Found 59 inspections:

# 001903497007
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To monitor the execution of violations specified in the instruction of the Siberian Directorate of Rostechnadzor dated 301/12018 g 2501277 on the elimination of identified offenses, the deadline for which has expired, Prevention detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation, Compliance with the instructions of the federal state construction supervision authorities


# 001902991846
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the elimination of violations set out in the regulation dated 17062019 P011106667, the deadline for which has expired, and paragraph 28 of Regulation P011106297 dated 25032019. The subject of this inspection is the implementation of Taldinskoye Yuzhnoye Mine Management JSC, paragraph 28 of Regulation dated 25032019 P011106297 and regulation dated 17062019 P011106667 issued following an inspection conducted on the basis of an order from the Siberian Directorate of Rostechnadzor dated 05/29/2019 011106667


# 001902758587
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-17, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the elimination of violations set out in the regulation dated 25032019 P011106297, except for paragraph 28, the deadline for which has expired. The subject of this audit is the fulfillment by Taldinskoye Yuzhnoye Mine Management JSC of the regulation dated 25032019 P011106297 issued following an audit conducted on the basis of the order of the Siberian Directorate of Rostechnadzor dated 05032019 011106297


# 001902528790
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-02-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the previously issued regulation 1408PpcTSE159 dated 13112018. the deadline for eliminating the identified violations has expired on 13022019. The purpose of this audit is to assess the completeness and quality of measures to eliminate violations of mandatory requirements. The subject of this audit is to comply with the instructions of the state control and supervision authority


# 001802030496
Unscheduled inspection
Start date: 2018-11-06, end date: —, duration:
Authority:
Purpose of inspection:


# 001802217826
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001802030494
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001801696396
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802920620
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802920566
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of identified violations specified in the regulation on the elimination of violations Compliance by the audited entity with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802920532
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802920153
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of identified violations specified in the regulation on the elimination of violations Compliance by the audited entity with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802920207
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of the identified violations specified in the regulation on the elimination of violations Compliance by the audited person with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802920119
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of identified violations specified in the regulation on the elimination of violations Compliance by the audited entity with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 422100171717
Unscheduled inspection
Start date: 2021-04-26, end date: —, duration: 18
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Ensuring the observance and protection of the labor rights and freedoms of citizens, including the right to safe working conditions


# 421903866601
Unscheduled inspection
Start date: 2019-10-10, end date: 2019-10-18, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Appeal 427449019OB dated 04102019


# 001903497422
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution of violations specified in the order of the Siberian Rostechnadzor Administration dated 15022019 2501031 on the elimination of identified offenses, the deadline for which has expired, Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation, Compliance with the instructions of the federal state construction supervision authorities


# 001903497209
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution of violations specified in the order of the Siberian Directorate of Rostechnadzor dated 15032019 2501058 on the elimination of identified offenses, the deadline for which has expired, Prevention detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation, Compliance with the instructions of the federal state construction supervision authorities


# 001903497007
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To monitor the execution of violations specified in the instruction of the Siberian Directorate of Rostechnadzor dated 301/12018 g 2501277 on the elimination of identified offenses, the deadline for which has expired, Prevention detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation, Compliance with the instructions of the federal state construction supervision authorities


# 421903433422
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421902949495
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-09-05, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: supervision of compliance with labor legislation


# 421903626716
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration:
Authority:
Purpose of inspection:


# 001902991846
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the elimination of violations set out in the regulation dated 17062019 P011106667, the deadline for which has expired, and paragraph 28 of Regulation P011106297 dated 25032019. The subject of this inspection is the implementation of Taldinskoye Yuzhnoye Mine Management JSC, paragraph 28 of Regulation dated 25032019 P011106297 and regulation dated 17062019 P011106667 issued following an inspection conducted on the basis of an order from the Siberian Directorate of Rostechnadzor dated 05/29/2019 011106667


# 421902874948
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-08-08, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: the purpose is to verify the fulfillment by a legal entity of a previously issued instruction by the territorial department of the Department of Rospotrebnadzor for the Kemerovo region in the city of Kiselevsk, the city of Prokopyevsk and the Prokopyevsky district on the elimination of violations of sanitary and epidemiological legislation 31 dated 28022018 tasks prevention detection suppression of violations of current sanitary legislation subject to compliance with the instructions of state control and supervision bodies


# 001902758587
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-17, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the elimination of violations set out in the regulation dated 25032019 P011106297, except for paragraph 28, the deadline for which has expired. The subject of this audit is the fulfillment by Taldinskoye Yuzhnoye Mine Management JSC of the regulation dated 25032019 P011106297 issued following an audit conducted on the basis of the order of the Siberian Directorate of Rostechnadzor dated 05032019 011106297


# 421902773101
Unscheduled inspection
Start date: 2019-06-07, end date: 2019-06-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 001902540106
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of violations specified in the instruction of the Siberian Directorate of Rostechnadzor dated 16112018 g 2501254 on the elimination of identified offenses, the deadline for which has expired, Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation, Compliance with the instructions of the federal state construction supervision authorities


# 421902521898
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-03-19, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: the purpose is to verify the fulfillment by a legal entity of a previously issued instruction by the territorial department of the Rospotrebnadzor for the Kemerovo region in the city of Kiselevsk, the city of Prokopyevsk and the Prokopyevsky district on the elimination of violations of sanitary and epidemiological legislation 31 dated 28022018 tasks prevention detection suppression of violations of current sanitary legislation prevention detection suppression of violations of current sanitary legislation taking measures to eliminate identified violations subject to compliance with the instructions of state control and supervision authorities


# 421902462806
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-28, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kemerovskoi oblasti
Purpose of inspection: expiration of the deadline for the execution of a previously issued order to eliminate the identified violation


# 001902528790
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-02-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the previously issued regulation 1408PpcTSE159 dated 13112018. the deadline for eliminating the identified violations has expired on 13022019. The purpose of this audit is to assess the completeness and quality of measures to eliminate violations of mandatory requirements. The subject of this audit is to comply with the instructions of the state control and supervision authority


# 001902471464
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the inspection program approved by Deputy Head of the Siberian Department of Rostechnadzor Vygolov LP dated 14092017 g 4202617 Prevention detection and suppression of violations of legislation on urban development activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of a capital construction facility "Development of reserves of the Taldinsky coal deposit within the license boundaries of Taldinskoye Yuzhnoye CJSC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001802030496
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-16, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of the instruction of the Siberian Directorate of Rostechnadzor dated 24082018 2501173 on the elimination of identified offenses, the deadline for which has expired, Prevention detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation, Compliance with the instructions of the federal state construction supervision authorities


# 001802217826
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Vygolov LP dated 14092017 g 4202617 Prevention detection and suppression of violations of legislation on urban development activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of a capital construction facility "Development of reserves of the Taldinsky coal deposit within the license boundaries of Taldinskoye Yuzhnoye CJSC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001802030494
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Vygolov LP dated 14092017 g 4202617 Prevention detection and suppression of violations of legislation on urban development activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of a capital construction facility "Development of reserves of the Taldinsky coal deposit within the license boundaries of Taldinskoye Yuzhnoye CJSC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 421801756699
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-26, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kemerovskoi oblasti
Purpose of inspection: expiration of the deadline for the execution of a previously issued order to eliminate the identified violation


# 001801696396
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-12, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment by Taldinskoye Yuzhnoye Mine Management JSC of the requirements of the previously issued regulation on the elimination of violations dated 27102017 252704, the deadline for which has expired Verification of the elimination by a legal entity of the violations identified in the regulation on the elimination of violations dated 27102017 252704, the deadline for which has expired The fulfillment by the audited entity of the regulation dated 27102017 252704 of the Siberian Directorate of Rostechnadzor


# 001800615190
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-24, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility based on the inspection program dated 14092017 4202617 Prevention detection and suppression of violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and construction materials used and results during the construction of a capital construction facility based on the inspection program from 14092017 g 4202617 as well as the results of such work, the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 421800533649
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 001800438383
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-09, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the implementation by Taldinskoye Yuzhnoye Mine Management JSC of a previously issued instruction on the elimination of violations, the deadline for which has expired Verification of the elimination by a legal entity of violations specified in the instruction on the elimination of violations, the deadline for which has expired The fulfillment by the audited entity of the instruction of the Siberian Directorate of Rostechnadzor


# 001800361939
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-21, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the elimination of violations set out in the regulation dated 19022018 P011106112, the deadline for which has expired. The subject of this inspection is the fulfillment by Taldinskoye Yuzhnoye Mine Management JSC of the regulation dated 19022018 P011106112 issued following an inspection conducted on the basis of the order of the Siberian Directorate of Rostechnadzor dated 30012018 011106112


# 421800351144
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800375632
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-06-18, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kemerovskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the requirements of land legislation expiration of the deadline for the execution of a previously issued order to eliminate the identified violation


# 421800357625
Unscheduled inspection
Start date: 2018-05-04, end date: 2018-05-28, duration:
Authority: YUzhnoSibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: control over the elimination of violations, the fulfillment of which is mandatory in accordance with an order previously issued to the audited person on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements


# 001800252747
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations of project documentation. Compliance of work performed and construction materials used and results during the construction of the facility capital construction, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 421802144939
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-10, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: implementation of federal state supervision over compliance with labor legislation


# 421800203288
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 00170802920620
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of identified violations specified in the regulation on the elimination of violations Compliance by the audited entity with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802920566
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of identified violations specified in the regulation on the elimination of violations Compliance by the audited entity with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802920532
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of identified violations specified in the regulation on the elimination of violations Compliance by the audited entity with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802920153
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of identified violations specified in the regulation on the elimination of violations Compliance by the audited entity with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802920207
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of the identified violations specified in the regulation on the elimination of violations Compliance by the audited person with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802920119
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring of compliance with the requirements of a previously issued regulation on the elimination of violations Verification of the elimination by a legal entity of identified violations specified in the regulation on the elimination of violations Compliance by the audited entity with violations of the regulations of the Siberian Directorate of Rostechnadzor


# 00170802627914
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations of project documentation. Compliance of work performed and construction materials used and results during the construction of the facility capital construction as well as the results of such work to the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the need for a construction permit to comply with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 42170701581645
Unscheduled inspection
Start date: 2017-05-03, end date: 2017-06-01, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kemerovskoi oblasti
Purpose of inspection: expiration of the deadline for the execution of a previously issued order to eliminate the identified violation


# 42170701309016
Unscheduled inspection
Start date: 2017-01-09, end date: 2017-01-16, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Statement 7785416 on compliance with mandatory requirements


# 42160700951686
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-11-21, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kemerovskoi oblasti
Purpose of inspection: verification of the execution of the order on the elimination of violations of land legislation from 20102014


# 42160601773299
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-19, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: compliance with labor laws


# 42150601208608
Unscheduled inspection
Start date: 2015-10-21, end date: 2015-11-18, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kemerovskoi oblasti
Purpose of inspection: verification of the execution of the order in the case of an administrative offense from 20102014


# 42150601284327
Unscheduled inspection
Start date: 2015-10-22, end date: 2015-11-19, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Kemerovskoi oblasti
Purpose of inspection: verification of the fulfillment of the previously issued prescription dated 28102014 256gt


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.