# 002004212380
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-27, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 15032019 T317, the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to verify the compliance of the work and the construction materials used in the process. construction of the capital construction facility "Development of the Peaceful NGKM Bushes of wells 246 Stage 2" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or information models in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 Article 52 of the Urban Planning Code of the Russian Federation
# 002004166068
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902779576
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 12022019g8 T369THE objectives of this inspection are to prevent identify and suppress violations of legislation on urban planning activities and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor
# 001902779588
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902742331
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902566657
Unscheduled inspection
Start date: 2019-03-26, end date: —, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902461096
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-03-11, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 15112018 T365. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor
# 001800575008
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to control the execution of the instruction on the elimination of identified offenses, the deadline for which has expired, the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 00170701853485
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer and the technical customer
# 00170701853472
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer and the technical customer
# 00170701426634
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation
# 422000177861
Unscheduled inspection
Start date: 2021-04-29, end date: 2020-06-22, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. To establish that this inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor dated 12/14/2020 No. 336.
The purpose of this inspection is to prevent, identify and suppress violations of the legislation on urban development committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer, project documentation.
7. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Terminal for the storage and shipment of a propane – butane technical (SPBT) mixture in the Kuibyshev area", as well as the results of such work with the requirements approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation (taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including the requirements of the energy efficiency (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 422000177806
Unscheduled inspection
Start date: 2021-04-29, end date: 2020-06-22, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. To establish that this inspection is carried out in order to monitor the implementation of the instruction of the Siberian Directorate of Rostechnadzor dated 02.10.2020 With-25-20-209 on the elimination of identified offenses, the deadline for which has expired.
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor).
7. The subject of this audit is: compliance with the regulations of the federal state construction supervision authorities.
# 002004414402
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted for the purpose of execution of the Program inspections approved by the Deputy head of the Siberian Department of Rostechnadzor DV Kolejowym from 14052020 g 446Задачей of this review is to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer of violations of the legislation on town-planning project документации7 the Subject of this test is to verify compliance of work and construction materials used in the construction process of capital construction object "Step 4 Reconstruction of the main gas pipeline "Omsknovosibirsk" diameter 1220mm km 3347 at the intersection with highway design category IIIB to the object "Terminal for storage and shipment of a mixture of propanebutane technical LPG in the region g Kuibyshev" as well as the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 3_8 and 3_9 article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of the town planning code of the Russian Federation
# 002004414387
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor DV Kolegov dated 02/122019.336the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer of project documentation7the subject of this inspection is to verify the compliance of the work performed and the applied construction materials during the construction of the capital construction facility "Terminal for the storage and shipment of propanabutane technical SPBT mixture in the Kuibyshev area" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used. construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004212380
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-27, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 15032019 T317, the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to verify the compliance of the work and the construction materials used in the process. construction of the capital construction facility "Development of the Peaceful NGKM Bushes of wells 246 Stage 2" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or information models in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 Article 52 of the Urban Planning Code of the Russian Federation
# 002004166068
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-21, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor DV Kolegov dated 02/122019 336the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the subject of this inspection is to verify the compliance of the work and the applied construction materials during the construction of the capital construction facility "Terminal for the storage and shipment of propanabutane technical SPBT mixture in the Kuibyshev area" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of the Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources and the availability of a construction permit meeting the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902779576
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 12022019g8 T369THE objectives of this inspection are to prevent identify and suppress violations of legislation on urban planning activities and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor
# 701903763637
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-02, duration: —
Authority: Sibirskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: verification of information about the license applicant contained in the accepted application dated 27092019 70805 for granting a license and documents with information contained in the Unified State Register of Legal Entities and other Federal Information Resourcesthe objectives of this audit are for the licensee to comply with the licensing requirements established by current legislation when carrying out activities for the transportation of passengers and other persons by buses
# 001902779588
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 14022019g8 T375THE objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor
# 001902742331
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-16, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to monitor the implementation of Regulation T251937 of 25032019 on the elimination of identified offenses, the deadline for which expires. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor
# 001902566657
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-04-22, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Kolegov DV dated 23042018 T361. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor
# 001902461096
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-03-11, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 15112018 T365. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor
# 001902527550
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-25, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development and project documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor
# 701802426574
Unscheduled inspection
Start date: 2018-12-26, end date: 2018-12-26, duration: —
Authority: Gosudarstvennaya inspekciya truda v Tomskoi oblasti
Purpose of inspection: Compliance with labor legislation and verification of compliance with the instructions of the state control and supervision authorities
# 701801974956
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-11-19, duration: —
Authority: Departament prirodnyh resursov i ohrany okruzhayuschei sredy Tomskoi oblasti
Purpose of inspection: Purpose verification of the fulfillment of the previously issued regulation dated 14062018 114 on the elimination of identified violations of mandatory requirements inspection act dated 14062018 138 Objectives the objectives of this audit are to verify the implementation of the legislation of the Russian Federation and the Tomsk region in the field of environmental protection compliance with the requirements of current legislation regulations and other regulatory documents in the field of environmental protection ensuring environmental safety Subject to compliance with the regulations of state bodies Control supervision
# 701801479340
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-10-18, duration: —
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection: Purpose prevention and detection and suppression of violations of urban planning legislation during an unscheduled on-site inspection based on the Inspection Program 9117PP2 dated 25042018 Task prevention and detection and suppression of violations of urban planning legislation Subject to compliance with mandatory requirements or requirements established by municipal legal acts of compliance with the performance of works and applied building materials during the construction reconstruction of the capital construction facility as well as the results of such works are required by the technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001800575014
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to control the execution of the instruction on the elimination of identified offenses, the deadline for which has expired, the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 001800575008
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to control the execution of the instruction on the elimination of identified offenses, the deadline for which has expired, the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 701800449394
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-07-10, duration: —
Authority: Departament prirodnyh resursov i ohrany okruzhayuschei sredy Tomskoi oblasti
Purpose of inspection: Purpose verification of compliance with the requirements of paragraphs 1 to 2 of the previously issued regulation No. 08092017 148 on the elimination of identified violations of mandatory requirements inspection act No. 08092017 177 Tasks verification of compliance with the legislation of the Russian Federation and the Tomsk region in the field of environmental protection compliance with the requirements of current legislation regulations and other regulatory documents in the field of environmental protection ensuring environmental safety Subject compliance with the regulations of state bodies Control supervision
# 001800263730
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-08, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor
# 001800263718
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-08, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor
# 70170802874696
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-12-15, duration: —
Authority: Departament prirodnyh resursov i ohrany okruzhayuschei sredy Tomskoi oblasti
Purpose of inspection: The audit is conducted in order to verify compliance with the requirements of the previously issued regulation No. 08092017 148 on the elimination of identified violations of mandatory requirements inspection act No. 08092017 177the objectives of the audit are to verify compliance with the legislation of the Russian Federation and the Tomsk Region in the field of environmental protection, compliance with the requirements of current legislation, regulations and other regulatory documents in the field of environmental protection, ensuring environmental safety. regulations of state control bodies, supervision of municipal control bodies
# 00170701853485
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer and the technical customer
# 00170701853472
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer and the technical customer
# 70170701727845
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-06-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v Tomskoi oblasti
Purpose of inspection: This audit is conducted in order to protect the rights and interests of employees in connection with the consideration of an application from 19052017 796217 On violation of labor rightsthe objectives of this audit are supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms.The purpose of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 00170701552296
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the inspection program approved by and about the Deputy Head of the Siberian Directorate of Rostechnadzor dated 04072016 229 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations committed by a person carrying out construction on the basis of a contract with a developer or a technical customer for violations of urban planning legislation, including the requirements of technical regulations and project documentation
# 00170701426634
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation