Found 12 inspections:

# 742201517837
Unscheduled inspection
Start date: 2022-01-17, end date: 2022-01-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu metallicheskogo karkasa zdaniya v/o 1-5/A-D (zavershennyi etap), ustroistvu ograzhdayuschih konstrukcii (zavershennyi etap), vypolneniyu protivopozharnyh meropriyatii (ognezaschita posle zaversheniya rabot),ustroistvu krovelnogo ograzhdeniya v processe proizvodstva rabot. i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742101338489
Unscheduled inspection
Start date: 2021-11-17, end date: 2021-11-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu metallicheskogo karkasa zdaniya otm. 19.600 v/o 1-5/A-D (zavershennyi etap), ustroistvu vnutrennih inzhenernyh sistem (v processe proizvodstva rabot), ustroistvu ograzhdayuschih konstrukcii (v processe proizvodstva rabot). i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100513279
Unscheduled inspection
Start date: 2021-09-01, end date: 2021-09-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu metallicheskogo karkasa zdaniya otm +13.000 v/sch 1-5/AD (zavershennyi etap), vypolneniyu protivopozharnyh meropriyatii (ognezaschita) v processe proizvodstva rabot. i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 742100299637
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 662100311830
Unscheduled inspection
Start date: 2021-06-23, end date: —, duration: 5
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Ustanovit, chto nastoyaschaya proverka provoditsya s celyu ustanovleniya fakta ispolneniya (neispolneniya) predpriyatiem - OOO «SLK Cement», ranee vydannyh predpisanii ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii ot 11.06.2019 №№ 299-4, 299-6, srokom ispolneniya 01.06.2021.


# 742100226363
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100151795
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the installation of foundations for equipment F-1, F-2, F-3, F-4 (completed stage), the installation of columnar foundations for the columns of the building, the installation of the floor slab of the Fm-1 building, basement beams in/o 1-5/A-D, underground laying of water supply pipes and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100097490
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the construction of foundations for the equipment of the Fm 2 mill in/o 1-5/A-D, pits (completed stage), foundations for equipment F-1, F-2, F-3, F-4, columnar foundations for the columns of the building in/o 1-5/D (in the course of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100032108
Unscheduled inspection
Start date: 2021-02-26, end date: 2021-03-04, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed according to the PIC, the foundation pit (the final stage), the construction of the pit for the PKN, the foundations for the equipment of the Fm2 mill in/o 1-5/A-D, the columnar foundations for the columns of the building according to osya A (during the work) and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources; 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 662105313579
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-01-22, duration: 3
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu: ustanovleniya fakta ispolneniya (neispolneniya) OOO «SLK Cement» ranee vydannogo predpisaniya ot 24.03.2020 № 132-1, srok vypolneniya kotorogo istek 11.01.2021 (prikazy o prodlenii sroka ispolneniya ranee vydannogo predpisaniya ot 01.06.2020 № 522, ot 14.10.2020 № 1117). Zadachami nastoyaschei proverki yavlyayutsya: proverka soblyudeniya trebovanii prirodoohrannogo zakonodatelstva RF v oblasti ohrany atmosfernogo vozduha. Predmetom nastoyaschei proverki yavlyaetsya: -vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya.


# 662105345498
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-29, duration: 5
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu ustanovleniya fakta ispolneniya (neispolneniya) predpriyatiem OOO «SLK Cement» ranee vydannogo predpisaniya ob ustranenii narusheniya zakonodatelstva v oblasti ohrany okruzhayuschei sredy i narushenii prirodoohrannyh trebovanii ot 11.06.2019 № 299-9, srok vypolneniya, kotorogo istek 06.01.2021. Zadachami nastoyaschei proverki yavlyayutsya proverka soblyudeniya trebovanii prirodoohrannogo zakonodatelstva RF v oblasti obrascheniya s othodami. Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya.


# 002004342912
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-03-24, duration: 10
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu ustanovleniya fakta vypolneniya nevypolneniya OAO «Suholozhskcement» ranee vydannyh Departamentom Rosprirodnadzora po Uralskomu federalnomu okrugu predpisanii ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii zakonodatelstva ot 11062019 2992 2993 2995 2997 srok vypolneniya kotoryh istekaet 10032020 Zadachami nastoyaschei proverki yavlyayutsya proverka soblyudeniya trebovanii prirodoohrannogo zakonodatelstva RF v chasti geologicheskogo izucheniya racionalnogo ispolzovaniya i ohrany nedr v oblasti ohrany atmosfernogo vozduha Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo nadzora


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.