# 00160701108465
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-16, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Celyu proverki yavlyaetsya proverka vypolneniya OOO «Remput» punktov ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 18102016 CH4838 srok dlya ispolneniya kotoryh istekZadachami nastoyaschei proverki yavlyayutsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v punktah 14 predpisaniya ot 18102016 CH4838
# 00160601545074
Unscheduled inspection
Start date: 2016-03-28, end date: 2016-03-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka vypolneniya OOO «Remput» punktov 1 2 3 4 5 6 ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 21082015 CH1260 srok dlya ispolneniya kotoryh istek
# 742201533743
Unscheduled inspection
Start date: 2022-01-19, end date: 2022-01-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po otsypke osnovaniya pod zh/d tupik № 1, ustroistvu verhnego osnovaniya pod zh/d puti zheleznodorozhnogo tupika № 1 i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.
# 742101223953
Unscheduled inspection
Start date: 2021-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100771332
Unscheduled inspection
Start date: 2021-09-30, end date: 2021-10-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the construction of railway tracks and stations 3,4 stage: installation of trans-shipment railway tracks of station No. 14.15, railway exits, lane R65 M1/7 - 6 pcs., installation of a cul-de-sac No. 2, lane R65 M1/7 - 1 pc. Contact network: the grounding of supports and building materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, to the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100492441
Unscheduled inspection
Start date: 2021-08-26, end date: 2021-09-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the contact network: installation of rigid crossbars, reinforcement of supports with consoles, reinforcement of the bolt with a fixing cable and triangular suspensions, electrical centralization: preparation of the cable route, laying of the floor cable, installation of the cable network and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code, the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100301173
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005212200
Unscheduled inspection
Start date: 2020-11-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004354401
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-04-09, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: federal supervision
# 741801435321
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-29, duration: —
Authority: Ministerstvo ekologii CHelyabinskoi oblasti
Purpose of inspection: Purpose control over the implementation of previously issued regulations of the state control supervision body Tasks carrying out measures to monitor the implementation of previously issued regulations by the state control supervision body, the deadline for which has expired Subject to the implementation of the regulations of the state control supervision body
# 741800095685
Unscheduled inspection
Start date: 2018-03-06, end date: 2018-04-04, duration: —
Authority: Ministerstvo ekologii CHelyabinskoi oblasti
Purpose of inspection: Purpose control over the implementation of previously issued regulations of the state control supervision body Tasks carrying out measures to monitor the implementation of previously issued regulations by the state control supervision body, the deadline for which has expired Subject to the implementation of the regulations of the state control supervision body
# 00160701108465
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-16, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Celyu proverki yavlyaetsya proverka vypolneniya OOO «Remput» punktov ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 18102016 CH4838 srok dlya ispolneniya kotoryh istekZadachami nastoyaschei proverki yavlyayutsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v punktah 14 predpisaniya ot 18102016 CH4838
# 00160601545074
Unscheduled inspection
Start date: 2016-03-28, end date: 2016-03-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka vypolneniya OOO «Remput» punktov 1 2 3 4 5 6 ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 21082015 CH1260 srok dlya ispolneniya kotoryh istek