Found 190 inspections:

# 742004888562
Unscheduled inspection
Start date: 2020-09-30, end date: —, duration:
Authority:
Purpose of inspection:


# 00170803028749
Unscheduled inspection
Start date: 2017-12-27, end date: 2017-12-27, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to issue a permit for the commissioning of thermal power plants and heating networks on the basis of an application from the director of MCU "Chelyabstroyzakazchik" ex 1145 dated 11122017 ex H17601 dated 11122017


# 742201536260
Unscheduled inspection
Start date: 2022-01-26, end date: 2022-02-08, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing structures of the third (external and internal walls, floors), partitions B/o 1-7/A-K (after completion of work). Installation of PVC windows, hinged facade, roof (in the process of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742101472961
Unscheduled inspection
Start date: 2021-12-22, end date: 2022-01-26, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101436491
Unscheduled inspection
Start date: 2021-12-14, end date: 2021-12-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the PIC inspection work, excavation installation (in the process of work), foundation installation (in the process of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, on which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742101357350
Unscheduled inspection
Start date: 2021-11-26, end date: 2021-12-23, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101380331
Unscheduled inspection
Start date: 2021-11-26, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742101357242
Unscheduled inspection
Start date: 2021-11-24, end date: 2021-12-21, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101226746
Unscheduled inspection
Start date: 2021-10-26, end date: 2021-11-10, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the construction of structures of the 1st floor (completed stage), the construction of structures of the 2nd floor (in the process of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code, the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (except for capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742101186151
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration:
Authority:
Purpose of inspection:


# 742101176658
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 742100771320
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100771322
Unscheduled inspection
Start date: 2021-09-24, end date: —, duration:
Authority:
Purpose of inspection:


# 742100549295
Unscheduled inspection
Start date: 2021-09-03, end date: 2021-09-16, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the construction of the basement structures (completed stage), the construction of the first floor structures (in the process of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100451620
Unscheduled inspection
Start date: 2021-08-16, end date: 2021-09-10, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100492976
Unscheduled inspection
Start date: 2021-08-27, end date: 2021-09-09, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the performance of landscaping works: construction of driveways, sidewalks, platforms, verandas, installation of small architectural forms, landscaping of sites (after completion of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of the article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (except for with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100455064
Unscheduled inspection
Start date: 2021-08-24, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100345619
Unscheduled inspection
Start date: 2021-07-14, end date: 2021-07-27, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on External networks and structures of water supply, sanitation, heat supply and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100372306
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration:
Authority:
Purpose of inspection:


# 742100345923
Unscheduled inspection
Start date: 2021-07-20, end date: 2021-07-26, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, excavation (completed stage), foundation (completed stage) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (with taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100258111
Unscheduled inspection
Start date: 2021-06-09, end date: 2021-06-16, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the masonry work, the construction of the building's box (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100276904
Unscheduled inspection
Start date: 2021-06-24, end date: —, duration:
Authority:
Purpose of inspection:


# 742100291647
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100207508
Unscheduled inspection
Start date: 2021-05-19, end date: 2021-05-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of floor slabs on the 1st floor, the installation of walls on the 2nd floor, the installation of floor slabs on the 2nd floor, the installation of walls on the 3rd floor, the installation of floor slabs on the 3rd floor, the roofing, the filling of window openings and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code, the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100194466
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-05-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100210343
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-05-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of enclosing structures, installation of internal engineering systems, decoration of premises (during the work) in the axes "1-43, A-R" and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100145540
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of foundations (after completion of work); the arrangement of the building's box (during work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (with taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100151708
Unscheduled inspection
Start date: 2021-04-29, end date: 2021-05-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the Installation of supporting structures of the basement, first floor (external and internal walls, ceilings), partitions in /o 1-7/A-K and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100046063
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of the building frame, installation of enclosing structures, floor slabs, brickwork of walls and partitions, roofing, installation of internal engineering systems (during work) in the axes "1-43, A-R" and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100092208
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the performance of work on the compliance with the performance of work on the organization of the construction site, excavation (after completion of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100079448
Unscheduled inspection
Start date: 2021-03-23, end date: 2021-03-29, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a monolithic belt, the installation of basement floor slabs, the installation of walls of the 1st floor and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742105312959
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-01-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, excavation, installation of foundations and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742105299511
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, preparatory work, excavation development (completed stage) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742105314925
Unscheduled inspection
Start date: 2021-01-26, end date: 2021-02-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742105314825
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 742005255612
Unscheduled inspection
Start date: 2020-12-07, end date: 2021-01-11, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on compliance with fire and sanitary epidemiological measures measures to ensure access to low mobility groups of the population and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 of Articles 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources Landscaping and installation small architectural forms After completion of work 2 Inspection of the completed construction site 3 Availability of a building permit 4 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 742005227258
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-18, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005237138
Unscheduled inspection
Start date: 2020-11-24, end date: —, duration:
Authority:
Purpose of inspection:


# 742005177841
Unscheduled inspection
Start date: 2020-10-20, end date: 2020-11-17, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004495479
Unscheduled inspection
Start date: 2020-08-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004489841
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration:
Authority:
Purpose of inspection:


# 742004477732
Unscheduled inspection
Start date: 2020-08-20, end date: —, duration:
Authority:
Purpose of inspection:


# 742004477752
Unscheduled inspection
Start date: 2020-08-11, end date: 2020-08-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of internal engineering networks completed stage of work installation of external engineering networks completed stage of work installation of finishing works completed stage of work installation of the facade of the building completed stage of work compliance with measures to ensure access for low mobility groups of the population compliance with measures to ensure fire safety compliance with measures for sanitary and epidemiological safety landscaping and applied building materials during the construction and reconstruction of the facility capital construction as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code. The Code, including the requirements for energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004500587
Unscheduled inspection
Start date: 2020-08-31, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004462507
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-08-21, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed capital construction facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004445473
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 742004437873
Unscheduled inspection
Start date: 2020-07-02, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004456763
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-07-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the installation of translucent structures with the completed stage of work, the arrangement of finishing works during the production process and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in paragraphs 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004452020
Unscheduled inspection
Start date: 2020-07-16, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004412040
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The completed stage of the installation of structures on the 1st floor, the completed stage of the installation of structures on the 2nd floor, the completed stage of the installation of structures on the 3rd floor during the construction process, the installation of partitions on the 1st floor, the completed stage and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of this Code. The Code of Project Documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004412050
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures on the 1st floor completed stage of the installation of structures on the 2nd floor completed stage of the installation of structures on the 3rd floor during the construction of partitions on the 1st floor completed stage and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code and project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply. and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004417487
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the masonry of the internal exterior walls and floor slabs of the 1st floor with the masonry of the internal exterior walls and floor slabs of the 2nd floor with the masonry of the internal exterior walls and floor slabs of the 3rd floor after completion of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of facilities capital construction projects that are not covered by energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004417470
Unscheduled inspection
Start date: 2020-05-28, end date: 2020-06-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures on the second floor, floors above the second floor, the installation of staircases and slabs of descents and porches, the roof after completion, the windows, doors, interior decoration, the facade during the work and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004417309
Unscheduled inspection
Start date: 2020-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 742004410918
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-05-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation work the final stage is the installation of the facade of the building during the installation of translucent structures during the construction process and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004397170
Unscheduled inspection
Start date: 2020-04-27, end date: —, duration:
Authority:
Purpose of inspection:


# 742004311566
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of the ground floor of the ceiling above the ground floor The installation of structures of the first floor of the ceiling above the first floor After completion of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices energy resources used 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004377280
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the masonry work on the interior exterior walls and floor slabs of the 1st floor after completion of the work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for building3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004336510
Unscheduled inspection
Start date: 2020-03-17, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004343021
Unscheduled inspection
Start date: 2020-03-12, end date: —, duration:
Authority:
Purpose of inspection:


# 742004343107
Unscheduled inspection
Start date: 2020-03-20, end date: 2020-03-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the foundation construction work completed stage to the installation of basement structures completed stage to the installation of 1st floor structures during the production process and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resource2 The availability of a building permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004306373
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004290037
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration:
Authority:
Purpose of inspection:


# 742004209236
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004144397
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 742004227094
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the excavation work, the installation of the FL and FBS blocks After completion of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004209209
Unscheduled inspection
Start date: 2020-01-31, end date: —, duration:
Authority:
Purpose of inspection:


# 741904124898
Unscheduled inspection
Start date: 2019-12-25, end date: 2019-12-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the excavation work, the completed stage of the foundation construction during the construction process, the work of the PIC and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in paragraphs 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for building3 Meeting the requirements of hr 23 and 31st52 of the Urban Planning Code of the Russian Federation


# 741904035958
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the bricklaying of the walls of the 23rd floor, the installation of floors above the 2nd floor after completion of the work, the installation of the roof facade, internal plumbing works, landscaping during the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code. The Code of Project Documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects to which energy efficiency requirements do not apply and requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904068428
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on interior decoration after completion of work installation of internal engineering systems after completion of work verification of compliance with fire and sanitary epidemiological measures measures to ensure access to low mobility groups of the population Landscaping and installation of small architectural forms After completion of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the approved in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities that are not covered by energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Verification of a completed construction object3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904066711
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the fulfillment of sanitary and epidemiological requirements for fire protection of the building, measures to ensure access for low-mobility groups of the population and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 of Articles 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used.2 Verification of the completed construction facility.3 Availability of a building permit 4 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904043444
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal engineering networks the completed stage of work with the installation of external engineering networks the completed stage of work with the installation of finishing works the completed stage of work with the installation of the facade of the building the completed stage of work with measures to ensure access for low-mobility groups of the population with measures to ensure fire safety measures for sanitary and epidemiological safety measures for landscaping and the construction materials used during construction and reconstruction the capital construction facility as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements this Code, including the requirements for energy efficiency, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources.2 Verification of a completed construction facility.3 Availability of a construction permit.4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904043498
Unscheduled inspection
Start date: 2019-12-11, end date: 2020-01-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal engineering systems for interior decoration, the completed stage of fire prevention measures, sanitary and epidemiological requirements, landscaping and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 Inspection of the completed building3 Availability of a construction permit4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904063437
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the construction of the sports hall in axes 29AB completed stage and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Meeting the requirements of HH Articles 23 and 31 of the Urban Planning Code of the Russian Federation


# 741903966168
Unscheduled inspection
Start date: 2019-11-21, end date: 2019-11-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903966018
Unscheduled inspection
Start date: 2019-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741903913057
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal engineering networks during the work process roof installation is the completed stage installation of translucent structures and building materials used during the construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The presence of building permits 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903939545
Unscheduled inspection
Start date: 2019-11-14, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903698603
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 741903700474
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-10-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of finishing works in the course of work installation of the roof is the completed stage installation of the facade of the building in the course of work and the construction materials used in the course of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903731411
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation of internal engineering systems for interior decoration and facade and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 The implementation of requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903896564
Unscheduled inspection
Start date: 2019-10-31, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903834312
Unscheduled inspection
Start date: 2019-10-11, end date: 2019-10-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of technological equipment for finishing work, and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903197522
Unscheduled inspection
Start date: 2019-09-10, end date: —, duration:
Authority:
Purpose of inspection:


# 741903631672
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering systems landscaping of driveways sidewalks platforms verandas installation of small architectural forms landscaping of sites after completion of work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903533384
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of structures of the 1st floor in the axes of 19 AG completed stage of the construction of structures of the 2nd floor in the axes of 19 AG during the production process and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741902954901
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-08-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the 2nd floor structures, the completed stage and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902900382
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-08-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation work, filling of window and door openings before finishing the slopes, thermal insulation and finishing of facade surfaces, vertical layout of the territory after completion and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902960550
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 741902978642
Unscheduled inspection
Start date: 2019-08-22, end date: —, duration:
Authority:
Purpose of inspection:


# 741902913578
Unscheduled inspection
Start date: 2019-08-07, end date: —, duration:
Authority:
Purpose of inspection:


# 741902843039
Unscheduled inspection
Start date: 2019-07-16, end date: 2019-07-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of building structures on the 3rd floor of brickwork walls and partitions after the installation of coating plates before sealing joints and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902873690
Unscheduled inspection
Start date: 2019-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 741902886792
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the decoration of the facade of the building for the installation of technological equipment compliance with measures to ensure access to low-mobility groups of the population for fire safety compliance with sanitary and epidemiological safety measures for landscaping and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation2 The completed construction of the facility 3 The availability of a construction permit 4 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902875362
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the 1st floor structures of the completed stage and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902843038
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility upon notification of the start of construction 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902839873
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of translucent structures with the completed stage of work, the installation of finishing works during the installation of internal engineering networks, the completed stage of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code Russian Federation


# 741902817185
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741902816587
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741902716658
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the device of rigid diaphragms J5 from otm +29000 to +37800 J6 on otm +31230 to the device of monolithic beams on otm +33550 ceramic concrete walls from otm +23050 to otm +28200 to the device of columns and expanded clay concrete walls from otm +29000 to otm +37800 and the construction materials used during the construction of the capital construction facility as well as the results of such work, project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902716978
Unscheduled inspection
Start date: 2019-05-21, end date: —, duration:
Authority:
Purpose of inspection:


# 741902720176
Unscheduled inspection
Start date: 2019-05-22, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902716786
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration:
Authority:
Purpose of inspection:


# 741902724901
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-05-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work completed stage with the foundation structures during the construction process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741902740324
Unscheduled inspection
Start date: 2019-05-28, end date: 2019-06-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the construction of the building frame below the 0000 mark of block II upon completion of the construction of the building frame above the 0000 mark of I II III blocks during the production process and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 741902649253
Unscheduled inspection
Start date: 2019-04-19, end date: 2019-04-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of basement floor structures, waterproofing works before backfilling the foundation sinuses and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741902649337
Unscheduled inspection
Start date: 2019-04-18, end date: —, duration:
Authority:
Purpose of inspection:


# 741902646392
Unscheduled inspection
Start date: 2019-04-18, end date: 2019-04-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations on axes 125AH and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902645928
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration:
Authority:
Purpose of inspection:


# 741902607227
Unscheduled inspection
Start date: 2019-04-02, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902658869
Unscheduled inspection
Start date: 2019-04-25, end date: —, duration:
Authority:
Purpose of inspection:


# 741902576967
Unscheduled inspection
Start date: 2019-03-21, end date: —, duration:
Authority:
Purpose of inspection:


# 741902573185
Unscheduled inspection
Start date: 2019-03-21, end date: —, duration:
Authority:
Purpose of inspection:


# 741902583604
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-03-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the roof installation work with the completed stage of the installation of internal engineering systems during the installation of external engineering networks, the completed stage of the installation of translucent structures during the construction process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation 2 The availability of a construction permit 3 The implementation of requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902583684
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-04-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the laying of low-current linear networks, the decoration of premises, the fulfillment of fire safety requirements and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902529104
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work completed stage with the foundation structures during the construction process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741902477210
Unscheduled inspection
Start date: 2019-02-06, end date: —, duration:
Authority:
Purpose of inspection:


# 741902451301
Unscheduled inspection
Start date: 2019-02-06, end date: 2019-02-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the organization of the construction site, the foundation pit, the work on driving piles and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902469073
Unscheduled inspection
Start date: 2019-01-31, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902429071
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 741902443901
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 741902458562
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741802331991
Unscheduled inspection
Start date: 2018-12-26, end date: 2019-01-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the installation of monolithic structures of external and internal walls, columns, arches, sails and floors at hm +19700 to hm +23050 of the work in progress and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802332063
Unscheduled inspection
Start date: 2018-12-26, end date: 2019-01-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation in the 120AR axes with the brickwork of the exterior and interior walls, the installation of entrance groups, the installation of windows and translucent structures and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802218330
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed in the installation of internal engineering systems for heating cold and hot water supply, drainage, finishing works, landscaping of the site, driveways, sidewalks, verandas, installation of small architectural forms and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802130597
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-11-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of load-bearing structures of the 3rd floor columns beams walls floors staircases and platforms the installation of outdoor water supply networks and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802144802
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741802063131
Unscheduled inspection
Start date: 2018-11-09, end date: 2018-11-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the foundation construction in axes 52122 row ED2 in the course of work installation of columns and blocks of FBS in axes 1141 row M1X1 73103 row A3T3 1373 row A3T3 in the course of work and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations project documentation 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802078281
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 741801801459
Unscheduled inspection
Start date: 2018-10-08, end date: —, duration:
Authority:
Purpose of inspection:


# 741801980251
Unscheduled inspection
Start date: 2018-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 741802063126
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the excavation and foundation installation in axes 73103A3T3 with the completion of work, checking the excavation and foundation in axes 1343A3T3 1141A1X112162J1M2 during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741801542196
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the excavation and foundation installation in axes 73103A3T3 with the completion of work, checking the excavation and foundation in axes 1343A3T3 1141A1X112162J1M2 during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741801520088
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration:
Authority:
Purpose of inspection:


# 741800974749
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the construction of the supporting structures of the 2nd floor columns beams walls floors staircases and platforms and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800974358
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the 3rd floor building structures with the brickwork of walls and partitions and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800612659
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of work performed during the installation of building structures on the 2nd floor of brickwork walls and partitions, as well as the construction materials used during the construction of a capital construction facility, the results of such work with the requirements of technical regulations and project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800674268
Unscheduled inspection
Start date: 2018-08-29, end date: 2018-09-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic structures of external and internal walls, columns, arches, sails and floors on otm+ 14880 to otm +22480 for the installation of metal structures on otm+17300 with the work in progress and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of permits for construction 3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800573138
Unscheduled inspection
Start date: 2018-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 741800525811
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-07-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the construction of the supporting structures of the 1st floor columns beams walls floors staircases and platforms and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800521945
Unscheduled inspection
Start date: 2018-07-10, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800525849
Unscheduled inspection
Start date: 2018-07-11, end date: 2018-07-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of basement floor structures waterproofing work laying of external engineering networks and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800565475
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 741800571972
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration:
Authority:
Purpose of inspection:


# 741800452014
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-06-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of a monolithic reinforced concrete grillwork and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800440143
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the facade finishing works, the interior finishing works and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800452026
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the foundations of the building frame, walls and floors below the zero mark and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800484617
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic structures of external and internal walls, columns, arches, sails and floors on otm+ 14880 to otm +22480 of the work in progress and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800367103
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the fulfillment of the prescription from 05022018 with a deadline of 30032018 extended until 01052018 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800337465
Unscheduled inspection
Start date: 2018-05-31, end date: 2018-06-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the organization of the construction site, the construction of the excavation, the work on driving piles and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800273580
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of internal engineering networks and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800303671
Unscheduled inspection
Start date: 2018-04-28, end date: 2018-05-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of a monolithic grillwork pile field, the laying of external sewer networks, linear drainage networks and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800181928
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration:
Authority:
Purpose of inspection:


# 741800010840
Unscheduled inspection
Start date: 2018-01-30, end date: —, duration:
Authority:
Purpose of inspection:


# 00170803028749
Unscheduled inspection
Start date: 2017-12-27, end date: 2017-12-27, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to issue a permit for the commissioning of thermal power plants and heating networks on the basis of an application from the director of MCU "Chelyabstroyzakazchik" ex 1145 dated 11122017 ex H17601 dated 11122017


# 74170802936964
Unscheduled inspection
Start date: 2017-12-13, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170802741332
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of monolithic reinforced concrete columns from m + 15050 to m + 19200 in the axes "314" expanded clay walls in the axes "218" to m +19200 stiffening diaphragms in the axes "516" to m +18200 monolithic beams from m +15050 to m + 17300 in the axes "318" installation of arches the sails in the axes "314" "ZHU" work in progress and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of HH 23 and 31 ST52 of the Urban Planning Code of the Russian Federation


# 74170801960889
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of monolithic vaults on OTM +8690 during the execution and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701798583
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-07-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of monolithic frame columns from m +15050 to m +19200 expanded clay walls from m +15050 to m +19200 stiffening diaphragms from m +1850 to m +19200 monolithic beams from m +19700 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations project documentation2the receipt of a construction permit3compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701779458
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-07-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the landscaping of the adjacent territory during the implementation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701839376
Unscheduled inspection
Start date: 2017-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701760419
Unscheduled inspection
Start date: 2017-07-04, end date: 2017-07-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701707503
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the installation of monolithic frame columns from otm +4250 to otm +15050 during the construction of monolithic beams from otm +8690 to otm +15050 during the construction of expanded clay walls from otm + 11850 to otm + 15050 during the construction and the construction materials used during the construction of a capital construction facility, as well as the results of such requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701611336
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the laying of internal engineering systems and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701600627
Unscheduled inspection
Start date: 2017-05-12, end date: 2017-05-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Check n 1 regulations from 04042017 g2 Availability of a building permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701629943
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-06-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701623231
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-05-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completion of work on the installation of ventilation systems, the completion of electrical installation, the completion of finishing work, the completion of work to ensure fire and sanitary and epidemiological requirements, accessibility requirements for low-mobility groups of the population and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations for project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701627254
Unscheduled inspection
Start date: 2017-05-22, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701528786
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of structures from the 6th to the 10th floors in axes 14A, installation of structures of the technical floor and roofing in axes 12J, filling of window openings and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701514274
Unscheduled inspection
Start date: 2017-04-07, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701512997
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of structures from the 2nd to the 5th floors in axes 14A, the installation of structures from the 7th to the 10th floors in axes 12J and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701567206
Unscheduled inspection
Start date: 2017-04-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701567205
Unscheduled inspection
Start date: 2017-04-28, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701485761
Unscheduled inspection
Start date: 2017-03-29, end date: 2017-04-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels of floor slabs of 810 floors of the structures of the technical floor of the parapet before the start of work on the waterproofing of the roof and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701391282
Unscheduled inspection
Start date: 2017-02-17, end date: 2017-02-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of ground floor structures in the 12GB axes, the installation of structures from the 2nd to the 4th floors in the 12J axes and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701397715
Unscheduled inspection
Start date: 2017-02-21, end date: 2017-03-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of the basement floor in axes 14A, the installation of structures from the 4th to the 6th floors in axes 12J, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701380592
Unscheduled inspection
Start date: 2017-02-21, end date: 2017-03-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of ventilation systems during the installation of screeds for clean floors, the completion of plastering work, the completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701278218
Unscheduled inspection
Start date: 2017-01-12, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701276531
Unscheduled inspection
Start date: 2017-01-10, end date: 2017-01-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of electrical installation work during the execution of finishing work during the execution and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701314245
Unscheduled inspection
Start date: 2017-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701211100
Unscheduled inspection
Start date: 2016-12-12, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701204377
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of the pile field of the monolithic grillwork in axes 12 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701115070
Unscheduled inspection
Start date: 2016-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701017232
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-10-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the monolithic reinforced concrete frame of the 2nd floor, columns, beams, stiffness diaphragm and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700958348
Unscheduled inspection
Start date: 2016-10-06, end date: 2016-10-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of the reservoir drainage pit and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701037113
Unscheduled inspection
Start date: 2016-10-26, end date: 2016-11-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completion of work on the installation of a plaster facade with insulation, the completion of work on the installation of translucent structures, the completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of the technical regulations of the project documentation2the receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701025958
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-11-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700068977
Unscheduled inspection
Start date: 2016-09-02, end date: 2016-09-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601730227
Unscheduled inspection
Start date: 2016-08-02, end date: 2016-08-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of a monolithic reinforced concrete floor slab of the 1st floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601702141
Unscheduled inspection
Start date: 2016-07-14, end date: 2016-07-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic reinforced concrete slabs of the 1st floor monolithic reinforced concrete columns of the 2nd floor masonry exterior and interior walls of the 2nd floor monolithic reinforced concrete slabs of the 2nd floor in the process of installation of metal structures of farms in the process of the administrative block monolithic reinforced concrete slabs of the 2nd floor masonry exterior and interior walls of the 3rd floor monolithic reinforced concrete slabs overlappings of the 3rd floor of the educational blocks of the masonry of the outer and inner walls of the 4th floor during the execution of the educational block 1 of the masonry of the outer and inner walls of the technical floor during the execution of the educational block 1 and the building materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 The implementation of requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.