Found 10 inspections:

# 611800521525
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-20, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: in order to implement the p11 inspection program, Section 3 wiring of internal engineering communications for water supply, sewerage, heating, electricity, gas supply, installation of equipment, finishing works, section 4 wiring of internal engineering communications for water supply, sewerage, heating, electricity, gas supply, installation of equipment, finishing works, landscaping, the objectives of this inspection are to prevent, identify, and prevent violations committed by the developer, the customer, and the person carrying out construction based on a contract with the developer or customer Further, the contractor violates the legislation on urban planning activities, including technical regulations and project documentation. The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts


# 611800582726
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-07-26, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: implementation of the p12 inspection program verification of the completed facility prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and project documentation, by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, compliance with the regulations of state control bodies, supervision bodies of municipal control


# 611800338477
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-25, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: execution of the p10 inspection program 3 section roof covering installation of internal engineering communications for water supply, sewerage, heating, electricity, gas supply installation of equipment finishing works 4 section installation of a rafter system and roof covering installation of internal engineering communications for water supply, sewerage, heating, electricity, gas supply installation of equipment finishing works Landscaping prevention identification and suppression of violations committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with by the developer or the customer hereinafter referred to as the contractor violations of the legislation on urban development activities including technical regulations and project documentation compliance with mandatory requirements and or requirements established by municipal legal acts


# 611800089119
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-16, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: in order to implement the p9 inspection program, section 3 is the overlap of the 4th floor, the construction of load-bearing and enclosing structures on the 5th floor, the installation of internal walls and partitions on the 45th floor, the construction of attic gables and vent channels, the installation of a roof rafter system, the installation of window and balcony door blocks, section 4 is the construction of load-bearing and enclosing structures on the 45th floor, the construction of attic gables and vent channels, the installation of window and balcony doors The main objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is to verify compliance with mandatory requirements and or requirements established by municipal legal acts


# 611800180977
Unscheduled inspection
Start date: 2018-03-27, end date: —, duration:
Authority:
Purpose of inspection:


# 61170803037453
Unscheduled inspection
Start date: 2017-12-28, end date: 2017-12-29, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: p9 of the inspection program Verification of an object completed by construction prevention detection and suppression of violations of legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, and compliance with mandatory requirements and or requirements established by municipal legal acts


# 61170802823861
Unscheduled inspection
Start date: 2017-11-09, end date: 2017-11-17, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This audit is conducted in order to comply with n 3410400667 of the audit program in case 8The objectives of this audit are to prevent identify and suppress violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 61170802299678
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-22, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This audit is conducted in order to comply with clause 7 of the audit program in case 3410400667the objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 61170701473212
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-03-29, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: This audit is conducted in order to fulfill the p1 program of inspections in case 3410400667the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts. acts


# 61160701060172
Unscheduled inspection
Start date: 2016-11-21, end date: —, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.