Found 25 inspections:

# 342101285074
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the customer's representative, TM-Stroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation. b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this review is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342100401134
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the customer's representative, TM-Stroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation. b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with mandatory requirements regarding: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342100146520
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-07, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: This inspection is carried out in accordance with the inspection program received by the customer's representative, TM-Stroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation. b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) meeting the requirements established by parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342005208566
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-11, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the verification program, the purpose of assessing the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code of Design Documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model if the formation of and the maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 342004480263
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-05, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Assessment of compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and project documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and requirements of project documentationthe subject of this audit is compliance with mandatory requirements in relation to the conformity of work performed and building materials used during construction reconstruction of the capital construction facility as well as the results of such work according to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, and for obtaining a construction permit, and meeting the requirements established by parts 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 342004409979
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342004260345
Unscheduled inspection
Start date: 2020-02-07, end date: 2020-02-11, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation. b The purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance with the performance of work and the applicable construction materials in the process of construction reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, hereinafter referred to as the Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources b availability of a construction permit c compliance with the requirements established by parts 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903929194
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-11-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a this inspection is carried out in accordance with the inspection program received by the customer's representative, TMStroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation. b the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with the mandatory requirements regarding the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code of Project Documentation, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by parts 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903929132
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-11-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a this inspection is carried out in accordance with the inspection program received by the customer's representative, TMStroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation. b the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with the mandatory requirements regarding the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code of Project Documentation, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by parts 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902907785
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a this inspection is carried out in accordance with the inspection program received by the customer's representative, TMStroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation. b the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. Documentation


# 341902633602
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a this inspection is carried out in accordance with the inspection program received by the customer's representative, TMStroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation. b the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. Documentation


# 341902494460
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a this inspection is carried out in accordance with the inspection program received by the customer's representative, TMStroy LLC, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation. b the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. Documentation


# 341802057586
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 341801923765
Unscheduled inspection
Start date: 2018-10-12, end date: 2018-10-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation. The purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The purpose of this audit is to comply with the mandatory requirements regarding a the compliance of construction works, their results and the construction materials used with the requirements of the project documentation b the availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170802736196
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 34170701897926
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe purpose of this audit is to comply with the instruction from 07072017 451 issued by Energotechnology LLC on the elimination of violations committed during construction the object


# 34170701765566
Unscheduled inspection
Start date: 2017-07-04, end date: 2017-07-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with the requirements technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34170701525583
Unscheduled inspection
Start date: 2017-04-07, end date: —, duration:
Authority:
Purpose of inspection:


# 34170701472380
Unscheduled inspection
Start date: 2017-03-24, end date: 2017-03-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with the requirements of technical regulations project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34170701397650
Unscheduled inspection
Start date: 2017-02-20, end date: 2017-02-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentationi the objective of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and project documentation The subject of this audit is compliance with mandatory requirements in relation to the conformity of construction works, their results and applied construction materials to the requirements of the technical regulations of the project documentation and the availability of a construction permit and the fulfillment of the established requirements for admission to construction work


# 34170701328029
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34160701096290
Unscheduled inspection
Start date: 2016-11-11, end date: 2016-11-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with the requirements technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34160700993503
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of urban planning legislation of the Russian Federation, including technical regulations and design documentationthe purpose of this audit is to comply with mandatory requirements regarding the compliance of construction works with their results and applied construction materials requirements of the technical regulations of the project documentation and the availability of a construction permit and the fulfillment of the established requirements for admission to construction work


# 34160601752229
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with the requirements technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34160601711621
Unscheduled inspection
Start date: 2016-07-13, end date: —, duration:
Authority:
Purpose of inspection: