# 742201965970
Unscheduled inspection
Start date: 2022-04-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101415096
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration: 3
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: Kontrol prdpisaniya 83/1/1 ot 23.04.2021
# 741902926643
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-23, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: this audit is conducted in order to comply with subparagraph 51 of paragraph 5 of the protocol of the operational meeting of the Security Council of the Russian Federation dated 19072019. The objectives of this audit are to analyze the information contained in documents establishing the rightholder of the object of protection, the rights and obligations of authorized officials of the object of protection in respect of which verification is carried out in documents used in carrying out activities and related to the fulfillment of fire safety requirements, and to assess the conformity of the object of protection which is being checked for fire safety requirements
# 741801018462
Unscheduled inspection
Start date: 2018-09-04, end date: 2018-09-28, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po CHelyabinskoi oblasti
Purpose of inspection: Porucheniya Zamestitelya Predsedatelya Pravitelstva RF AG Hloponina ot 07122017 AHP98184
# 741800537273
Unscheduled inspection
Start date: 2018-07-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800471751
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-06-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the laying and backfilling of the gas pipeline along Pushkin Street Molodezhnaya Traktovaya Lane and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of paragraphs 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 741800417020
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the laying and backfilling of the gas pipeline along Gvardeyskaya Street and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of Paragraphs 23 and 31 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170802911542
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an external underground-above-ground high-pressure gas distribution pipeline, the installation and strapping of PHB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802992892
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation