Found 712 inspections:

# 242101427821
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 2791-ONS-1 dated 11/15/2021 issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 12/9/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101424627
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 2632-ONS-1 dated 10/25/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 12/9/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101406272
Unscheduled inspection
Start date: 2021-12-03, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 2634-ONS-1 dated 10/22/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 12/22/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101387438
Unscheduled inspection
Start date: 2021-12-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242101439027
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 242101362570
Unscheduled inspection
Start date: 2021-11-26, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 2630-ONS-1, previously issued to the person being checked, dated 10/28/2021, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 11/25/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101293651
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 26.09.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101293589
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 26.09.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101293503
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 26.09.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101277603
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 16.08.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101277540
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242101367447
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 242101339610
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242101185538
Unscheduled inspection
Start date: 2021-10-08, end date: —, duration: 16
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 27.09.2019 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101120897
Unscheduled inspection
Start date: 2021-10-08, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 08/24/2021 No. 2004-ONS-1 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/07/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101279578
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 2186-ONS-1 dated 09/17/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/28/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101119271
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242101118580
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06.11.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101118870
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06.11.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242100956104
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of works that are subject to verification in accordance with the approved program dated December 27, 2019 for inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242100955923
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 242100955812
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 242101242096
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 2059-ONS-1 dated 08/31/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/21/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101242089
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 2060-ONS-1 dated 08/31/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/21/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101135245
Unscheduled inspection
Start date: 2021-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242101277645
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 19.03.2019 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242101200212
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the inspected person order No. 1991-ONS-1 dated 08/26/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/14/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101200238
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 1727-ONS-1 dated 08/31/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/14/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101200226
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 2011-ONS-1 dated 08/27/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/14/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242101200176
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 242101200122
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 2068-ONS-1 dated 09/02/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/14/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100576909
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1276-ONS-1 dated 06/10/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09/03/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100577235
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100577199
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1310-ONS-1 dated 06/10/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09/02/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100564297
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 27.08.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242100564123
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 27.08.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242100564047
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100494380
Unscheduled inspection
Start date: 2021-08-18, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1282-ONS-1 dated 06/10/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/17/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100494323
Unscheduled inspection
Start date: 2021-08-18, end date: —, duration:
Authority:
Purpose of inspection:


# 242100487237
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100487135
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100492250
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration: 9
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06.11.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Requirements for a construction permit, as well as the parameters of a capital construction facility under construction or reconstruction specified in the construction permit; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242100431043
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 793-ONS-1 dated 04/28/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/13/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100429937
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1008-ONS-1 dated 05/24/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/12/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100429805
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 242100430588
Unscheduled inspection
Start date: 2021-08-11, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1324-ONS-1 dated 06/25/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/10/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100560619
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 865-ONS-3 dated 05/04/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100560589
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: . Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 752-ONS-3 dated 04/28/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100560636
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 866-ONS-3 dated 05/04/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100560574
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 242100560554
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 751-ONS-3 dated 04/28/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100314065
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100314045
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 242100314049
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration: 17
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 07.04.2017 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100314047
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration: 17
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 16.08.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100494492
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 1311-ons-1 dated 06/21/2021 issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/26/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100492788
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100492712
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1059-ONS-1 dated 05/31/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/26/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100492565
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1060-ONS-1 dated 05/31/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/26/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100314220
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 242100314252
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100314212
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 26.09.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100494793
Unscheduled inspection
Start date: 2021-08-20, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1467-ONS-1 dated 07/08/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/19/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100311720
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 752-ONS-3 dated 04/28/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07/16/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100311704
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 753-ONS-3 dated 04/28/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07/16/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100311701
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 865-ONS-3 dated 05/04/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07/16/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100311692
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 866-ONS-3 dated 05/04/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07/16/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100311674
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 751-ONS-3 dated 04/28/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07/16/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100405461
Unscheduled inspection
Start date: 2021-07-29, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued order dated 06/29/2021 No. 1408-ONS-3, on the elimination of identified violations at the specified capital construction facility, in connection with the notification received (dated 07/27/2021 ex. No. 22) on the elimination of violations before the expiration of the period specified in the order. The purpose of this audit is to establish the fact of elimination of previously identified violations. 7. The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires, respectively.


# 242100306322
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100305882
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06.11.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100297438
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100297416
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1035-ONS-3 dated 05/21/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/30/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100297381
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100306310
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06.11.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100300435
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242100288147
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Krasnoyarskomu krayu
Purpose of inspection: for the purpose of: – checking the implementation of Regulation No. 18521 dated 06/19/2020, issued by an official of the Rospotrebnadzor Department for the Krasnoyarsk Territory, with a deadline for eliminating violations until 06/16/2021. The objectives of this audit are: implementation of state supervision and control over compliance with the requirements of the legislation of the Russian Federation on the prevention of harmful effects of environmental factors on humans; prevention of infectious and mass non-infectious diseases (poisoning) of the population. The subject of this audit is to verify the fulfillment of an order issued by an official of the Department of Rospotrebnadzor in the Krasnoyarsk Territory.


# 242100246988
Unscheduled inspection
Start date: 2021-06-25, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 793-ONS-1 dated 04/28/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/24/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100246870
Unscheduled inspection
Start date: 2021-06-25, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 997-ONS-1 dated 05/20/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/24/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100246855
Unscheduled inspection
Start date: 2021-06-25, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 999-ONS-1 dated 05/20/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/24/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100247201
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 264-ons-3 dated 02/26/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/31/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100243034
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100242362
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100242347
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242100242336
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242100190468
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 1638-ONS-1 dated 08/28/2020, previously issued to the person being checked, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/15/2020. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100177875
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 3445-ONS-1 dated 12.12.2019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/26/2020. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100188052
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 711-ons-1 dated 04/14/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/06/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100188019
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 840-ons-1 dated 04/15/2021 issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/06/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100188037
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 842-ons-1 dated 04/16/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/06/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100196821
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 09.04.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100193961
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program dated 09.26.2018 for inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100196833
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of works that are subject to verification in accordance with the approved program dated December 27, 2019 for inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100196837
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of works that are subject to verification in accordance with the approved program dated December 27, 2019 for inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100194049
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program dated 09.26.2018 for inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100194028
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program dated 09.26.2018 for inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100240425
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 242100240403
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 796-ONS-1 dated 04/27/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100235370
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 117-ons-1 dated 12.02.2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100240369
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 864-ons-1 dated 04/28/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100240319
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: . Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 841-ONS-1 dated 04/16/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100240297
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 834-ONS-1 dated 04/16/2021 issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100240261
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 242100235396
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 116-ons-1 dated 02/20/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/27/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100235405
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 135-ONS-1 dated 02.26.2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05.26.2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100128524
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-05-04, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 376-ons-3 dated 02/24/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/19/2021.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100128440
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-05-04, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 377-ons-3 dated 02/24/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/19/2021.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100102188
Unscheduled inspection
Start date: 2021-04-16, end date: 2021-04-29, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 2860-ons-1 dated 12/11/2020 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/15/2021.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100188007
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to verify the fulfillment of the instruction No. 510-ons-1 dated 03/31/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/29/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100107918
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-16, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the instruction No. 3444-ONS-1, previously issued to the person being checked, dated 12.12.2019, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/01/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100108462
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-16, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the instruction No. 1634-ONS-1 dated 08/12/2020, previously issued to the person being checked, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 11/05/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100082934
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-16, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 58-ons-1 dated 02/18/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/02/2021.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100108424
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-16, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1863-ons-1 dated 09/28/2020 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 11/05/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100108375
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-16, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 1864-ons-1 dated 09/21/2020 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 10/22/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100128343
Unscheduled inspection
Start date: 2021-04-23, end date: 2021-05-07, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the instruction No. 118-ONS-1 dated 02/24/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/22/2021.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100170902
Unscheduled inspection
Start date: 2021-04-23, end date: —, duration: 1
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: implementation of state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms, in accordance with the instruction of the President of the Russian Federation, subitem 5.2 of paragraph 5 of the Protocol of the operational meeting of the Security Council of the Russian Federation dated February 23, 2021, approved by President of the Russian Federation Vladimir Putin on March 05, 2021. No. Pr-356 and the order of the Head of the Federal Service for Labor and Employment (Rostrud) M.Y. Ivankov dated 04/02/2021 No. 73 "On conducting unscheduled on-site inspections of the working conditions of foreign citizens involved in the implementation of large investment projects"; supervision of compliance with labor legislation and other regulatory legal acts containing labor law norms.


# 242100100503
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 05.03.2018 inspections during the construction of the capital construction facility; the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, in particular including the project documentation.7. The subject of this audit is:7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the availability of a building permit.


# 242100100491
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to inspection in accordance with the approved program dated 04/17/2020 for inspections during the construction of a capital construction facility; the objectives of this inspection are to prevent, identify and suppress violations of legislation on urban development, in particular including the project documentation.7. The subject of this audit is:7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the availability of a building permit.


# 242100088239
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06.11.2018 inspections during the construction of the capital construction facility; the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, in particular including the project documentation.7. The subject of this audit is:7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the availability of a building permit.


# 242100100513
Unscheduled inspection
Start date: 2021-04-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100088261
Unscheduled inspection
Start date: 2021-04-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100083034
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-14, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the instruction No. 345-ons-1 dated 02/26/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 03/31/2021.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100089056
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06.11.2018 inspections during the construction of the capital construction facility; the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, in particular including the project documentation.7. The subject of this audit is:7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the availability of a building permit.


# 242100100487
Unscheduled inspection
Start date: 2021-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242100043157
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-31, duration: 19
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program of 16.08.2018 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100043178
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-31, duration: 19
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 19.03.2019 inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development activities, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100023985
Unscheduled inspection
Start date: 2021-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 242100024006
Unscheduled inspection
Start date: 2021-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 242100022210
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-03-01, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 357-ONS-1 dated 03/24/2020, previously issued to the person being checked, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05/14/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100026103
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-26, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the instruction No. 1678-ONS-1 dated 08/12/2020, previously issued to the person being checked, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 11/05/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100022328
Unscheduled inspection
Start date: 2021-02-12, end date: —, duration:
Authority:
Purpose of inspection:


# 242100026101
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-26, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the instruction No. 1678-ONS-1 dated 08/12/2020, previously issued to the person being checked, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 11/05/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100022353
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-26, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 105-ons-1 dated 02/10/2020 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 04/16/2020.The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242105324389
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 242105327704
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242105324454
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242105324375
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-26, duration: 19
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 08/27/2018 for inspections during the construction of a capital construction facility; the objectives of this inspection are to prevent, identify and suppress violations of legislation on urban development, in particular including the project documentation.7. The subject of this audit is:7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the availability of a building permit.


# 242105342008
Unscheduled inspection
Start date: 2021-02-02, end date: —, duration:
Authority:
Purpose of inspection:


# 242105295369
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-02-05, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that:This inspection is carried out in order to verify the fulfillment of the previously issued instruction No. 2200-ons-1 dated 10/19/2020, on the elimination of identified violations at the specified capital construction facility, in connection with the notification received (dated 12/25/2020). No. 118) on the elimination of violations before the expiration of the period specified in the regulation.The purpose of this audit is to establish the fact of elimination of previously identified violations.7. The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires on 10.12.2020, respectively.


# 242005243254
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 31082017 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation


# 242005243275
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 07042017 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242005201981
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242005201962
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority:
Purpose of inspection:


# 242005201362
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program of 19032/2019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242005200990
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242005147183
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 27082018 inspections during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242005147182
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-11-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 27/122019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242005147180
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 27/122019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242005147179
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 27092019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242005177830
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-09, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the previously issued instruction from 25032020 356C1 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 02102020 bx 54 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this inspection is to establish the fact of elimination of previously identified violations 7 The subject of this inspection is to comply with the lawful instruction of the body carrying out the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the state construction supervision, the deadline for which expires, respectively


# 242005177821
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-09, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the previously issued order dated 18122019 3446C1 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 02102020 bx 55 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this inspection is to establish the fact of elimination of previously identified violations 7 The subject of this inspection is to comply with the lawful order of the body carrying out the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the state construction supervision, the deadline for which expires, respectively


# 242005177820
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-09, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the previously issued order dated 18122019 3446C1 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 02102020 bx 55 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this inspection is to establish the fact of elimination of previously identified violations 7 The subject of this inspection is to comply with the lawful order of the body carrying out the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the regional control of the state construction supervision, the deadline for which expires, respectively


# 242005177806
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-09, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 17082020 1636C1 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 02102020 bx 57 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this inspection is to establish the fact of elimination of previously identified violations 7 The subject of this inspection is to comply with the lawful instruction of the body implementing the regional state construction supervision, the deadline for which expires, respectively


# 242004465231
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004463886
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004463550
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 242004463542
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16082018 inspections during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242004463554
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 09042018 inspections during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242004440796
Unscheduled inspection
Start date: 2020-07-01, end date: 2020-07-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program of 19032/2019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242004458563
Unscheduled inspection
Start date: 2020-07-17, end date: 2020-08-13, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 16032020 384c3 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 09072020 bx 19 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this inspection is to establish the elimination of previously identified violations and verify the actual work performed in accordance with the prescribed measures.7 The subject of this inspection is The purpose of the inspection is to comply with the legal order of the body carrying out regional state construction supervision


# 242004458558
Unscheduled inspection
Start date: 2020-07-17, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004458556
Unscheduled inspection
Start date: 2020-07-17, end date: 2020-08-13, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 29012020 3755ons3 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 09072020 bx 18 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this inspection is to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures.7 The subject of this inspection is The purpose of the inspection is to comply with the legal order of the body carrying out regional state construction supervision


# 242004458540
Unscheduled inspection
Start date: 2020-07-17, end date: 2020-08-13, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the previously issued instruction dated 24012020 3770ons3 on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 09072020 bx 17 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this audit is to establish the elimination of previously identified violations and verify the actual work performed in accordance with the prescribed measures.The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision


# 242004419368
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 27/122019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242004419366
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 27/122019 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242004419362
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 27092019 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242004419358
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 15062017 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242004419356
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 04102016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 242004380198
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 16082018 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation


# 242004380164
Unscheduled inspection
Start date: 2020-04-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004380234
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 28/122018 for inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation


# 242004369894
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06/12/2018 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation


# 242004369934
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06/12/2018 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation


# 242004369174
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation


# 242004361691
Unscheduled inspection
Start date: 2020-03-27, end date: 2020-04-09, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction dated 12122019 3444C1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26032020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004361687
Unscheduled inspection
Start date: 2020-03-27, end date: 2020-04-09, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction dated 12122019 3444C1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26032020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004361682
Unscheduled inspection
Start date: 2020-03-27, end date: 2020-04-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction dated 12122019 3445C1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26032020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004335600
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004335146
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-06, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction dated 24012020 3770ons3 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 23032020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004302767
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004302652
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-16, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment of the instruction dated 13122019 3422C3 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28022020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004293062
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 31082017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation


# 242004293139
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 19032-019 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation


# 242004292999
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to inspection in accordance with the approved program dated 04102016 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban planning, including design Documentation


# 242004289539
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation


# 242004289498
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation


# 242004334976
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-04-13, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 07112019 3057/2003 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 16032020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the time period prescribed by the regulation


# 242004335097
Unscheduled inspection
Start date: 2020-03-13, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction dated 18122019 3447C1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 12032020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004243029
Unscheduled inspection
Start date: 2020-02-07, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004227417
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 242004227395
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004226680
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 242004223129
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-28, duration: 19
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 15062017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation


# 242004223137
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 242004305095
Unscheduled inspection
Start date: 2020-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 242004161163
Unscheduled inspection
Start date: 2020-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 242004160365
Unscheduled inspection
Start date: 2020-01-09, end date: 2020-01-31, duration: 17
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 08062018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation


# 242004204640
Unscheduled inspection
Start date: 2020-01-10, end date: —, duration:
Authority:
Purpose of inspection:


# 242004165805
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-01-24, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 28102019 2795/2003 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 10012020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004161817
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority:
Purpose of inspection:


# 242004232653
Unscheduled inspection
Start date: 2020-01-31, end date: 2020-02-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 31/102019 2823/2001 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 30012020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004232648
Unscheduled inspection
Start date: 2020-01-31, end date: —, duration:
Authority:
Purpose of inspection:


# 242004198240
Unscheduled inspection
Start date: 2020-01-15, end date: —, duration:
Authority:
Purpose of inspection:


# 242004202183
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-02-06, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 08112019 3041C1 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 23012020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004202240
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-02-06, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 2111/2019 3171C1 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 23012020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004202138
Unscheduled inspection
Start date: 2020-01-24, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004202130
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-02-06, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 31102019 27832011 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 23012020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903979335
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 19032-019 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903979321
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Monolitstroy Limited Liability Company


# 241903979290
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 31082017 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903979310
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 09042018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903975527
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 27092019 2515/2003 on the elimination of identified violations at the specified capital construction facility, which expires on 29112019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with


# 241903975520
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 27092019 2510ONS3 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 29112019the objectives of this inspection are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903990716
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-19, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 11102019 28122011 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05122019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241904096791
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms


# 241904068088
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Written request from Shemetova OV 247731419OB dated 27112019


# 241904087017
Unscheduled inspection
Start date: 2019-12-12, end date: 2020-01-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 07112019 3057/2003 on the elimination of identified violations at the specified capital construction facility in connection with the received notification dated 04122019 bx 63 on the elimination of violations before the expiration of the period specified in the prescriptionthe purpose of this inspection is to establish the elimination of previously identified violations and verify the work actually performed in accordance with the prescribed measures


# 241904036404
Unscheduled inspection
Start date: 2019-12-13, end date: 2019-12-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 2111/2019 3241C1 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 12122019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903872876
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 28/122018 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903872384
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903872433
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 05032018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903872361
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation


# 241903872336
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903868481
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 27092019 2557C1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 31/102019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903868469
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 27092019 2525ONS1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 31/102019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241904074604
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: ensuring compliance with and protection of labor rights and freedoms of citizens ensuring compliance by employers with labor legislation and other regulatory legal acts containing labor law norms


# 241903943317
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 18102019 2995C1 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22112019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903943290
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 25092019 2534ONS1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22112019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903943271
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 03092019 2624C1 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22112019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903892033
Unscheduled inspection
Start date: 2019-11-08, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241903892029
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-11-21, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 03102019 2709C1 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 07112019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903919182
Unscheduled inspection
Start date: 2019-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 241903941246
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-12-16, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: Ensuring the observance and protection of the labor rights and freedoms of citizens, including the right to safe working conditions


# 241903631040
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903631030
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903849976
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration:
Authority:
Purpose of inspection:


# 241903849970
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-25, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 15072019 1846ONS3 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 25/102019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the time period prescribed by the regulation


# 241903849969
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration:
Authority:
Purpose of inspection:


# 241903847651
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration:
Authority:
Purpose of inspection:


# 241903839854
Unscheduled inspection
Start date: 2019-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 241903651910
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 241903651743
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 241903640843
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 241903641034
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903630938
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 15062017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 241903810553
Unscheduled inspection
Start date: 2019-10-11, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241903824164
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 19062019 1814-2 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 14102019the objectives of this inspection are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903594283
Unscheduled inspection
Start date: 2019-09-11, end date: 2019-09-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 31082017 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation


# 24190803489844
Unscheduled inspection
Start date: 2019-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803489840
Unscheduled inspection
Start date: 2019-09-13, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803491038
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803489838
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803485285
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803485263
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program from 30062017 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803485258
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program from 05032018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803485250
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803485246
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803485245
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803468655
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program dated 28/122018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803468713
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 06/12/2018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803468666
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 09042018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803467550
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 06/12/2018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803467549
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 06/12/2018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803467534
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803467532
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803467530
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803466264
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 16082018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803466234
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803468693
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 1367B dated 22052019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01082019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803468691
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 1366B dated 21052019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01082019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 241902939080
Unscheduled inspection
Start date: 2019-08-09, end date: 2019-09-05, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms A written appeal from the staff of Monolitstroy LLC 247441619OB on violation of labor rights


# 24190803472614
Unscheduled inspection
Start date: 2019-08-09, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241903764784
Unscheduled inspection
Start date: 2019-08-09, end date: 2019-09-05, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms A written appeal from the staff of Monolitstroy LLC 247441619OB on violation of labor rights


# 24190803448395
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803449344
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 06/12/2018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803449343
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 06/12/2018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803449342
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 06/12/2018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803449340
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803449338
Unscheduled inspection
Start date: 2019-07-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803449337
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803449328
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program dated January 26, 2018 for inspections during the construction of the capital construction facility The objectives of the audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803449327
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program dated January 26, 2018 for inspections during the construction of the capital construction facility The objectives of the audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803449326
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program dated January 26, 2018 for inspections during the construction of the capital construction facility The objectives of the audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the audit is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803449325
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 08062018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803433252
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program from 31082017 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803433196
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803435767
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 1327OZHS of 16052019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803435762
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked Regulation No. 927OZHS dated 29042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13062019. The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period established by the regulation. The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803435761
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 1329OZHS of 16052019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803435760
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 1287OZHS of 16052019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803435759
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked Regulation No. 923OZHS dated 29042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13062019. The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period established by the regulation. The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803435758
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked Regulation No. 924OZHS dated 29042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13062019. The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period established by the regulation. The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803435751
Unscheduled inspection
Start date: 2019-06-14, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803437320
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-07-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 4600B dated 04/122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803437318
Unscheduled inspection
Start date: 2019-06-18, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803437317
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-07-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 4592B dated 05/122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803437316
Unscheduled inspection
Start date: 2019-06-18, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803437315
Unscheduled inspection
Start date: 2019-06-18, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803437314
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-07-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 4599B dated 04/122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803437313
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-07-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 4591B dated 07/122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803437312
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-07-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 4598B dated 07122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803424734
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803424704
Unscheduled inspection
Start date: 2019-05-30, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803417394
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 941OZHS dated 12042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 23052019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803417385
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 591OZHS dated 29032019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 23052019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803409886
Unscheduled inspection
Start date: 2019-05-07, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803405230
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803405229
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program dated 24/12/2016 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803405242
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803405241
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 09042018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803403745
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803403742
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803403740
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803403730
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803403703
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803403712
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803403711
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803403710
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803403709
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803391392
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-25, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked Regulation No. 277OZHS dated 14022019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 11042019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803398247
Unscheduled inspection
Start date: 2019-04-19, end date: 2019-05-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation No. 234OZHS dated 21022019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18042019. The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period established by the regulation. The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803398242
Unscheduled inspection
Start date: 2019-04-19, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803398240
Unscheduled inspection
Start date: 2019-04-19, end date: 2019-05-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the instruction 232OZHS dated 21022019, previously issued to the person being checked, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18042019. The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the time period established by the regulation. The subject of the audit is to comply with the lawful instruction of the body carrying out regional state construction supervision


# 24190803380108
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803377676
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803377705
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program of 16082018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803403772
Unscheduled inspection
Start date: 2019-04-26, end date: 2019-05-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked Regulation No. 620OZHS dated 19032019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 25042019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803403771
Unscheduled inspection
Start date: 2019-04-26, end date: 2019-05-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 228OZHS of 25022019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 25042019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803403770
Unscheduled inspection
Start date: 2019-04-26, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803377931
Unscheduled inspection
Start date: 2019-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803377916
Unscheduled inspection
Start date: 2019-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803377914
Unscheduled inspection
Start date: 2019-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803377913
Unscheduled inspection
Start date: 2019-04-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803367400
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-04-08, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 4895B dated 18122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 11032019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803367399
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-04-08, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 5068B dated 18122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 11032019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803367398
Unscheduled inspection
Start date: 2019-03-12, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803364097
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-04-08, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 4896B dated 18122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 11032019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803364096
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-04-08, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 4895B dated 18122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 11032019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803364091
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-04-08, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation 5068B dated 18122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 11032019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803361282
Unscheduled inspection
Start date: 2019-03-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803361249
Unscheduled inspection
Start date: 2019-03-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803361292
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program from 05032018 inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803353816
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation No. 5227OZHS dated 29.012019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28022019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803353803
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 5230OZHS dated 29.012019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28022019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803371152
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-04-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 4888OZHS dated 25/122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21032019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803371172
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803371171
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-04-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 4888OZHS dated 25/122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21032019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 241902471605
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241902467946
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 27082018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241902467978
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241902467973
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241902467968
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241902467960
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241902467831
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 15062017 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241902439533
Unscheduled inspection
Start date: 2019-01-18, end date: 2019-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 5088OZHS dated 26/122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17.012019. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241902459317
Unscheduled inspection
Start date: 2019-01-29, end date: 2019-02-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 14122018 4866SENiEK previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 28.012019. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241902447182
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241902447178
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-08, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 12112018 4427NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 25.012019. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241902447171
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 241902483570
Unscheduled inspection
Start date: 2019-01-09, end date: 2019-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 06/12/2018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241902376103
Unscheduled inspection
Start date: 2019-01-09, end date: 2019-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 06/12/2018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241902376076
Unscheduled inspection
Start date: 2019-01-09, end date: 2019-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 06/12/2018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241902376064
Unscheduled inspection
Start date: 2019-01-09, end date: 2019-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 06/12/2018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241902343531
Unscheduled inspection
Start date: 2019-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 241902343529
Unscheduled inspection
Start date: 2019-01-09, end date: 2019-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241902343524
Unscheduled inspection
Start date: 2019-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 241902343520
Unscheduled inspection
Start date: 2019-01-09, end date: 2019-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802313432
Unscheduled inspection
Start date: 2018-12-21, end date: 2019-01-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 26112018 4437OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 20122018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802178504
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 04102016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802178503
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 05032018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802173437
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16082018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802173414
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24/12/2016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802173366
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24/12/2016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802173100
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to verification in accordance with the approved program of 31082017 for conducting inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for used energy resources 72 Compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of a construction permit


# 241802163701
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-17, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked by the ENIEK dated 31102018 3989 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 03122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802217829
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order dated 19102018 4006OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13122018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802217816
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked dated 31102018 3989OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802217939
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 26112018 4429OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802214800
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 28092018 3505OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13/122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802214783
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 28092018 3459OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13/122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802217875
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 16112018 4601B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802217869
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 14112018 4511B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the time period established by the regulation. 7 The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802217865
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 15112018 4512B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802217860
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 15112018 4510B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802217854
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 14112018 4513B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802217851
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 13112018 4514B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802217846
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 13112018 4515B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802217842
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 13112018 4408B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802217834
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 13112018 4410B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17/122018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802105667
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-12-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 18102018 4044OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22112018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802023085
Unscheduled inspection
Start date: 2018-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241802030641
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 05092018 3477EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01112018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802026147
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 27082018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802026030
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802026006
Unscheduled inspection
Start date: 2018-11-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241802026000
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802025994
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26092018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802025893
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802025933
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 19102015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802022900
Unscheduled inspection
Start date: 2018-11-02, end date: —, duration:
Authority:
Purpose of inspection:


# 241802022883
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 07042017 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802145020
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-10, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 10102018 3720TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26112018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802056774
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-12-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 17082018 2886B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/12/2018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802040912
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-12-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 17082018 2886B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/12/2018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802040006
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-12-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 14082018 2877B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/12/2018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802039998
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-12-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 14082018 2878B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/12/2018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802039988
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-12-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order dated 15082018 2879B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/12/2018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802039975
Unscheduled inspection
Start date: 2018-11-07, end date: —, duration:
Authority:
Purpose of inspection:


# 241802039969
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-12-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order dated 15082018 2880B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/12/2018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is the fulfillment of the order of the authority carrying out regional state construction supervision


# 241802039960
Unscheduled inspection
Start date: 2018-11-07, end date: —, duration:
Authority:
Purpose of inspection:


# 241802148972
Unscheduled inspection
Start date: 2018-11-30, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241802056621
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 11092018 3510B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09/12/2018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802056716
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 11092018 3512B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09/12/2018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802056614
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 11092018 3511B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09/12/2018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802056765
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 11092018 3408B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09/12/2018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802056755
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the instruction dated 12092018 3407B previously issued to the person being audited on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09/12/2018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802056744
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241802056733
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 241802056639
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241801695273
Unscheduled inspection
Start date: 2018-10-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241801773197
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 28082015 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241801731883
Unscheduled inspection
Start date: 2018-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 241801733603
Unscheduled inspection
Start date: 2018-10-04, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241801697272
Unscheduled inspection
Start date: 2018-10-04, end date: 2018-10-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 02072018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241801761068
Unscheduled inspection
Start date: 2018-10-05, end date: —, duration:
Authority:
Purpose of inspection:


# 241801801502
Unscheduled inspection
Start date: 2018-10-09, end date: —, duration:
Authority:
Purpose of inspection:


# 241801801481
Unscheduled inspection
Start date: 2018-10-09, end date: —, duration:
Authority:
Purpose of inspection:


# 241801801472
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of an instruction previously issued to the person being checked from 28022018 281NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08102018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is to comply with the instructions of the authority carrying out regional state construction supervision


# 241801924637
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 241801941609
Unscheduled inspection
Start date: 2018-10-19, end date: 2018-11-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 06092018 3478OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18/102018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241801213717
Unscheduled inspection
Start date: 2018-09-13, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800673690
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 05032018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800673661
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 241800673680
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800673676
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800670806
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800670500
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 31082017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800670033
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 04102016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800669760
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800669902
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800669930
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800669708
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800669687
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 24/12/2016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800669664
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 24/12/2016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800669001
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800668992
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 241800616585
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 31052018 1461SENiEK previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 14082018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800669659
Unscheduled inspection
Start date: 2018-08-31, end date: —, duration:
Authority:
Purpose of inspection:


# 241800669713
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 27062018 1874OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 30082018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800605235
Unscheduled inspection
Start date: 2018-08-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800586906
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 20062018 1939OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 02082018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800589641
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24032015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800586502
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800575295
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800575287
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction dated 31052018 1812B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 31072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800575276
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to verify the fulfillment of the previously issued to the person being audited order dated 30052018 1808B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 31072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800575263
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order dated 30052018 1809B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 31072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800575255
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800575241
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to verify the fulfillment of the previously issued to the person being audited order dated 29052018 1810B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 31072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800575192
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-14, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited regulation No. 14052018 1238EN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 31072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800647160
Unscheduled inspection
Start date: 2018-08-24, end date: 2018-09-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being audited dated 28062018 2011OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 23082018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800647096
Unscheduled inspection
Start date: 2018-08-24, end date: 2018-09-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 29052018 1458OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 23082018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800580236
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-20, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 22062018 1999SENiEK on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 20072018 bx 165 on the elimination of violations before the expiration of the period specified in the instruction, the purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures 7 The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires, respectively.


# 241800529993
Unscheduled inspection
Start date: 2018-07-13, end date: 2018-07-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 23052018 1384OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 12072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800498915
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800552815
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-08-02, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 31052018 1461OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19072018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800498985
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800498971
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800498942
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800498925
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800495086
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800494679
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code Verification of the availability of a building permit in the Russian Federation


# 241800466883
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited regulation No. 17052018 1463SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18062018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800466812
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited regulation No. 17052018 1467SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18062018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800466850
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited regulation No. 17052018 1465SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18062018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800466729
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited regulation No. 17052018 1466SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18062018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800469593
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-07-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 27042018 944OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800469475
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-07-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 07032018 518OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21062018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800469463
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-07-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 07032018 583OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800469608
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-07-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to verify the fulfillment of the previously issued to the person being audited instruction No. 27042018 972OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21062018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800407864
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 09042018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800407871
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24032015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800407849
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800405918
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 10052017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800405879
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 10052017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800403792
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800403783
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800403775
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800403769
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800397094
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 05032018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800392887
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800391858
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 31082017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800421864
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800359581
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 29032018 565OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17052018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 001800361954
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-31, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of the previously issued to the person being checked order dated 14032018 091001 on the elimination of previously identified violations, the deadline for which has expired. The purpose of the audit is to establish the fact of elimination of previously identified violations specified in the order dated 14032018 091001. The subject of this audit is the fulfillment of the order of the state construction supervision authority dated 14032018 091001


# 241800381350
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 14052018 1357TN on the elimination of identified violations at the specified capital construction facility, which expires on 28052018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800381073
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 03042018 887B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800381053
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 04042018 885B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800381097
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 05042018 884B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800381002
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 03042018 888B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800380970
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 04042018 886B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28052018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800380943
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 05042018 883B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28052018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800376846
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-06-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 30032018 615TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800376816
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-06-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 04042018 815TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800376749
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-06-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 30032018 615NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21052018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800318738
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800318733
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800318723
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800319109
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800318711
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800319080
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800318696
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 02032016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800318693
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800316760
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 04102016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800307926
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 26072017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800259923
Unscheduled inspection
Start date: 2018-04-13, end date: 2018-04-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 26.012018 5728OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 12042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800257589
Unscheduled inspection
Start date: 2018-04-13, end date: 2018-04-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction from 30012018 5601OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 12042018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800271561
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 13032018 663EN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 16042018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800269848
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-05-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction dated 26022018 484TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19042018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800269325
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-05-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 09112017 4720OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800244374
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 26.012018 5728OZHS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 26032018 bx 36 on the elimination of violations before the expiration of the period specified in the instruction the task of this inspection is to establish the fact of elimination of previously identified violations and verify the work actually performed in accordance with the prescribed measures 7 The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires, respectively.


# 241800242416
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-18, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 26022018 484TN on the elimination of identified violations at the specified capital construction facility in connection with the notification from 26032018 bx 35 on the elimination of violations before the expiration of the period specified in the instruction, the purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures 7 The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires, respectively.


# 241800242405
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-18, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 26022018 484TN on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 26032018 bx 35 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of the lawful order of the body carrying out regional state construction supervision.


# 241800231853
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800231728
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits


# 241800231648
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 19102015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits


# 241800231868
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800229033
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 14072016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits


# 241800229167
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits


# 241800242608
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction dated 26022018 220TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 02042018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800304036
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-14, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 13042018 1036TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 25042018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800304019
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-14, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction dated 13042018 936TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 25042018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800320055
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited regulation No. 1197EN dated 20042018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26042018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800275982
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 28022018 281EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800195246
Unscheduled inspection
Start date: 2018-03-20, end date: 2018-04-02, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 20022018 470EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19032018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800205044
Unscheduled inspection
Start date: 2018-03-23, end date: 2018-04-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 30012018 5595OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22032018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the order of the authority carrying out regional state construction supervision


# 241800093831
Unscheduled inspection
Start date: 2018-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800090522
Unscheduled inspection
Start date: 2018-03-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800090607
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800084989
Unscheduled inspection
Start date: 2018-03-02, end date: —, duration:
Authority:
Purpose of inspection:


# 241800083538
Unscheduled inspection
Start date: 2018-03-02, end date: —, duration:
Authority:
Purpose of inspection:


# 241800205219
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 30012018 5598TN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 23032018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800223872
Unscheduled inspection
Start date: 2018-03-27, end date: —, duration:
Authority:
Purpose of inspection:


# 241800223838
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-23, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 15112017 4824B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26032018 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800223683
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-23, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 15112017 4823B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26032018 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 241800223825
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-23, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 16112017 4821B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26032018 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800223647
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-23, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 16112017 4820B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26032018 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 241800223697
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-24, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 14112017 4819B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26032018 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 241800058020
Unscheduled inspection
Start date: 2018-02-13, end date: 2018-02-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period


# 241800083182
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 08052015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800079818
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-03-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period


# 241800032673
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800026622
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800096040
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-03-14, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 5565EN dated 31.012018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26022018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800016053
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period


# 24180803043505
Unscheduled inspection
Start date: 2018-01-15, end date: 2018-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 08052015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 24180803057004
Unscheduled inspection
Start date: 2018-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 24180803057125
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 10052017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits


# 24180803036862
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 29112017 4745NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 16.012018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 24180803052764
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-02-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 28082017 3549OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on January 18, 2018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24180803018793
Unscheduled inspection
Start date: 2018-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 24180803019325
Unscheduled inspection
Start date: 2018-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 24180803019013
Unscheduled inspection
Start date: 2018-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 24180803019108
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits


# 24180803015393
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-01-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 24180803015278
Unscheduled inspection
Start date: 2018-01-09, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802908389
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802972553
Unscheduled inspection
Start date: 2017-12-19, end date: 2018-01-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction No. 4985EN dated 27/12017 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18/122017. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out Regional State construction supervision


# 24170802960982
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being audited dated 06102017 4149NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 12122017. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out regional State construction supervision


# 24170802773278
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 31082017 3540B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01112017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802773258
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction dated 2402017 3542B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01112017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802775521
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 30082017 3538B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01/12017. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out regional State construction supervision


# 24170802775513
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 29082017 3541B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01112017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out regional State construction supervision


# 24170802775499
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 31082017 3539B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01/12017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802773298
Unscheduled inspection
Start date: 2017-11-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802762403
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170802882577
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802771419
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 10052017 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170802771404
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802764022
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to works on the reconstruction of the capital construction facility that have an impact on the safety of the capital construction facility


# 24170802762336
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802762327
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 19102015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170802837185
Unscheduled inspection
Start date: 2017-11-15, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802834563
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-12-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 171 dated 07/12017 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are the prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation7 The subject of this inspection is 71 Verification compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of a construction permit


# 24170802830480
Unscheduled inspection
Start date: 2017-11-14, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802830284
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 28092017 3684TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13112017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the body carrying out regional State construction supervision


# 24170802830257
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 28092017 4093TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13112017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802653258
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction dated 2402017 3411B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06102017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802652957
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802653209
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the previously issued to the person being audited instruction dated 2402017 3412B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06102017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802652924
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction dated 2402017 3415B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06102017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802651792
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the previously issued to the person being audited instruction dated 2402017 3451B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06102017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out Regional State construction supervision


# 24170802652888
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction dated 2402017 3416B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06102017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out regional State construction supervision


# 24170802651749
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction dated 2402017 3452B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06102017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802638897
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-19, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 28082017 3404EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 05102017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802638880
Unscheduled inspection
Start date: 2017-10-06, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802618785
Unscheduled inspection
Start date: 2017-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802606035
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802566657
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802747125
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction dated 27092017 3726SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 27102017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the body carrying out Regional State construction supervision


# 24170802747216
Unscheduled inspection
Start date: 2017-10-31, end date: 2017-11-14, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 06102017 4148EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 010102017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802318490
Unscheduled inspection
Start date: 2017-09-19, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170801950885
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-21, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 31072017 2804OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 07092017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out regional State construction


# 24170802567997
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-10-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 28082017 3353NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22092017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170802398890
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-10-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 31072017 2732NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22092017 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802485363
Unscheduled inspection
Start date: 2017-09-26, end date: —, duration:
Authority:
Purpose of inspection:


# 24170801968871
Unscheduled inspection
Start date: 2017-09-04, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170801913161
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170801916721
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170801916932
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation Verification of compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources Verification of a construction permit Verification of a certificate of admission to the types of work on the reconstruction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170801916656
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170801914826
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 24/12/2016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170801914809
Unscheduled inspection
Start date: 2017-09-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170801914318
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170801914341
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170801913804
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 14072016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170802541574
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170802541542
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170802318733
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-10-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 31052017 1845NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19092017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802318674
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-10-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 01062017 2052NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19092017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170802317857
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701875824
Unscheduled inspection
Start date: 2017-08-18, end date: 2017-08-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 20072017 2344OZHS on the elimination of identified violations at the specified capital construction facility, which expires on 17082017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701870535
Unscheduled inspection
Start date: 2017-08-18, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701870531
Unscheduled inspection
Start date: 2017-08-18, end date: 2017-08-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 29062017 2242OZHS on the elimination of identified violations at the specified capital construction facility, which expires on 17082017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701870390
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being audited dated 27062017 2359B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 14082017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701870384
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 27062017 2311B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 14082017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701870372
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 29062017 2310B previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 14082017the objectives of this inspection are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out regional State construction supervision


# 24170701870361
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of an order previously issued to the person being audited dated 29062017 2309B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 14082017the objectives of this audit are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority responsible for Regional State construction supervision


# 24170701870352
Unscheduled inspection
Start date: 2017-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701870468
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of an instruction previously issued to the person being checked from 28062017 2307B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 14082017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is to comply with the instructions of the body carrying out regional State construction supervision


# 24170701804755
Unscheduled inspection
Start date: 2017-08-16, end date: 2017-08-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 16052017 1618OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15082017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701802055
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-23, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 26062017 2232SENiEK previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 09082017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701838523
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 19102015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701804834
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 11042017 1266NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21082017 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701845489
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 24072017 bx 116 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this inspection is 71 Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Verification of a construction permit 73 Verification of a certificate of admission to the types of work on the construction of the capital construction facility which have an impact on the safety of the capital construction facility


# 24170701845284
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701845290
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 22052017 for inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701841853
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to works on the reconstruction of the capital construction facility that have an impact on the safety of the capital construction facility


# 24170701841657
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701841637
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 24/12/2016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701841597
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 16/12/2016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is 71 Verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of work on the construction of the capital construction facility that have an impact on the safety of a capital construction facility


# 24170701841609
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that


# 24170701841584
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701837466
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701762790
Unscheduled inspection
Start date: 2017-07-05, end date: 2017-08-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 16052017 1618OZHS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28062017 bx 71 on the elimination of violations before the expiration of the period specified in the prescriptionthe objectives of this inspection are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures.7 The subject of this The purpose of the inspection is to comply with the legal order of the body carrying out regional state construction supervision, the deadline for which expires on the DATE respectively


# 24170701729747
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701723025
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701720967
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701736712
Unscheduled inspection
Start date: 2017-07-04, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701729725
Unscheduled inspection
Start date: 2017-07-04, end date: 2017-07-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to works on the reconstruction of the capital construction facility that have an impact on the safety of the capital construction facility


# 24170701723047
Unscheduled inspection
Start date: 2017-07-04, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701776369
Unscheduled inspection
Start date: 2017-07-24, end date: 2017-08-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 23052017 1685EN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21072017 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out regional State construction supervision


# 24170701645953
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701641847
Unscheduled inspection
Start date: 2017-06-02, end date: 2017-06-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program from 02032016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701639048
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701630357
Unscheduled inspection
Start date: 2017-06-02, end date: 2017-06-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 20072016 inspections during the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701646324
Unscheduled inspection
Start date: 2017-06-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701641871
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701641851
Unscheduled inspection
Start date: 2017-06-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701639461
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program dated 24/12/2016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701639431
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701639394
Unscheduled inspection
Start date: 2017-06-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701630231
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16022017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701613428
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-06-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 29032017 641NSS on the elimination of identified violations at the specified capital construction facility, which expires on 18052017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701614319
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-06-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 29032017 1019NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 18052017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701529948
Unscheduled inspection
Start date: 2017-05-05, end date: 2017-05-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 28022017 314OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 04052017the objectives of this inspection are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701529893
Unscheduled inspection
Start date: 2017-05-05, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701621786
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-06-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 24042017 1194SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22052017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701564138
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701549816
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to inspection in accordance with the approved program from 20032017 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701546718
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 19102015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701536918
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701533751
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701497896
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 06102016 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation Verification of compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources Verification of a construction permit Verification of a certificate of admission to the types of work on the reconstruction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701496064
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 19102015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701493052
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701422291
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-03-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 13012017 18OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701426754
Unscheduled inspection
Start date: 2017-03-14, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701426709
Unscheduled inspection
Start date: 2017-03-14, end date: 2017-04-10, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 14022017 47B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13032017 The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out regional State construction supervision


# 24170701426704
Unscheduled inspection
Start date: 2017-03-14, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701423289
Unscheduled inspection
Start date: 2017-03-14, end date: 2017-04-10, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 14022017 50B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13032017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body implementing the regional State construction supervision


# 24170701423269
Unscheduled inspection
Start date: 2017-03-14, end date: 2017-04-10, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 14022017 48B on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13032017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body implementing the regional State construction supervision


# 24170701423207
Unscheduled inspection
Start date: 2017-03-14, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701484152
Unscheduled inspection
Start date: 2017-03-29, end date: 2017-04-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 20032017 664SENiEK previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701396165
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that have an impact on the safety of the capital construction facility


# 24170701396152
Unscheduled inspection
Start date: 2017-03-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701392866
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 16112016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, and to verify the availability of a certificate of admission to the types of work on the construction of the capital construction facility that provide impact on the safety of a capital construction facility


# 24170701392829
Unscheduled inspection
Start date: 2017-03-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701404616
Unscheduled inspection
Start date: 2017-03-02, end date: 2017-03-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 26122016 2415OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701453119
Unscheduled inspection
Start date: 2017-03-23, end date: 2017-04-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 23012017 16NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701396181
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24/12/2016 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that have an impact on the safety of the capital construction facility


# 24170701392718
Unscheduled inspection
Start date: 2017-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701392882
Unscheduled inspection
Start date: 2017-03-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701447906
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-04-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 03022017 52SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 20032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701369437
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of an order previously issued to the person being audited to eliminate identified violations at a capital construction facility, the deadline for which expires. The objectives of this audit are to establish the fact of eliminating previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24170701334932
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of an order previously issued to the person being audited to eliminate identified violations at a capital construction facility, the deadline for which expires. The objectives of this audit are to establish the fact of eliminating previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period.


# 24170701350102
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701340574
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation The subject of this audit is to verify the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for energy resources used, verification of the availability of a construction permit, verification of the availability of a certificate of admission to the types of work on the reconstruction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701335843
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation


# 24170701335822
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation


# 24170701335869
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation


# 24170701335449
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701335419
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701335477
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701313039
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-01-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The subject of these inspections is the fulfillment of the lawful order of the body carrying out regional state construction supervision


# 24170701312843
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-01-18, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The subject of these inspections is the fulfillment of the lawful order of the body carrying out regional state construction supervision


# 24170701334902
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-02-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of an order previously issued to the person being audited to eliminate identified violations at a capital construction facility, the deadline for which expires. The objectives of this audit are to establish the fact of eliminating previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period.


# 19160701265033
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-30, duration:
Authority: Ministerstvo stroitelstva i zhilischnokommunalnogo hozyaistva Respubliki Hakasiya
Purpose of inspection: According to the notice on the elimination of violations dated 30112016, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, and comply with the instructions of the state control and supervision authorities


# 24160701206196
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-29, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: protection of the rights and interests of employees in connection with the consideration of Maslov's appeal from 2111016 7697116 on labor protection issues


# 24160701220011
Unscheduled inspection
Start date: 2016-12-09, end date: 2017-01-05, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: ensuring compliance with and protection of labor rights and freedoms of citizens ensuring compliance by employers with labor legislation and other regulatory legal acts containing labor law norms


# 19160700991782
Unscheduled inspection
Start date: 2016-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 19160700991342
Unscheduled inspection
Start date: 2016-10-05, end date: 2016-11-01, duration:
Authority: Ministerstvo stroitelstva i zhilischnokommunalnogo hozyaistva Respubliki Hakasiya
Purpose of inspection: supervision of construction according to the notice of completion dates 196 dated 16092016, When setting the objectives of the inspection, the following information is indicated. In the case of a scheduled inspection, a link to the approved annual plan for conducting scheduled inspections. in the case of an unscheduled on-site inspection, the details of an order previously issued to the person being checked to eliminate the identified violation, the deadline for which has expired, the details of appeals and applications from citizens of legal entities persons of individual entrepreneurs who have entered the state control and supervision bodies and municipal control bodies the details of the order of the head of the state control and supervision body issued in accordance with the instructions of the President of the Russian Federation and the Government of the Russian Federation the details of the prosecutor's request for an unscheduled inspection within the framework of supervision of the implementation of laws and the details of the materials and appeals attached to the request in the case of an unscheduled on-site inspection, which is subject to However, in order to take urgent measures, it must be carried out immediately in connection with harm or violation of the requirements being checked if such harm or violation of the requirements is detected immediately at the time of its commission, the details of the attached copy of the document report memorandum and others submitted by the official who discovered the violation. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.