# 001902905496
Unscheduled inspection
Start date: 2019-08-12, end date: —, duration: —
Authority: Dalnevostochnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection:
# 00170803009689
Unscheduled inspection
Start date: 2017-12-18, end date: 2018-01-22, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 00170803009666
Unscheduled inspection
Start date: 2017-12-18, end date: 2018-01-22, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 00170801934957
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-04, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 00170801934953
Unscheduled inspection
Start date: 2017-08-29, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 142101396076
Unscheduled inspection
Start date: 2021-12-01, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection:
# 142101396263
Unscheduled inspection
Start date: 2021-12-01, end date: 2021-12-28, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: verification in connection with the notification received by the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia): a) compliance of the constructed capital construction facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources; b) elimination by the developer, technical customer, person carrying out construction identified during construction control and state construction supervision of all violations of compliance of completed works with the requirements of regulatory legal acts and project documentation; c) execution of executive documentation related to the performance of all construction work, as well as the use of building materials (products), prevention, detection and suppression of violations committed by the developer, the technical customer, as well as by a person carrying out construction on the basis of a contract with a developer or customer (hereinafter referred to as the contractor), violations of legislation on urban planning activities, including project documentation, compliance with mandatory requirements and (or) requirements established by municipal legal acts
# 142101200819
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 142005245460
Unscheduled inspection
Start date: 2020-12-11, end date: 2020-12-14, duration: 2
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Saha YAkutiya
Purpose of inspection: This inspection is carried out in order to comply with Taasyuryakh Neftegazobycha LLC's order to eliminate violations in the field of environmental protection from 05102020 30SA2020 deadline until 30112020 issued by the Office of Rosprirodnadzor in the Republic of Sakha Yakutia. The objectives of this inspection are to monitor compliance with and compliance with the requirements of the legislation of the Russian Federation in the field of environmental protection. The purpose of this inspection is to comply with the instructions of the state control supervision authority
# 142004419222
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 142004419221
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 142004431077
Unscheduled inspection
Start date: 2020-06-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 142004331964
Unscheduled inspection
Start date: 2020-03-05, end date: 2020-03-06, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Saha YAkutiya
Purpose of inspection: The purpose of verifying the compliance of the information contained in the application of the licensee of Taasyuryakh Neftegazodobycha LLC with the licensing requirements of the application for the reissue of the BX URPN license under RS Ya 575 dated 07022020 The objectives of this audit are the licensing control of compliance of the licensee of Taasyuryakh Neftegazodobycha LLC with the licensing requirements when carrying out activities for the disposal of waste of hazard classes IV. The subject of this audit is the compliance of the information contained in the application and documents of a legal entity or individual entrepreneur on granting the legal status of a special permit license for the right to carry out certain types of activities or authorization approval for other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements
# 142004354103
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-03-13, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Saha YAkutiya
Purpose of inspection: This audit is conducted in order to verify the compliance of the information contained in the application of the licensee of Taasyuryakh Neftegazodobycha LLC with the licensing requirements of the application for the renewal of the license of the BX URPN under RS Ya 575 dated 07022020. The objectives of this audit are the licensing control of compliance of the licensee of Taasyuryakh Neftegazodobycha LLC with the licensing requirements when carrying out activities for the disposal of waste of hazard classes IV. The subject of this audit is the compliance of the information contained in the application and documents of a legal entity or individual entrepreneur for granting the legal status of a special permit license for the right to carry out certain types of activities or authorization approval for other legally significant actions if an appropriate unscheduled inspection of a legal entity or individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements for the condition of premises buildings structures and technical facilities equipment of other facilities that are supposed to be used by the license applicant or the licensee in carrying out the licensed type of activity and the availability of employees necessary for carrying out the licensed type of activity in order to assess the compliance of such facilities and employees with the licensing requirements
# 142004238805
Unscheduled inspection
Start date: 2020-01-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 142004238785
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-25, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141904065924
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-31, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141904065921
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-31, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141904164860
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141903935194
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141903985894
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 141903905800
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-26, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Respublike Saha YAkutiya
Purpose of inspection: verification of compliance with sanitary legislation and implementation of sanitary anti-epidemic preventive measures requirements of technical regulations
# 141903610202
Unscheduled inspection
Start date: 2019-09-18, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection:
# 001902905496
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-09-06, duration: —
Authority: Dalnevostochnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: implementation of the state metrological supervision of the implementation of supervision control over compliance with mandatory requirements of national standards and technical regulations
# 141902951299
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-09-04, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Saha YAkutiya
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms
# 141902731002
Unscheduled inspection
Start date: 2019-05-20, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902730994
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-17, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The purpose of the audit is to verify in connection with the BN notice dated May 08, 2019, which was received by the Department of State Construction and Housing Supervision of the Russian Federation. Entry on May 08, 2019The tasks are to prevent identify and suppress violations of urban planning legislation by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentation. Documentationsubject of verification compliance with mandatory requirements and or requirements established by municipal legal acts 1 compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements of parts 2 3 31 and 6 of Article 52 of the Urban Planning Code of the Russian Federation are the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141902731015
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-17, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The purpose of the audit is to verify in connection with the notice bn received by the Department of State Construction and Housing Supervision of the Russian Federation dated May 08, 201936 dated May 08, 2019The tasks are to prevent identify and suppress violations of urban planning legislation by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and design documentation. Documentation Subject of verification compliance with mandatory requirements and or requirements established by municipal legal acts 1 compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 2 3 31 and 6 of Article 52 of the Urban Planning Code of the Russian Federation are the availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in the case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 141902731008
Unscheduled inspection
Start date: 2019-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902589729
Unscheduled inspection
Start date: 2019-03-19, end date: 2019-03-21, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The purpose of the audit is to verify in connection with the bn notification received by the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia dated March 05, 2019, entry 23 dated March 11, 2019, the actual elimination of previously identified violations during the construction of a capital construction facility, prescribed for elimination by instruction 0408119 dated February 01, 2019 Tasks prevention detection and suppression of violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with a developer or customer, hereinafter referred to as the contractor, violations of legislation on urban planning activities, including technical regulations and project documentation Subject to verification of compliance with mandatory requirements and or requirements established by municipal legal acts 1 compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 2 3 31 and 6 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity.
# 141902589726
Unscheduled inspection
Start date: 2019-03-19, end date: 2019-03-21, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The purpose of the audit is to verify in connection with the bn notification received by the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia dated March 05, 2019, entry 22 dated March 11, 2019, the actual elimination during the construction of a capital construction facility of previously identified violations prescribed for elimination by regulation 0408319 dated February 01, 2019 Tasks prevention detection and suppression of violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with a developer or customer, hereinafter referred to as the contractor, violations of legislation on urban planning activities, including technical regulations and project documentation Subject to verification of compliance with mandatory requirements and or requirements established by municipal legal acts 1 compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 2 3 31 and 6 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works related to the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity.
# 141902589718
Unscheduled inspection
Start date: 2019-03-19, end date: 2019-03-21, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The purpose of the audit is to verify in connection with the bn notification received by the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia dated March 05, 2019, entry 19, dated March 11, 2019, the actual elimination during the construction of a capital construction facility of previously identified violations prescribed for elimination by regulation 0408519 dated February 01, 2019 Tasks prevention detection and suppression of violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with a developer or customer, hereinafter referred to as the contractor, violations of legislation on urban planning activities, including technical regulations and project documentation Subject to verification of compliance with mandatory requirements and or requirements established by municipal legal acts 1 compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 2 3 31 and 6 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to works on the organization of construction in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal entity.
# 141902589716
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902589713
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902589708
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902589701
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902450419
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-01, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The purpose of the verification test in accordance with the inspection plan approved by the Director of the office of the state construction and housing supervision of the Republic of Sakha Yakutia 27 Nov 2018 compliance with the construction of capital construction object developer technical customer entity engaged in the construction of obligatory requirements in the field of construction and construction materials used goods of the established order of construction, reconstruction of capital construction Tasks warning detection and suppression approved developer technical customer and the person in charge of the construction on the basis of the contract with the Builder or by the customer the contractor further violations of the legislation on town-planning activities including technical regulations and design documentation, verification of compliance with mandatory requirements and / or requirements of the municipal legal acts 1 compliance works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources 2 a permit for construction 3выполнение the requirements of parts 2 3 31 and 6 of article 52 of the town planning code of the Russian Federation, the certificate of admission to the works on the construction of reconstruction which affect the safety of capital construction objects including the certificate of admission to the works on the organization of the construction in the case involving a developer or technical customer on the basis of the Treaty of physical or legal person
# 141902450401
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 141902450444
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902450435
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902448451
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902448361
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 141902448320
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:
# 381802385049
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-28, duration: —
Authority: Gosudarstvennaya inspekciya truda v Irkutskoi oblasti
Purpose of inspection: protection of workers' rights
# 381801890295
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-29, duration: —
Authority: Gosudarstvennaya inspekciya truda v Irkutskoi oblasti
Purpose of inspection: protection of the rights and interests of the employee
# 141800314227
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-05-18, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Saha YAkutiya
Purpose of inspection: the purpose is to comply with the requirements of the Yakut Environmental Prosecutor from 18042018 1520182 on the fact of an emergency spill of petroleum products as a result of a pipeline failure during excavation work in the area of the Srednebotuobinsk oil and gas condensate field tasks supervision of compliance with mandatory requirements of the legislation of the Russian Federation in the field of environmental protection use and protection of land Subject compliance with mandatory requirements carrying out measures to prevent harm to the life health of citizens harm to animals plants and the environment
# 141800101565
Unscheduled inspection
Start date: 2018-02-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170803009689
Unscheduled inspection
Start date: 2017-12-18, end date: 2018-01-22, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 00170803009666
Unscheduled inspection
Start date: 2017-12-18, end date: 2018-01-22, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and design documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements technical regulations of project documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 00170801934957
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-04, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 00170801934953
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-04, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity
# 14150600659046
Unscheduled inspection
Start date: 2015-09-07, end date: 2015-09-18, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Saha YAkutiya
Purpose of inspection: Verification of the execution of the order on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 26022015 02MT2015 due to the expiration of the deadline for execution until 26082015