end date: —, duration:
Authority:
Purpose of inspection:


# 921902979927
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration:
Authority:
Purpose of inspection:


# 921902858099
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-07-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 03072019 Objectives assessment of compliance of the activities of GBU "Directorate of CS" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902794994
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-07-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 22052019 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902858391
Unscheduled inspection
Start date: 2019-07-16, end date: —, duration:
Authority:
Purpose of inspection:


# 921902879558
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-08-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program dated 26022019 Objectives assessment of compliance of the activities of GBU "Directorate of CS" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902824184
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 921902887718
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 921902747213
Unscheduled inspection
Start date: 2019-06-11, end date: —, duration:
Authority:
Purpose of inspection:


# 921902797102
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-07-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 10062019 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902805182
Unscheduled inspection
Start date: 2019-06-21, end date: 2019-07-11, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 04062019 Objectives assessment of compliance of the activities of GBU "Directorate of CS" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902821224
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-07-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The purpose of establishing the actual condition of the facility is to ensure that the work performed and the work applied and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation for the implementation of the inspection program from 14062019 Tasks assessment of compliance of GBU "DKS" activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code The Code of the Russian Federation on the subject of compliance with mandatory requirements


# 921902698593
Unscheduled inspection
Start date: 2019-05-15, end date: 2019-06-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility on the basis of the notice of completion of construction dated 22042019 94040692 bx 86601251230119 dated 22042019 Tasks assessment of compliance with the activities of GBU "Directorate of CS" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902706949
Unscheduled inspection
Start date: 2019-05-07, end date: 2019-05-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility on the basis of the notice of completion of construction dated 07052019 114040692 bx 100301251230119 dated 07052019 Tasks assessment of compliance of the activities of GBU "Directorate of CS" during the construction of the facility with the requirements of part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to mandatory requirements


# 921902642189
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of establishing the actual condition of the facility are to ensure that the work performed and the work applied and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation for the implementation of the inspection program from 19022019 Tasks to assess the compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902639983
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-05-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 05092018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902642154
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program from 04022019 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902642097
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 01042019 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902654097
Unscheduled inspection
Start date: 2019-04-18, end date: —, duration:
Authority:
Purpose of inspection:


# 921902576031
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-04-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program from 06032019 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902584976
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration:
Authority:
Purpose of inspection:


# 921902575934
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-04-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 26022019 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921902499190
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program from 04022019 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921902473741
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of verifying the facts indicated in the collective appeal of citizens KOJI38226p dated 28/122018 and verifying the facts indicated by an official of Sevgosstroynadzor in memo 19801251 320319 dated 25/122019 Tasks assessment of compliance of the developer's activities during the reconstruction of the facility with the requirements of Art 51 52 54 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921902437203
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration:
Authority:
Purpose of inspection:


# 921902528895
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration:
Authority:
Purpose of inspection:


# 921902518395
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration:
Authority:
Purpose of inspection:


# 921902482328
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-02-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 24082018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921902409148
Unscheduled inspection
Start date: 2019-01-14, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921902446382
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 921902449692
Unscheduled inspection
Start date: 2019-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 921902423172
Unscheduled inspection
Start date: 2019-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 921802317638
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 14/12/2018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802315821
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of construction of the reconstruction of the capital construction facility per 312040654 bx 302491 dated 11122018 Tasks assessment of compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802327433
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of a capital construction facility completed on the basis of the received notice of completion of construction reconstruction of the capital construction facility reg 315040592 dated 14122018 ex 302517 dated 14122018 Tasks assessment of compliance of the company's activities during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802327422
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility on the basis of the received notice of completion of construction reconstruction of the capital construction facility reg 316040671 dated 14122018 ex 302516 dated 14122018 Tasks assessment of compliance of the company's activities during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802130993
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 13/12/2018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802412588
Unscheduled inspection
Start date: 2018-12-27, end date: 2019-01-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of construction of the reconstruction of the capital construction facility per 325040665 bx 302615 dated 25122018 Tasks assessment of compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802410563
Unscheduled inspection
Start date: 2018-12-27, end date: 2019-01-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of the construction of the reconstruction of the capital construction facility per 324040658 bx 302617 dated 25122018 letter from GBU "Directorate of CS" on the inspection of the completed capital construction facility from 27122018 bx 302665 dated 26122018 Tasks assessment of compliance with the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility The requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation are subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802410545
Unscheduled inspection
Start date: 2018-12-27, end date: 2019-01-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of the construction of the reconstruction of the capital construction facility per 322040746 vh 302593 dated 21122018 letter from GBU "Directorate of CS" on the inspection of the completed capital construction facility from 27122018 vh 302669 dated 26122018 Tasks assessment of compliance with the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility The requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation are subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802146302
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection program dated 24082018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802423203
Unscheduled inspection
Start date: 2018-12-29, end date: 2019-01-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of the construction of the reconstruction of the capital construction facility reg 329040654 vh 302709 dated 28122018 letter from GBU "Directorate of CS" on the inspection of the completed capital construction facility from 29122018 vh 302711 dated 28122018 Tasks assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802216843
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 04/122018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802212223
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 301/12018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802212032
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 29/12/2018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802127017
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program dated 28042018 Objectives assessment of compliance of the activities of GBU "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements


# 921802127151
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 05092018 Objectives assessment of compliance of the activities of GBU "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921802290831
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of construction of the reconstruction of the capital construction facility per 307040658 bx 302455 dated 06122018 Tasks assessment of compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921802131511
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program dated 15102018 Objectives assessment of compliance of the activities of GBU "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921802130929
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 921802160703
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration:
Authority:
Purpose of inspection:


# 921802064818
Unscheduled inspection
Start date: 2018-11-09, end date: 2018-11-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Target fulfillment of the inspection program dated 15102018 Tasks assessment of compliance of the activities of GBU "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921802027658
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-27, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 27032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921801988963
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of verifying compliance with the requirements of the regulation dated 16082018 92070692040401 02260093 on the elimination of violations during the construction of reconstruction of a capital construction facility The objectives of verifying the cooperative's compliance with the requirements issued by the state construction supervision and expertise authority of the city of Sevastopol, namely the regulation on the elimination of violations during the construction of reconstruction of a capital construction facility dated 16082018 9207069204040102260093 Subject compliance with mandatory requirements and or requirements established by municipal legal acts compliance with regulations state control and supervision bodies


# 921801737911
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 03082018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921801894445
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 07/122017 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921801914907
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921801914686
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921801916217
Unscheduled inspection
Start date: 2018-10-12, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921801913668
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-26, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection program dated 24082018 Objectives assessment of compliance of GBU DKS activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921801740678
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 27032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921801931100
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-11-06, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit of the implementation of the audit program dated 05/10/2018 Tasks assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921801944524
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-11-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program dated 08102018 Tasks of GBU "Directorate of Capital Construction" during the construction of the facility to the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921801935367
Unscheduled inspection
Start date: 2018-10-17, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921801976436
Unscheduled inspection
Start date: 2018-10-19, end date: —, duration:
Authority:
Purpose of inspection:


# 921800899880
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-10-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspections dated 11072018 Tasks assessment of compliance of the activities of GBU "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800751025
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 04072018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800675424
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921801586147
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921801428909
Unscheduled inspection
Start date: 2018-09-20, end date: 2018-10-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit of the implementation of the inspection program dated 05092018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800625028
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-09-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspections dated 06072018 Tasks assessment of compliance of the activities of GBU "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800588772
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 921800662335
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit of the implementation of the audit program dated 28042018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800601875
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-24, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program dated 12012018 Objectives assessment of compliance of the activities of the State Institution "Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800580920
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 27122017 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800606886
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921800582963
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921800663258
Unscheduled inspection
Start date: 2018-08-24, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921800523048
Unscheduled inspection
Start date: 2018-07-17, end date: 2018-07-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 14032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800503980
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-17, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program Objectives assessment of compliance of the activities of the State Budgetary Institution Directorate of Capital Construction during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements


# 921800562400
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration:
Authority:
Purpose of inspection:


# 921800430372
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 27032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800497648
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-18, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The purpose of conducting an inspection of a capital construction facility completed on the basis of the received notice of completion of construction dated 20062018 126040188 bx 301123 dated 20062018 from GBU "DKS" meeting the requirements of the issued regulations on the elimination of violations during the construction of the capital construction facility 9207018804050104030151 dated 29122017 issued to a legal entity from GBU "DKS" and 9207018804050204030152 dated 29122017 issued to an official from GBU "DKS", represented by Director Isaev AA, based on the received notification 125030188 dated 20062018 bx301122 dated 20062018 from GBU "DKS", the tasks are to assess the compliance of GBU "DKS" activities during the construction of the facility with the requirements of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation and verify compliance with the requirements issued by the Department of State Construction Supervision and Expertise of the city of Sevastopol, namely, the instructions on the elimination of violations during the construction of a capital construction facility 9207018804050104030151 dated 29122017 issued to a legal entity from GBU "DKS" and 9207018804050204030152 dated 29122017 issued to an official from GBU "DKS" represented by Director Isaeva AA Subject compliance with mandatory requirements compliance with regulations of state control bodies supervision of municipal control body


# 921800436526
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of verifying compliance with the requirements issued by GBU "Directorate of CS" regulations 9202065304040100840047 dated 09042018 on the elimination of violations during the construction of reconstruction of an investment construction facility based on the expiration of the issued regulation 9202065304040100840047 dated 09042018 Tasks verification of compliance with the requirements issued by the Department of State Construction Supervision and Expertise of the City of Sevastopol regulations on the elimination of violations during the construction of reconstruction of an investment construction facility 9202065304040100840047 dated 09042018 Subject matter regulations of state control bodies, supervision of municipal control bodies


# 921800489675
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-07-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 1705-2018 Tasks assessment of compliance of the activities of the State Institution "Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800354095
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 15032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800378897
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-31, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 14032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800353997
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-25, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 27122017 Tasks assessment of compliance of the activities of the State-Owned Institution "Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800363627
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit of the implementation of the inspection program dated 23042018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800370043
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-06-01, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of the audit program dated 07/122017 are to assess the compliance of the company's activities during the construction of the facility with the requirements of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800364106
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit of the implementation of the audit program dated 28042018 Objectives assessment of compliance of the company's activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800333549
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The purpose of verifying compliance with the requirements of the issued regulations on the elimination of violations during the construction of the capital construction facility 9207063504040100270015 dated 21022018 issued to the legal entity GBU "Directorate of Capital Construction" and 9207063504040200270016 dated 21022018 issued to the official director GBU "Directorate of CS" Isaeva AA on the basis of the received notification 81030635 dated 20042018 bx 30709 dated 20042018 on the elimination of violations during the construction of the reconstruction of the capital construction facility construction Tasks verification of compliance with the requirements issued by the Department of State Construction Supervision and Expertise of the city of Sevastopol, namely regulations on the elimination of violations during the construction of a capital construction facility 9207063504040100270015 dated 21022018 issued to a legal entity GBU "Directorate of Capital Construction" and 9207063504040200270016 dated 21022018 issued to an official director GBU "Directorate of CS" Isaeva AA on the basis of received notification 81030635 dated 20042018 30709 of 20042018 on the elimination of violations during the construction and reconstruction of a capital construction facility Subject to compliance with the instructions of state control bodies supervision of municipal control bodies


# 921800373287
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 11052018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800308861
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-04-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility on the basis of the received notice of completion of the construction of the reconstruction of the capital construction facility reg 77040659 dated 17042018 bx 30655 dated 16042018 letter from GBU "Directorate of CS" on the inspection of the completed capital construction facility from 17042017 bx 30656 dated 16042018 Tasks assessment of compliance with the activities of the State Budgetary Institution "Directorate of Capital Construction" at when building an object, the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation are subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800279060
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of a capital construction facility completed on the basis of the notice of completion of construction of the reconstruction of the capital construction facility bx 30529 dated 30032018 Tasks assessment of compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts acts


# 921800279101
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of a capital construction facility completed on the basis of the notice of completion of construction of the reconstruction of the capital construction facility bx 30530 dated 30032018 Tasks assessment of compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts acts


# 921800279090
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of a capital construction facility completed on the basis of the notice of completion of construction of the reconstruction of the capital construction facility bx 30526 dated 30032018 Tasks assessment of compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts acts


# 921800278695
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility on the basis of the received notice of completion of construction of the reconstruction of the capital construction facility reg 61040648 of 30032018 bx 30528 of 30032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or the requirements established by municipal legal acts


# 921800278604
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of construction of the reconstruction of the capital construction facility reg 66040655 dated 04042018 vx 30557 dated 04042018 Tasks assessment of compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or the requirements established by municipal legal acts


# 921800278636
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility based on the received notice of completion of construction of the reconstruction of the capital construction facility reg 62040652 dated 30032018 vx 30527 dated 30032018 Tasks assessment of compliance of the activities of the State Budget Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or the requirements established by municipal legal acts


# 921800208896
Unscheduled inspection
Start date: 2018-04-13, end date: 2018-04-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of verifying compliance with the requirements of the issued regulations on the elimination of violations during the construction of a capital construction facility 920701880405010403015 dated 29122017 issued to a legal entity of the State Institution "Capital Construction 920701880405020403015 dated 29122017 issued to an official of the Capital Construction Group represented by the head of Isaev Andrey Alexandrovich Tasks verification of compliance with the requirements issued by the Department of State Construction Supervision and Expertise of the city of Sevastopol, namely regulations on the elimination of violations during the construction of a capital construction facility 9207018804050104030151 dated 29122017 issued to a legal entity of the State Institution "Capital Construction" 920701880405020403015 dated 29122017 issued to an official of the State Institution "Capital Construction" represented by the head of Isaev Andre Alexandrovich, the subject is compliance with the instructions of the state control bodies of the municipal control body


# 921800308587
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program dated 12012018 Objectives assessment of compliance of the activities of the State Institution "Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 6 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800257506
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-04, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the capital construction facility completed on the basis of the received notice of completion of construction of the reconstruction of the capital construction facility reg 59040597 dated 29032018 bx 30519 dated 29032018 letter from the State Budgetary Institution "Directorate of CS" on conducting an inspection from 02042018 bx 30520 dated 29032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800194609
Unscheduled inspection
Start date: 2018-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 921800194653
Unscheduled inspection
Start date: 2018-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 921800194637
Unscheduled inspection
Start date: 2018-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 921800194706
Unscheduled inspection
Start date: 2018-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 921800194543
Unscheduled inspection
Start date: 2018-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 921800217495
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the capital construction facility completed on the basis of the received notice of completion of construction of the reconstruction of the capital construction facility per 43040597 dated 15032018 bx 30432 dated 15032018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or the requirements established by municipal legal acts


# 921800213942
Unscheduled inspection
Start date: 2018-03-22, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921800218482
Unscheduled inspection
Start date: 2018-03-27, end date: —, duration:
Authority:
Purpose of inspection:


# 921800235226
Unscheduled inspection
Start date: 2018-03-28, end date: —, duration:
Authority:
Purpose of inspection:


# 921800190181
Unscheduled inspection
Start date: 2018-03-06, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921800054800
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-03-01, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The objectives of the audit program dated 07/122017 are to assess the compliance of the company's activities during the construction of the facility with the requirements of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800082075
Unscheduled inspection
Start date: 2018-02-16, end date: —, duration:
Authority:
Purpose of inspection:


# 921800089180
Unscheduled inspection
Start date: 2018-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 921800104275
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the capital construction facility completed on the basis of the received notice of completion of construction of the reconstruction of the capital construction facility reg 19040597 dated 19022018 bx 30255 dated 19022018 letter from the State Budgetary Institution "Directorate of Capital Construction" bx 30264 dated 20022018 Tasks assessment of compliance of the activities of the State Budgetary Institution "Directorate of Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800096892
Unscheduled inspection
Start date: 2018-02-22, end date: 2018-02-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the capital construction facility completed on the basis of the notice of completion of construction of the reconstruction of the capital construction facility dated 15022018 18020598 bx 30237 dated 15022018 from GBU "DKS" Tasks assessment of compliance of GBU "DKS" activities during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 921800028522
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 921800019209
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-02-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program dated 27/122017 Tasks assessment of compliance of the activities of the State-Owned Institution "Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170803025857
Unscheduled inspection
Start date: 2017-12-27, end date: —, duration:
Authority:
Purpose of inspection:


# 92170803037913
Unscheduled inspection
Start date: 2017-12-26, end date: —, duration:
Authority:
Purpose of inspection:


# 92170803037983
Unscheduled inspection
Start date: 2017-12-26, end date: 2017-12-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the completed capital construction facility on the basis of the received notice of completion of construction of the reconstruction of the capital construction facility reg 289040616 dated 25122017 cx 311330011317 dated 25122017 letter from the State Institution "KS" on the inspection of the completed capital construction facility from 26122017 cx 311830011317 dated 26122017 Tasks assessment of compliance with the activities of the State-Owned Institution "Capital Construction" during the construction of the facility requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation Subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170803024352
Unscheduled inspection
Start date: 2017-12-21, end date: —, duration:
Authority:
Purpose of inspection:


# 92170803021557
Unscheduled inspection
Start date: 2017-12-21, end date: 2017-12-22, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the inspection of the capital construction facility completed on the basis of the received notice of completion of the construction of the reconstruction of the capital construction facility reg 277040197 dated 19122017 bx 309130011317 dated 19122017 letter from the State Institution "Capital Construction" bx 305630011317 dated 19122017the tasks are to assess the compliance of the activities of the State-owned Institution "Capital Construction" during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code the Code of the Russian Federation provides for compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170802963276
Unscheduled inspection
Start date: 2017-12-15, end date: 2017-12-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 02062017 Tasks assessment of compliance of the activities of the State-owned institution "Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170802928810
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 08062017 Tasks assessment of compliance of the activities of the State Institution "Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170802838812
Unscheduled inspection
Start date: 2017-11-14, end date: —, duration:
Authority:
Purpose of inspection:


# 92170802676904
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-16, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program from 02062017the tasks are to assess the compliance of the activities of the State-owned Institution Capital Construction during the construction of the facility with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170802682766
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-08, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives of the audit program from 08062017 Tasks assessment of compliance of the activities of the State-owned institution "Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170802453389
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: Objectives implementation of the inspection program from 08062017 Tasks assessment of compliance of the activities of the State Institution "Capital Construction" during the construction of the facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation, subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170701852097
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 92170701796250
Unscheduled inspection
Start date: 2017-07-18, end date: —, duration:
Authority:
Purpose of inspection:


# 92170701781695
Unscheduled inspection
Start date: 2017-07-18, end date: —, duration:
Authority:
Purpose of inspection:


# 92170701789215
Unscheduled inspection
Start date: 2017-07-14, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 92170701835276
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration:
Authority:
Purpose of inspection:


# 92170701722326
Unscheduled inspection
Start date: 2017-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 92170701588212
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The audit is conducted in order to implement the adjusted inspection program from 30082016the tasks of this audit are to assess the compliance of the activities of the state-owned institution Capital Construction during the construction of the capital construction facility School in Kazachya Bay with the requirements of part 6 of Article 52 of the Urban Planning Code of the Russian Federation. The subject of the audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 92170701527437
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: This audit is conducted in order to verify the completed construction of a capital construction facility on the basis of the completion notice 77040124 dated 06042017 letter of verification from 07042017 bx 921174 dated 06042017the purpose of this audit is to assess the compliance of the activities of the State-owned Institution "Capital Construction" during the construction of the facility "Landfill in Pervomaiskaya Balka Third stage Adjustment" with the requirements of Part 3 Article 52 of the Urban Planning Code of the Russian Federation, the subject of this audit is compliance with mandatory requirements


# 92170701492094
Unscheduled inspection
Start date: 2017-03-29, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 92170701492181
Unscheduled inspection
Start date: 2017-03-29, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 92170701421306
Unscheduled inspection
Start date: 2017-03-06, end date: 2017-03-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: This inspection is carried out in order to verify compliance with the regulations of 23012017 9202018804030200050002 of 23012017 9202018804030100050001 on the elimination of violations of technical regulations and project documentation identified during an unscheduled inspection inspection act 9202018803030100050014 of 23012017the objectives of this inspection are to assess the compliance of the activities of the State-owned Institution "Capital Construction" during the construction of the Khrustaleva Kamyshovoe Highway Transport Interchange facility with the requirements of parts 3.6 of Article 52 of the Urban Planning Code of the Russian Federation, the purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 92170701445878
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-07, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: The purpose of the audit is to implement the audit program from 30082016the tasks of the audit are to assess the compliance of the activities of the State-owned institution Capital construction during the construction of the School in Kazachya Bay facility with the requirements of part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation and the subject of the audit is compliance with mandatory requirements


# 92170701400338
Unscheduled inspection
Start date: 2017-02-22, end date: 2017-03-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: This audit is conducted in order to implement the adjusted inspection program from 07092016the purpose of this audit is to assess the compliance of the activities of the State Institution "Capital Construction" during the construction of the Preschool facility in Kazachya Bay with the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian Federation. The purpose of this audit is to comply with the mandatory requirements established by municipal legal acts


# 92170701300343
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-01-23, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: This inspection is carried out in order to verify compliance with the requirements of 9202vy1642176 1st dated 04072016 9202vy1642 1762d dated 04072016 on the elimination of violations of technical regulations and project documentation identified during an unscheduled inspection inspection act 9202vy16421767 dated 04072016the objectives of this inspection are to assess the compliance of the activities of the State-owned Institution Capital Construction during the construction of the Khrustaleva Kamyshovoe Highway Transportation Interchange facility according to the requirements of Parts 3 to 6 of Article 52 of the Urban Planning Code of the Russian Federation, the purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 92170701305647
Unscheduled inspection
Start date: 2017-01-20, end date: 2017-02-09, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: This inspection is carried out in order to establish the actual condition of the School in Kazachya Bay facility, to study the design and executive documentation, to verify that the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, comply with the requirements of the design documentation, to implement the adjusted inspection program from 30082016the purpose of this inspection is to assess the compliance of the activities of the State Institution "Capital Construction construction" during the construction of the School in Kazachya Bay facility, the requirements of Part 2 of Article 51 of Part 3 of Article 52 of the Urban Planning Code of the Russian FederationThe subject of this audit is compliance with mandatory requirements


# 92160701235413
Unscheduled inspection
Start date: 2016-12-14, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 92160701195864
Unscheduled inspection
Start date: 2016-12-06, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection:


# 92160701278111
Unscheduled inspection
Start date: 2016-12-29, end date: 2016-12-30, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora i ekspertizy goroda Sevastopolya
Purpose of inspection: This inspection is carried out in order to verify compliance with the requirements of regulations dated 16112016 9202py28313111yu and 9202PY28313112D on the elimination of violations during the construction of the reconstruction of the capital construction facility "Preschool in Kazachya Bay"The purpose of this inspection is to verify compliance with the GKU "Capital Construction" requirements issued by the state construction supervision and expertise authority of the city of Sevastopol, namely regulations on the elimination of violations during during the construction and reconstruction of the capital construction facility dated 16112016 9202py28313113 and 9202PY28313114THE subject of this inspection is compliance with mandatory requirements or requirements established by municipal legal acts


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.