Found 174 inspections:

# 001800226313
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-26, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki faktov izlozhennyh v izveschenii ob ustranenii narushenii ot 14032018 P001493483868611614366


# 001800008668
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-01-19, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolneniya predpisaniya 0342071300509 ot 08122017 srokom ispolneniya do 15012018


# 772101423362
Unscheduled inspection
Start date: 2021-12-08, end date: 2021-12-21, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101514815
Unscheduled inspection
Start date: 2021-12-27, end date: 2021-12-29, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 102101420419
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772101493389
Unscheduled inspection
Start date: 2021-12-22, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772101392759
Unscheduled inspection
Start date: 2021-12-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772101288406
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration:
Authority:
Purpose of inspection:


# 772101291530
Unscheduled inspection
Start date: 2021-11-05, end date: 2021-11-30, duration: 17
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772101253538
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772101259039
Unscheduled inspection
Start date: 2021-11-01, end date: 2021-11-26, duration: 18
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772101287331
Unscheduled inspection
Start date: 2021-11-01, end date: 2021-11-24, duration: 16
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772101201117
Unscheduled inspection
Start date: 2021-10-13, end date: 2021-10-26, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772101161503
Unscheduled inspection
Start date: 2021-10-11, end date: 2021-10-14, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101195523
Unscheduled inspection
Start date: 2021-10-12, end date: 2021-10-29, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772101254714
Unscheduled inspection
Start date: 2021-10-26, end date: 2021-11-10, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100729001
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772101163689
Unscheduled inspection
Start date: 2021-10-19, end date: —, duration:
Authority:
Purpose of inspection:


# 772101223256
Unscheduled inspection
Start date: 2021-10-18, end date: 2021-10-25, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100634041
Unscheduled inspection
Start date: 2021-09-08, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100608165
Unscheduled inspection
Start date: 2021-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772100575227
Unscheduled inspection
Start date: 2021-09-03, end date: 2021-09-23, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100454631
Unscheduled inspection
Start date: 2021-09-01, end date: 2021-09-24, duration: 18
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100447271
Unscheduled inspection
Start date: 2021-08-18, end date: 2021-08-24, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100424530
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 772100363849
Unscheduled inspection
Start date: 2021-08-06, end date: 2021-09-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100350969
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772100360509
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772100333551
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100340502
Unscheduled inspection
Start date: 2021-07-13, end date: 2021-07-19, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100399314
Unscheduled inspection
Start date: 2021-07-30, end date: —, duration:
Authority:
Purpose of inspection:


# 772100399316
Unscheduled inspection
Start date: 2021-07-30, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100331852
Unscheduled inspection
Start date: 2021-07-06, end date: 2021-07-08, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100365765
Unscheduled inspection
Start date: 2021-07-21, end date: 2021-07-26, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100308407
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772100273002
Unscheduled inspection
Start date: 2021-06-09, end date: 2021-06-18, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100312814
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-06-30, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100272097
Unscheduled inspection
Start date: 2021-06-08, end date: 2021-06-15, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100240351
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772100246847
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100246822
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772100191776
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-06-07, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100236068
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 772100230520
Unscheduled inspection
Start date: 2021-05-26, end date: 2021-05-28, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100165701
Unscheduled inspection
Start date: 2021-05-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772100229862
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100148163
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-05-14, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100182616
Unscheduled inspection
Start date: 2021-04-29, end date: 2021-04-30, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100175231
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-28, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100165670
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-28, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100066925
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-26, duration: 8
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100045535
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-03-25, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100010418
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-03-26, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100091365
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-06, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100035220
Unscheduled inspection
Start date: 2021-02-09, end date: —, duration:
Authority:
Purpose of inspection:


# 772100031703
Unscheduled inspection
Start date: 2021-02-09, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100026760
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-03-05, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100035170
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-03-05, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100035302
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-02-24, duration: 1
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100026765
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-02-24, duration: 1
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772105304086
Unscheduled inspection
Start date: 2021-01-19, end date: —, duration:
Authority:
Purpose of inspection:


# 772105291321
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 502005238501
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-18, duration: 3
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka provoditsya s celyu proverki ispolneniya predpisaniya ot 14102020 0213092600501 so srokom ispolneniya do 14122020 po izvescheniyu ob ustranenii P001769124004440349341 ot 11112020zadachami nastoyaschei proverki yavlyayutsya ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam proektnoi dokumentacii na obekte kapitalnogo stroitelstva «Mnogokvartirnyi zhiloi dom so vstroennymi pomescheniyami obschestvennogo naznacheniya i avtostoyankoi zakrytogo tipa korpus 18 19 20» po adresu Rossiiskaya Federaciya Moskovskaya obl Krasnogorskii rn g KrasnogorskPredmetom nastoyaschei proverki yavlyaetsya proverka ispolneniya predpisaniya ot 14102020 0213092600501 so srokom ispolneniya do 14122020 po izvescheniyu ob ustranenii P001769124004440349341 ot 11112020


# 772005226158
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-30, duration: 11
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772005214307
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772005180532
Unscheduled inspection
Start date: 2020-10-14, end date: 2020-11-11, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772004489972
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004432710
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 772004432699
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 502004456702
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-08-11, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: Osuschestvleniya federalnogo gosudarstvennogo nadzora za soblyudeniem rabotodatelyami trudovogo zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava osuschestvlyayuschimi deyatelnost v sfere stroitelstva gosudarstvennyh normativnyh trebovanii ohrany truda i nadlezhaschego oformleniya s rabotnikami trudovyh dogovorov ili zaklyucheniya grazhdanskopravovyh dogovorov Punkt 1 Porucheniya Zamestitelya predsedatelya Pravitelstva Rossiiskoi Federacii Golikovoi TA ot 27122019 g TGP1211486 poruchenie rukovoditelya Federalnoi sluzhby po trudu i zanyatosti Ivankova MYU ot 24012020 3p Prikaz Federalnoi sluzhby po trudu i zanyatosti ot 7 fevralya 2020 g 29 i izmenenii k nemu ot 5 iyunya 2020 g 122 ot 11 iyunya 2020 g 128Obespechenie soblyudeniya i zaschity trudovyh prav i svobod grazhdan vklyuchaya pravo na bezopasnye usloviya trudasoblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyhmunicipalnymi pravovymi aktami


# 772004441518
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-07-17, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 772004412907
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-06-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004273203
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration:
Authority:
Purpose of inspection:


# 772004387448
Unscheduled inspection
Start date: 2020-03-31, end date: —, duration:
Authority:
Purpose of inspection:


# 772004364694
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-03-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004357108
Unscheduled inspection
Start date: 2020-03-13, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004252116
Unscheduled inspection
Start date: 2020-01-30, end date: —, duration:
Authority:
Purpose of inspection:


# 772004172039
Unscheduled inspection
Start date: 2020-01-14, end date: —, duration:
Authority:
Purpose of inspection:


# 771904071092
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903946044
Unscheduled inspection
Start date: 2019-11-07, end date: 2019-11-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 771903882447
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 501903774953
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-31, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing norms of labor law registration number of function 5 in the Federal State Information System "Federal Register of State and Municipal Services"


# 771903820460
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771903653633
Unscheduled inspection
Start date: 2019-09-05, end date: 2019-09-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 77190803455002
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803437423
Unscheduled inspection
Start date: 2019-06-12, end date: 2019-06-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803444376
Unscheduled inspection
Start date: 2019-06-21, end date: 2019-07-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803405366
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-06-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803391794
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803400790
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction reconstruction of capital construction facilities established by the rules of land use and development documentation on the layout of the territory and mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code and other federal laws


# 501902574655
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-25, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Proverka ustraneniya narushenii izveschenie ob ustranenii narushenii P001056144040621316517 ot 14022019 v ramkah predpisaniya 0764139100502 ot 14012019 so srokom ispolneniya do 14032019 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva ZHiloi mikroraion EkoVidnoe2 1i etap korpus 1 s vnutriploschadochnymi setyami po adresu Moskovskaya oblast Leninskii raion vostochnee der Ermolino


# 77180803292109
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803283802
Unscheduled inspection
Start date: 2018-11-22, end date: 2018-11-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803285853
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-12-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803261850
Unscheduled inspection
Start date: 2018-10-24, end date: 2018-11-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803254024
Unscheduled inspection
Start date: 2018-10-16, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803233484
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803239971
Unscheduled inspection
Start date: 2018-09-27, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803198285
Unscheduled inspection
Start date: 2018-08-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803194604
Unscheduled inspection
Start date: 2018-08-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803189105
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803173535
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-07-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803184047
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-08-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803165035
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803168843
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803146725
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803117982
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-05-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803128000
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-04-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803114570
Unscheduled inspection
Start date: 2018-04-04, end date: 2018-04-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800226313
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-26, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverki faktov izlozhennyh v izveschenii ob ustranenii narushenii ot 14032018 P001493483868611614366


# 77180803112880
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803097325
Unscheduled inspection
Start date: 2018-03-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803097279
Unscheduled inspection
Start date: 2018-03-06, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803099443
Unscheduled inspection
Start date: 2018-03-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803090345
Unscheduled inspection
Start date: 2018-02-26, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803073708
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800008668
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-01-19, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolneniya predpisaniya 0342071300509 ot 08122017 srokom ispolneniya do 15012018


# 77180803066653
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803058381
Unscheduled inspection
Start date: 2018-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77170803030309
Unscheduled inspection
Start date: 2017-12-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802926667
Unscheduled inspection
Start date: 2017-11-29, end date: 2017-12-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802926716
Unscheduled inspection
Start date: 2017-11-29, end date: 2017-12-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802879552
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-11-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802827274
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170802861597
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802861594
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802692557
Unscheduled inspection
Start date: 2017-10-05, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802698696
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802698689
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170801965611
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802572042
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802572029
Unscheduled inspection
Start date: 2017-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802518792
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 50170701903631
Unscheduled inspection
Start date: 2017-08-18, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:


# 77170701881429
Unscheduled inspection
Start date: 2017-08-22, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701800071
Unscheduled inspection
Start date: 2017-07-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701799529
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701716785
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701703468
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701657636
Unscheduled inspection
Start date: 2017-06-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701695661
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701695659
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701611011
Unscheduled inspection
Start date: 2017-05-11, end date: 2017-05-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701611056
Unscheduled inspection
Start date: 2017-05-11, end date: 2017-05-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701545409
Unscheduled inspection
Start date: 2017-04-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701545725
Unscheduled inspection
Start date: 2017-04-18, end date: 2017-05-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 50170701466499
Unscheduled inspection
Start date: 2017-04-06, end date: 2017-04-10, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya ot 21022017 0342070100503


# 77170701560965
Unscheduled inspection
Start date: 2017-04-21, end date: 2017-04-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701426277
Unscheduled inspection
Start date: 2017-03-09, end date: 2017-03-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701425569
Unscheduled inspection
Start date: 2017-03-09, end date: —, duration:
Authority:
Purpose of inspection:


# 50170701370042
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-03-10, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: protection of the rights and interests of employees


# 77170701302293
Unscheduled inspection
Start date: 2017-01-10, end date: 2017-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701325717
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701317517
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 50160701278193
Unscheduled inspection
Start date: 2016-12-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701199264
Unscheduled inspection
Start date: 2016-12-02, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701199263
Unscheduled inspection
Start date: 2016-12-02, end date: 2016-12-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701258683
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701183133
Unscheduled inspection
Start date: 2016-11-29, end date: 2016-12-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160700993169
Unscheduled inspection
Start date: 2016-10-13, end date: 2016-11-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used


# 77160700992959
Unscheduled inspection
Start date: 2016-10-13, end date: 2016-11-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used


# 77160700995848
Unscheduled inspection
Start date: 2016-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701045750
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-10-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 916016 ot 09092016


# 77160700863373
Unscheduled inspection
Start date: 2016-09-27, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700914905
Unscheduled inspection
Start date: 2016-09-29, end date: 2016-10-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 901116 ot 26082016


# 77160700513933
Unscheduled inspection
Start date: 2016-09-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700458490
Unscheduled inspection
Start date: 2016-09-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700054168
Unscheduled inspection
Start date: 2016-08-24, end date: 2016-08-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo o nachale rabot pri osuschestvlenii kotoryh predusmotren gosudarstvennyi stroitelnyi nadzorZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 77160601770256
Unscheduled inspection
Start date: 2016-08-04, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160601774473
Unscheduled inspection
Start date: 2016-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700066425
Unscheduled inspection
Start date: 2016-08-29, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160700045576
Unscheduled inspection
Start date: 2016-08-19, end date: 2016-08-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 711716 ot 08072016


# 77160601705972
Unscheduled inspection
Start date: 2016-07-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77160601723538
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 573616 ot 15062016


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.