# 742004425939
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004425934
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-07-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903987422
Unscheduled inspection
Start date: 2019-11-21, end date: 2019-11-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of excavation works on trench construction installation of an underground gas pipeline electrochemical protection of a gas pipeline reclamation and construction materials used during construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Implementation requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903841827
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741903731566
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance of the works on the installation of the collector from the Arts Square to the Igumenka collector with the removal of the Igumenka collector and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902972916
Unscheduled inspection
Start date: 2019-08-29, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902973047
Unscheduled inspection
Start date: 2019-08-29, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902900718
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the preparation of the construction site with excavation work on the construction of a trench installation of an underground gas pipeline and the construction materials used during the construction of a capital construction facility as well as the results of such work with project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802713482
Unscheduled inspection
Start date: 2017-10-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802582804
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the preparation of the construction site of earthworks for the construction of a trench, the device for crossing a highway, the installation of an underground gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701883265
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-08-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the preparation of the construction site excavation work on the construction of a trench the device of crossing the highway the installation of an underground gas pipeline and the construction materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701787619
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the preparation of the construction site of the trench device from PC 0 to PC 5 installation of an underground gas pipeline from PC 0 to PC 5 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701159006
Unscheduled inspection
Start date: 2016-11-29, end date: 2016-12-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the development of soil, the installation of a trench, the installation of a sandy trench base, the laying of a polyethylene gas pipeline into a trench, the laying of a signal tape, the filling of the gas pipeline with pitch, the backfilling of the trench, the installation of polyethylene steel bends, the installation of the ground part of the steel gas pipeline, the installation of shut-off valves, the installation of picket signs, the anti-corrosion protection of the steel gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such works according to the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700958647
Unscheduled inspection
Start date: 2016-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700862750
Unscheduled inspection
Start date: 2016-09-30, end date: —, duration: —
Authority: —
Purpose of inspection: