Found 100 inspections:

# 002100389190
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: 1
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: verification of the execution of Regulation No. 136 dated June 25, 2021 according to Notice No. 1 on the elimination of violations dated 07/08/2021.


# 002100320343
Unscheduled inspection
Start date: 2021-06-25, end date: —, duration: 2
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: assessment of compliance of the performed works and the applied building materials, as well as the results of such work with the requirements of the project documentation, prevention, detection and suppression of violations of the legislation on urban planning and project documentation committed by the developer, the customer, as well as the person carrying out the construction, compliance with mandatory requirements


# 002100001398
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-19, duration: 5
Authority: Inspekciya regionalnogo stroitelnogo nadzora i kontrolya v oblasti dolevogo stroitelstva Primorskogo kraya
Purpose of inspection: verification of the execution of the order previously issued by Stroytransgaz JSC dated 30.09.2020 No. 01/118/20 (deadline for execution of the order is 12.28.2020), based on the petition of Stroytransgaz JSC (vh No. 52-589 dated 02/03/2021)


# 002100001259
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-19, duration: 5
Authority: Inspekciya regionalnogo stroitelnogo nadzora i kontrolya v oblasti dolevogo stroitelstva Primorskogo kraya
Purpose of inspection: verification of the execution of the order previously issued by Stroytransgaz JSC dated 30.09.2020 No. 01/124/20 (the deadline for the execution of the order is 12.28.2020), based on the petition of Stroytransgaz JSC (vh No. 52-590 dated 02/03/2021)


# 002005296447
Unscheduled inspection
Start date: 2020-12-29, end date: 2020-12-30, duration: 2
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulations dated September 7, 2020 235G3320A132 dated November 7, 2020 312G3320A132THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to involve responsibility of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The purpose of the audit is to comply with the instructions of the state control authority.


# 002005296429
Unscheduled inspection
Start date: 2020-12-29, end date: —, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005254369
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-04, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 002005297333
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-11, duration: 10
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: unscheduled inspection by prescription


# 002005297332
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-11, duration: 10
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: unscheduled inspection by prescription


# 002005297322
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-11, duration: 10
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: unscheduled inspection by prescription


# 422005150589
Unscheduled inspection
Start date: 2020-09-30, end date: 2020-10-06, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work with the requirements of the project documentation Tasks verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban development during the construction of a capital construction facility Subject verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban development


# 422005150176
Unscheduled inspection
Start date: 2020-09-30, end date: 2020-10-06, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the construction materials used in the course of work with the requirements of project documentation The purpose of this check is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility Subject to Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning activities


# 002004483035
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-08-07, duration: 2
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the fulfillment of the requirements of the previously issued regulation on the elimination of violations during the construction reconstruction of capital construction facilities


# 002004388114
Unscheduled inspection
Start date: 2020-03-06, end date: 2020-03-19, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring compliance with the instructions of the West Ural Rostechnadzor Department the purpose of this audit is to prevent identify and suppress violations of urban planning legislation committed by a person carrying out construction on the basis of a contract with a developer or technical customer, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts, compliance with the information contained in the notification of at the beginning of certain types of entrepreneurial activity, the information contained in the application and documents of a legal entity or individual entrepreneur on granting the legal status of a special permit license for the right to carry out certain types of activities or approval for other legally significant actions must comply with the mandatory requirements if an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license permits coordination of mandatory requirements as well as data on the specified legal entities and individual entrepreneurs contained in the unified State register of legal entities the unified State register of individual entrepreneurs and other federal information resources


# 002004298883
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-04, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated November 27, 2019 707G3320A132THE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. The purpose of the audit is to comply with the instructions of the state control and supervision body.


# 002004298797
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-04, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated November 27, 2019 705G3320A131THE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. The purpose of the audit is to comply with the instructions of the state control and supervision body.


# 002004357172
Unscheduled inspection
Start date: 2020-02-19, end date: —, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903932128
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-11-29, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulations of August 30, 2019 572G3320A133 of August 23, 2019 549G3320A133THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to involve responsibility of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The purpose of the audit is to comply with the instructions of the state control and supervision body


# 001903925797
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-11-29, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulations dated August 23, 2019 547G3320A132 dated August 30, 2019 571G3320A132THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to involve the responsibility of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts is subject to verification of compliance with the instructions of the state control and supervision body


# 001903921531
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-11-29, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulations dated August 23, 2019 545G3320A131 dated August 30, 2019 570G3320A131THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to involve responsibility of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The purpose of the audit is to comply with the instructions of the state control and supervision body


# 001903892566
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 001902944503
Unscheduled inspection
Start date: 2019-08-27, end date: 2019-08-30, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulations dated May 23, 2019 333G3320A133 dated May 23, 2019 344G3320A133THE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to involve responsibility of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The purpose of the audit is to comply with the instructions of the state control authority.


# 001902944035
Unscheduled inspection
Start date: 2019-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 001902677512
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is conducted in order to monitor the implementation of the regulations dated February 07, 2019 73G3320A133 dated February 07, 2019 77G3320A133 The objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development during the construction of reconstruction of a capital construction facility and to take measures to eliminate violations of mandatory requirements in the event of identification and prosecution of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts 7 The subject of verification is compliance with the instructions of the state control and supervision body


# 001902677511
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is conducted in order to monitor the implementation of the regulations dated February 07, 2019 67G3320A132 dated February 07, 2019 72G3320A132 The objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development during the construction of reconstruction of a capital construction facility and to take measures to eliminate violations of mandatory requirements in the event of identification and prosecution of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts 7 The subject of verification is compliance with the instructions of the state control and supervision body


# 001902677509
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001802074460
Unscheduled inspection
Start date: 2018-11-16, end date: 2018-11-22, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 15082018 g 622G3320A132


# 001800611111
Unscheduled inspection
Start date: 2018-08-24, end date: 2018-08-28, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 21052018 356G3327A133


# 001800499086
Unscheduled inspection
Start date: 2018-07-16, end date: —, duration:
Authority:
Purpose of inspection:


# 001800520462
Unscheduled inspection
Start date: 2018-07-11, end date: 2018-07-17, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 10052018 308G3327A13


# 00170803017062
Unscheduled inspection
Start date: 2017-12-21, end date: —, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170801968805
Unscheduled inspection
Start date: 2017-09-13, end date: 2017-09-21, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 26072017 387G3327vnpp


# 00160601766332
Unscheduled inspection
Start date: 2016-08-31, end date: 2016-09-27, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Privolzhskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: control of the execution of the prescription


# 00160601636774
Unscheduled inspection
Start date: 2016-05-31, end date: 2016-06-28, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Privolzhskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Receipt of information about violations of transport legislation Letter from the Federal Security Service of the Samara Region


# 772101502106
Unscheduled inspection
Start date: 2021-12-29, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations (Notification of elimination of violations No. P001-6263565598-52898425 dated 09-12-2021 in the framework of Regulation No. 09-27-108300-05-04 dated November 08, 2021 with a deadline of 24.01.2022)


# 342101492456
Unscheduled inspection
Start date: 2021-12-23, end date: —, duration:
Authority:
Purpose of inspection:


# 342101492076
Unscheduled inspection
Start date: 2021-12-23, end date: —, duration:
Authority:
Purpose of inspection:


# 422101364727
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 772100894212
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration:
Authority:
Purpose of inspection:


# 422101186442
Unscheduled inspection
Start date: 2021-10-12, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Verification of the compliance of the work performed and the construction materials and products used during the execution of the work with the requirements of the project documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Civil Code of the Russian Federation, are part of such project documentation). The objective of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 772101247823
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 342100885206
Unscheduled inspection
Start date: 2021-09-23, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose: this inspection is carried out in accordance with the inspection program received by a representative of the developer MCU Service of a single customer-developer administration of Volgograd in order to assess the compliance of activities carried out at the facility with the requirements of urban planning legislation of the Russian Federation, including technical regulations and project documentation; The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the construction materials and products used during the construction and reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Code); b) building permit requirements; c) the requirements established by parts 2 and 3.1 of Article 52 of the Code; d) the requirements established by part 4 of Article 52 of the Code to ensure the conservation of the capital construction facility; e) requirements for the procedure for carrying out construction control established by the Code and other regulatory legal acts.


# 342100886573
Unscheduled inspection
Start date: 2021-09-23, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose: this inspection is carried out in accordance with the inspection program received by a representative of the developer MCU Service of a single customer-developer Administration of Volgograd in order to assess the compliance of activities carried out at the facility with the requirements of urban planning legislation of the Russian Federation The purpose of this inspection is to prevent, identify and suppress violations of the legislation of the Russian Federation, including the subject of this inspection is compliance with mandatory requirements regarding: a) the conformity of the work performed and the construction materials and products used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (including as amended, included in the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code); b) building permit requirements; c) the requirements established by parts 2 and 3.1 of Article 52 of the Code; d) the requirements established by part 4 of Article 52 of the Code to ensure the conservation of the capital construction facility; e) requirements for the procedure for carrying out construction control established by the Code and other regulatory legal acts.


# 422100776926
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials and products used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 392100916680
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration: 20
Authority: Ministerstvo regionalnogo kontrolya (nadzora) Kaliningradskoi oblasti
Purpose of inspection: - this inspection is carried out in order to: carry out measures in accordance with Regulation No. 19-CH-2/126 dated 04/15/2021 on the elimination of violations during the construction of a capital construction facility: the objectives of this inspection are: to comply with the instructions of state control (supervision) bodies, municipal control bodies


# 772100350567
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration: 7
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations within the framework of regulation No. 10-21-017400-05-08 dated 05/14/2021 with a deadline until 07/14/2021, assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction facility "Reconstruction of the Zhukovsky highway, Tupolev Street", located at: Russian Federation, Moscow region, Zhukovsky, Tupolev Street


# 422100343891
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives: to verify the compliance of the work performed and the construction materials used in the production process with the requirements of the project documentation. Tasks: verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban development.


# 422100338332
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 422100338311
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 622100408037
Unscheduled inspection
Start date: 2021-07-29, end date: —, duration: 1
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: assessment of compliance of the completed facility with the requirements of the project documentation


# 622100395206
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration: 2
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: execution of regulation No. MP-11 dated 05/27/2021 on the elimination of violations


# 422100337908
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the production process. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning during the construction of the facility. The subject is compliance with the requirements of the legislation of the Russian Federation in the field of urban planning


# 002100389190
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: 1
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: verification of the execution of Regulation No. 136 dated June 25, 2021 according to Notice No. 1 on the elimination of violations dated 07/08/2021.


# 342100383262
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, project documentation. The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance: 1) compliance of the work performed and the construction materials and products used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter – GsK RF) (including taking into account the changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK of the Russian Federation, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK of the Russian Federation); 2) requirements for a construction permit; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by Part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements for the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 632100306207
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 10
Authority: Sredne-Povolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this review is: Compliance with the requirements of the previously issued regulation No. 08-977-01-21-003 dated January 18, 2021 on the elimination of violations during construction, reconstruction, and capital construction facilities.


# 632100306186
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 10
Authority: Sredne-Povolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this review is: Compliance with the requirements of the previously issued regulation No. 08-977-07-20-305 dated 07/31/2020 on the elimination of violations during construction, reconstruction, and capital construction facilities.


# 632100306173
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 10
Authority: Sredne-Povolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this review is: Compliance with the requirements of the previously issued regulation No. 07-977-04-20-175 dated 04/10/2020 on the elimination of violations during construction, reconstruction, and capital construction facilities.


# 632100306145
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 10
Authority: Sredne-Povolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this review is: Compliance with the requirements of the previously issued regulation No. 07-977-12-19-589 dated December 27, 2019 on the elimination of violations during construction, reconstruction, and capital construction facilities.


# 632100306001
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 10
Authority: Sredne-Povolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this review is: Compliance with the requirements of the previously issued Regulation No. 07-726-07-17-208/1 dated 27.07.2017 on the elimination of violations during construction, reconstruction, and capital construction facilities.


# 632100306005
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 10
Authority: Sredne-Povolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this review is: Compliance with the requirements of the previously issued regulation No. 07-726-07-19-280 dated 17.07.2019 on the elimination of violations during construction, reconstruction, and capital construction facilities.


# 342100271750
Unscheduled inspection
Start date: 2021-06-10, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation. The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 002100320343
Unscheduled inspection
Start date: 2021-06-25, end date: —, duration: 2
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Ivanovskoi oblasti
Purpose of inspection: assessment of compliance of the performed works and the applied building materials, as well as the results of such work with the requirements of the project documentation, prevention, detection and suppression of violations of the legislation on urban planning and project documentation committed by the developer, the customer, as well as the person carrying out the construction, compliance with mandatory requirements


# 632100313027
Unscheduled inspection
Start date: 2021-06-25, end date: —, duration:
Authority:
Purpose of inspection:


# 422100220605
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the project documentation. Task: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning.


# 422100197257
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the production process. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning during the construction of the facility. The subject is compliance with the requirements of the legislation of the Russian Federation in the field of urban planning


# 422100214951
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 422100197242
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the production process. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning during the construction of the facility. The subject is compliance with the requirements of the legislation of the Russian Federation in the field of urban planning


# 772100213259
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: that this inspection is conducted in order to monitor compliance with the working conditions of foreign citizens involved in the implementation of major investment projects, taking into account the restrictive measures taken during the spread of coronavirus infection, based on Order No. 131 of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 04/02/2021 "On inspections of working conditions of foreign citizens Federal Service for Supervision of Consumer Rights Protection and Human Welfare No. 147 dated 04/06/2021 "On Amendments to Rospotrebnadzor Order No. 131 dated 04/02/2021 "On Inspections of Working Conditions of Foreign Citizens Involved in the implementation of major Investment Projects", issued in order to implement paragraph 5.2 Minutes of the operational meeting of the Security Council of the Russian Federation dated 02/23/2021, approved by the President of the Russian Federation V.V.Putin on 03/05/2021 No. Pr-356. The objectives of this audit are: monitoring compliance with mandatory requirements in the field of sanitary and epidemiological human well-being. The subject of this audit is: compliance with mandatory requirements, holding events: to prevent harm to the life and health of citizens


# 622100198761
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 12
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: assessment of compliance of the completed works with the requirements of the project documentation


# 422100236496
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives: to verify the compliance of the work performed and the construction materials used in the production process with the requirements of the project documentation. Tasks: verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban development.


# 342100218528
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation. The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; b) availability of a construction permit; c) fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 592100239809
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: 5
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the regulations of the state control (supervision) bodies, the task of the audit is to assess the completeness of the elimination of previously identified violations in accordance with these regulations.


# 422100128348
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-04-21, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the production process. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning during the construction of the facility. The subject is compliance with the requirements of the legislation of the Russian Federation in the field of urban planning


# 422100143642
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-04-21, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 422100128412
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-16, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the production process. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning during the construction of the facility. The subject is compliance with the requirements of the legislation of the Russian Federation in the field of urban planning


# 772100189974
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: The inspection is carried out with the aim of: protecting the rights and interests of employees, in connection with the receipt by the Inspectorate of the appeal dated 03/24/2021 № 77/7-9431-21- ABOUT non-payment of wages and non-payment of all amounts due upon dismissal. The objectives of the audit are: supervision and control over compliance with legislation and other regulatory legal acts containing labor law norms. The subject of this audit is: - compliance with mandatory requirements and (or) requirements established by municipal legal acts; - compliance of the information contained in the notification of the commencement of certain types of business activities with the mandatory requirements; - matching information. information contained in the application and documents of a legal entity or individual entrepreneur for granting legal status, special permission (license), granting permission (approval) to mandatory requirements, as well as information about these legal entities and individual entrepreneurs contained in the unified state register of individual Entrepreneurs and other federal information resources; - compliance with the instructions of state control bodies (supervision), municipal control bodies; - carrying out measures; - to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, documents of special importance historical, scientific, and cultural significance, which are part of the national library fund; - to prevent the occurrence of natural and man-made emergencies; - to ensure the security of the state; - to eliminate the consequences of causing such harm.


# 772100189994
Unscheduled inspection
Start date: 2021-04-29, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: The audit is carried out in order to: protect the rights and interests of employees on the basis of Order No. 73 of the Head of the Federal Service for Labor and Employment dated 04/02/2021, pursuant to paragraph 5.2 of the Protocol of the operational meeting of the Security Council of the Russian Federation No. Pr-356, approved by President Vladimir Putin on February 23, 2021. The tasks of the audit are: supervision and control over compliance with legislation and other regulatory legal acts containing labor law norms. The subject of this audit is: - compliance with mandatory requirements and (or) requirements established by municipal legal acts; - compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements; - matching information. contained in the application and documents of a legal entity or individual entrepreneur for granting legal status, special permission (license), issuance of permission (approval) to mandatory requirements, as well as data on these legal entities and individual entrepreneurs contained in the unified state register of individual entrepreneurs and other federal information resources; - compliance with the instructions of state control bodies (supervision), municipal control bodies; - carrying out measures; - to prevent harm to the life, health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, documents having special significance historical significance, scientific, cultural significance, which are part of the national library fund; - to prevent the occurrence of natural and man-made emergencies; - to ensure the security of the state; - to eliminate the consequences of causing such harm.


# 592100292306
Unscheduled inspection
Start date: 2021-04-26, end date: —, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this inspection is to monitor compliance with the regulations of the West Ural Rostechnadzor Department . The purpose of this inspection is to prevent, identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the person carrying out construction on the basis of a contract with a developer or technical customer.. The subject of this audit is: compliance with mandatory requirements and (or) requirements established by municipal legal acts; compliance of information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements; compliance of information contained in the application and documents of a legal entity or individual entrepreneur on granting legal status, special permission (license) for the right to carry out certain types of activities or permits (approvals) for other legally significant actions, if an appropriate unscheduled audit of a legal entity or individual entrepreneur is provided for in the rules for granting legal status, special permits (licenses), and permits (approvals) to mandatory requirements, as well as data on the specified legal entities and individual entrepreneurs contained in the the Unified State Register of Legal Entities, the Unified State Register of Individual Entrepreneurs, and other federal information resources.


# 422100055070
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-19, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 422100055077
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-19, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 632100067512
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-16, duration: 2
Authority: Sredne-Povolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out for the purpose of: monitoring compliance with the requirements of the previously issued Regulation No. 08-977-11-20-527 dated 11/25/2020 on the elimination of violations during construction, reconstruction, and capital construction facilities, the deadline for which expired on 02/25/2021.


# 422100092245
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-06, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives: to verify the compliance of the work performed and the construction materials used in the production process with the requirements of the project documentation. Tasks: verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban development.


# 772100089353
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-02, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the information provided in the notice of elimination of violations of the requirements of technical regulations and project documentation No. P001-3045060059-43718201 19.03.2021


# 922100033967
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-09, duration: 5
Authority: UPRAVLENIE GOSUDARSTVENNOGO STROITELNOGO NADZORA I EKSPERTIZY GORODA SEVASTOPOLYA
Purpose of inspection: objectives: verification of compliance with the requirements of the regulation on the elimination of violations during construction, reconstruction of the capital construction facility No. 92-02-1053-040601-332-23 dated 11/06/2020; objectives: verification of compliance with the requirements issued by the state construction supervision and expertise authority of the city of Sevastopol: regulations on the elimination of violations during construction, reconstruction of the capital construction facility 92-02-1053-040601-332-22 dated 11/06/2020; subject matter: compliance with the regulations of the state control (supervision) bodies


# 342100002968
Unscheduled inspection
Start date: 2021-02-11, end date: 2021-02-19, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation. The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100002896
Unscheduled inspection
Start date: 2021-02-11, end date: 2021-02-19, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation. The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 422100013376
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-02-20, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives: to verify the compliance of the work performed and the construction materials used in the production process with the requirements of the project documentation. Tasks: verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: verification of compliance with the requirements of the legislation of the Russian Federation in the field of urban development.


# 422100027442
Unscheduled inspection
Start date: 2021-02-26, end date: 2021-03-04, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: To verify the compliance of the work performed and the construction materials used in the course of work with the requirements of the project documentation. The purpose of this audit is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility. Subject: Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 002100001398
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-19, duration: 5
Authority: Inspekciya regionalnogo stroitelnogo nadzora i kontrolya v oblasti dolevogo stroitelstva Primorskogo kraya
Purpose of inspection: verification of the execution of the order previously issued by Stroytransgaz JSC dated 30.09.2020 No. 01/118/20 (deadline for execution of the order is 12.28.2020), based on the petition of Stroytransgaz JSC (vh No. 52-589 dated 02/03/2021)


# 002100001259
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-19, duration: 5
Authority: Inspekciya regionalnogo stroitelnogo nadzora i kontrolya v oblasti dolevogo stroitelstva Primorskogo kraya
Purpose of inspection: verification of the execution of the order previously issued by Stroytransgaz JSC dated 30.09.2020 No. 01/124/20 (the deadline for the execution of the order is 12.28.2020), based on the petition of Stroytransgaz JSC (vh No. 52-590 dated 02/03/2021)


# 002100001468
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-19, duration: 5
Authority: Inspekciya regionalnogo stroitelnogo nadzora i kontrolya v oblasti dolevogo stroitelstva Primorskogo kraya
Purpose of inspection: verification of the execution of the order previously issued by Stroytransgaz JSC dated 30.09.2020 No. 01/122/20 (deadline for execution of the order is 28.12.2020), based on the petition of Stroytransgaz JSC (vh No. 52-588 dated 02/03/2021)


# 422105341730
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772100136463
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 342105315360
Unscheduled inspection
Start date: 2021-01-15, end date: 2021-01-15, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources and design documentation. The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 922105320786
Unscheduled inspection
Start date: 2021-01-27, end date: —, duration:
Authority:
Purpose of inspection:


# 422005257223
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-18, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to check the compliance of the work performed and the construction materials used in the course of work The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of the object The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning


# 422005268254
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-21, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the construction materials used in the course of work with the requirements of project documentation The purpose of this check is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility Subject to Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning activities


# 422005268221
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-21, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the construction materials used in the course of work with the requirements of project documentation The purpose of this check is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility Subject to Compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning activities


# 422005282780
Unscheduled inspection
Start date: 2020-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 502005285030
Unscheduled inspection
Start date: 2020-12-23, end date: 2021-01-22, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Conducting an inspection based on the notice of completion of construction P001035101365741510147 dated 17122020 assessing the compliance of the work performed with the requirements of the design documentation for the capital construction facility "Construction of an entrance to a waste management facility in the Yegoryevsky urban district of the Moscow region" at the address Russian Federation Moscow region Yegoryevsky


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.