# 002105345699
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002105345909
Unscheduled inspection
Start date: 2021-02-04, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002105343232
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-03-01, duration: 20
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the regulations of the Volga Administration of Rostechnadzor dated 03/25/2020 № 43-23-2020-034, dated 06/01/2020 № 43-23-2020-053, dated 06/08/2020 № 43-23-2020-054, dated 06/19/2020 № 43-23-2020-066, dated 06/25/2020 № 43-23-2020-074, dated 06/26/2020 № 43-23-2020-076, dated 07/03/2020 № 43-23-2020-090, dated 07/10/2020 № 43-23-2020-093, dated 07/16/2020 № 43-23-2020-095, dated 07/17/2020 № 43-23-2020-100, dated 07/24/2020 № 43-23-2020-103, dated 07/30/2020 No. 43-23-2020-106, dated 09/11/2020 No. 43-23-2020-131, dated 09/10/2020 No. 43-23-2020-140, dated 10/26/2020 No. 43-23-2020-147, dated 10/30/2020 No. 43-23-2020-152 in respect of the following hazardous production facilities Section of the Kaleikino-Nizhnekamsk Refinery main oil pipeline of Almetyevsk RNU reg. no. A43-00782- 0112, Section of the Naberezhnye Chelny-Almetyevsk main oil pipeline Almetyevsk RNU reg. no. A43-00783-0069, ; Section of the main oil pipeline "Almetyevsk-Aznakaevo-2" Almetyevsk RNU reg. no. A43-00782-0052, ; Section of the main product pipeline "Nizhnekamsk-2-Naberezhnye Chelny" Almetyevsk RNU reg. no. A43-00782-0123, ; Section of the main oil pipeline "Chekmagush-Aznakaevo" Almetyevsk RNU reg. no. A43-00782-0062, ; Section of the main product pipeline "Subkhankulovo-Almetyevsk" Almetyevsk RNU reg. no. A43-00782-0119, Section of the main oil pipeline "Almetyevsk – Kaleikino" (sulfur) Almetyevsk RNU reg. no. A43-00782-0056, ; The site of the pumping station of the Almetyevsk-N. main product pipelineNovgorod" head pumping station "Almetyevsk" Almetyevsk RNU reg. no. A43-00782-0122; Site of the Nizhnekamsk Refinery receiving and delivery point (CIC no. 494) Almetyevsk RNU reg. no. A43-00782-0115, reg. no. A43-00782-0064, reg. no. A43-00782-0125, reg. no. A43-00782-0118,reg. no. A43-00782-0120, hazard class I.
# 002105344464
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002105344423
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002105345157
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-19, duration: 15
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the regulations of the Volga Administration of Rostechnadzor dated 06/25/2020 No. 43-23-2020-047, dated 09.09.2020 No. 43-23-2020-126 in relation to a hazardous production facility Section of the main oil pipeline "Osa-Perm", Perm RNU reg.
No. A43-00782-0072, hazard class I.
The objectives of this audit are: federal state supervision in the field of industrial safety in terms of eliminating violations by JSC Transneft - Kama Region of mandatory requirements in the field of industrial safety identified by the Volga Federal District Office of Rostechnadzor.
# 002105338511
Unscheduled inspection
Start date: 2021-02-02, end date: 2021-02-15, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of state control (supervision) bodies
# 002105344358
Unscheduled inspection
Start date: 2021-01-26, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005308142
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-24, duration: 8
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the fulfillment of the instruction from 21022020 212rpP2020 on the elimination of violations during the construction of the capital construction facility RVSPK50000 9 LPDS Perm PRNU Stroitelstvo on the basis of a request sent by JSC Transneft for an inspection of the previously issued instruction from 24112020 1142 vx 28236862 from 26112020
# 002005282408
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-11, duration: 20
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the inspection program case number 16582020 dated 14102020the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The subject of this inspection is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, require construction permits to comply with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002005282390
Unscheduled inspection
Start date: 2020-11-18, end date: 2020-12-08, duration: 15
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out with the aim of Contacting the Volga Administration of Rostechnadzor notification of completion of the construction of the capital construction facility "Almetyevsknovgorod Dn530x12 underwater crossing across the Kama River 170 km backup line Construction" ishTPK2007013543950 dated 11112020 bx 29055441 dated 12112020the objectives of this inspection are to prevent identify and prevent the technical customer and persons carrying out construction on the basis of a contract with by the developer or the technical customer of violations of the legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with energy metering devices resource availability of building permits compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002005214469
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005234171
Unscheduled inspection
Start date: 2020-10-16, end date: 2020-11-12, duration: 20
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is conducted in the framework of the Federal state construction supervision in the construction, reconstruction of capital construction objects referred to in paragraph 51 of article 6 of the town planning code of the Russian Federation with the exception of those objects in respect of which the exercise of state construction supervision of the decrees of the President of the Russian Federation assigned to other Federal bodies of Executive authority Register number functions in the Federal state information system "Federal Register of state and municipal services functions" 10001515438Установить that the real test is carried out to appeal to the Volga Department of Rostekhnadzor, the notice of completion of construction of capital construction object "Looping pipeline Changeproperty Chelny d=530 mm plot 17918083 km section 18083206 km IMOP Kieron Chelny using R toyma 200 km D500 looping URN Reconstruction" ex ТПК3006023736643 from 23092020 Rin 29044877 from 25092020Задачами of this review are to prevent detection and suppression approved developer technical customer as well as persons engaged in construction on the basis of an agreement with the developer or technical customer violations of the legislation on town-planning activities including technical regulations and design документации7 the Subject of this review alleycatallies works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices used energy resourcevalue permission to stroitelstvoimoti the requirements of parts 2 and 3 of article 31 of 52 Town planning code of the Russian Federation
# 002005214745
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-28, duration: 3
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the completed capital construction facility, namely, verification of compliance with the requirements of technical regulations, norms and rules of other regulatory legal acts and project documentation during the reconstruction of the capital construction facility of the capital construction facility "MN Surgutpolotsk rUtemka Debesa site DebesyLazarevo site 1458114583 km Du1000 URN Reconstruction"
# 002005214520
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-28, duration: 3
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of those facilities in respect of which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities
# 002005214723
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-28, duration: 3
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the completed capital construction facility, namely, verification of compliance with the requirements of technical regulations, norms and rules of other regulatory legal acts and project documentation during the reconstruction of the capital construction facility of the capital construction facility "MN Surgutpolotsk r Nuzyk Lazarevo Debesa section 1517315175 km Du1000 URN Reconstruction"
# 002005206171
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-18, duration: 150
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: to monitor compliance of the performed works with project documentation requirements for energy saving and energy efficiency in the reconstruction of capital construction object on the basis of a programme of inspections the purpose of this test is to verify compliance with the mandatory requirements of the legislation on town-planning including project documentation and requirements on energy saving and increase of energy efficiency in the construction of capital construction object developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer the focus of this test is to check the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with parts 15 of 152 and 153 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources used in accordance with the program of carrying out checks of the building permit compliance with the requirements of parts 2 3 and 31 St 52 of the town planning code of the Russian Federation
# 002005181756
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004968553
Unscheduled inspection
Start date: 2020-08-26, end date: —, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004732648
Unscheduled inspection
Start date: 2020-08-26, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004485586
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-08-14, duration: 7
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: to monitor compliance of the performed works with project documentation requirements for energy saving and energy efficiency in the reconstruction of capital construction object on the basis of a programme of inspections the purpose of this test is to verify compliance with the mandatory requirements of the legislation on town-planning including project documentation and requirements on energy saving and increase of energy efficiency in the construction of capital construction object developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer the focus of this test is to check the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with parts 15 of 152 and 153 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources used in accordance with the program of carrying out checks of the building permit compliance with the requirements of parts 2 3 and 31 St 52 of the town planning code of the Russian Federation
# 002004485457
Unscheduled inspection
Start date: 2020-08-06, end date: —, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004442267
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-21, duration: 12
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the audit program 62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development 7 The subject of this audit is compliance with mandatory requirements in the field of urban development compliance with the performance of works and the construction materials used in the process the construction of the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 002005147541
Unscheduled inspection
Start date: 2020-07-31, end date: 2020-08-27, duration: 20
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to check the capital construction facility "RVSPK50000 9 LPDS Perm PRNU Construction" S481066 OO and TS according to the notice on the completion dates of the capital construction facility LLC "Spetsstroyservice" dated 28072020 2111
# 002004450260
Unscheduled inspection
Start date: 2020-06-25, end date: —, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004450165
Unscheduled inspection
Start date: 2020-06-18, end date: 2020-06-29, duration: 7
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: to monitor compliance of the performed works with project documentation requirements for energy saving and energy efficiency in the reconstruction of capital construction object on the basis of a programme of inspections the purpose of this test is to verify compliance with the mandatory requirements of the legislation on town-planning including project documentation and requirements on energy saving and increase of energy efficiency in the construction of capital construction object developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer the focus of this test is to check the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with parts 15 of 152 and 153 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources used in accordance with the program of carrying out checks of the building permit compliance with the requirements of parts 2 3 and 31 St 52 of the town planning code of the Russian Federation
# 002004403847
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-05-27, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is being carried out in order to verify the fulfillment by JSC Transneft Prikamye of the regulations of the Volga Department of Rostechnadzor dated 09012020 43232020002 regarding the hazardous production facility Site of the Kaleikino pumping station of the Almetyevsk Kuibyshev1 main oil pipelines Almetyevsk Kuibyshev2 Almetyevsk Gorky 2 Almetyevsk Gorky 3KaleikinoNizhnekamsky Refinery Romashkinsky RNUreg A43007820021 hazard class and tasks The subject of this audit is the federal state supervision in the field of industrial safety in terms of eliminating violations by Transneft Prikamye of mandatory industrial safety requirements identified by the Volga Region Office of Rostechnadzor.7 The subject of this audit is to note the necessary compliance by a legal entity, an individual entrepreneur, in the course of its activities with the totality of mandatory requirements and requirements established by municipal legal acts, as well as the compliance of information contained in the notification on the beginning of the implementation of certain types of entrepreneurial activitiesv compliance with the regulations of state control bodies, supervision bodies of municipal control
# 002004378236
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004398616
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004312474
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-30, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program dated 27022019 case number 14912019the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this inspection is the conformity of the work performed and the building materials used during construction and reconstruction the capital construction facility and the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. the need for a construction permit to comply with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004387887
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-27, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: to monitor compliance of the performed works with project documentation requirements for energy saving and energy efficiency in the reconstruction of capital construction object on the basis of a programme of inspections the purpose of this test is to verify compliance with the mandatory requirements of the legislation on town-planning including project documentation and requirements on energy saving and increase of energy efficiency in the construction of capital construction object developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer the focus of this test is to check the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with parts 15 of 152 and 153 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources used in accordance with the program of carrying out checks of the building permit compliance with the requirements of parts 2 3 and 31 St 52 of the town planning code of the Russian Federation
# 002004115441
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-02-27, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the work performed under the inspection program for the reconstruction of the capital construction facility RVSP50000 94 LPDS Lazarevo KRNU ConstructionThe purpose of this audit is to prevent identify and suppress violations of legislation committed by the developer or the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, violations of legislation on urban development activities, project documentationthe purpose of this audit is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used. verification of the availability of a construction permit. verification of compliance with the requirements of Parts 2 and 3 of Article 52 of the Federal Law of 29122004 190 FZ "Urban Planning Code of the Russian Federation"
# 002004299526
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-03-05, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to verify the fulfillment by JSC Transneft Prikamye of the regulations of the Volga Department of Rostechnadzor dated 15112019 4323201915676135 in relation to a hazardous production facility Section of the Almetyevsk NNovgorod main product pipeline Romashkinsky Almetyevsk and Kazansky RNU reg A43007820121 hazard class I. The objectives of this inspection are the federal state supervision in the field of industrial safety in terms of eliminating violations by JSC Transneft Prikamye" mandatory requirements in the field of industrial safety identified by the Volga Region Office of Rostechnadzor.[7] The subject of this audit is the fulfillment of the instructions of the state control bodies, the supervision of municipal control bodies
# 002004386721
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-21, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to check the capital construction facility "RVSPK50000 9 LPDS Perm PRNU Construction" S481066 NGO and TS on the notice of completion dates of the capital construction facility LLC "Spetsstroyservice" dated 30122019 2117
# 002004217389
Unscheduled inspection
Start date: 2020-01-31, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004201114
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-02-10, duration: —
Authority: Upravlenie Federalnoi sluzhby po akkreditacii po Privolzhskomu federalnomu okrugu
Purpose of inspection: the purpose of the audit of the Report of Joint Stock Company "Transneft Prikamye" on the elimination of identified inconsistencies ex dated 19112019 TPK01030110847567 ex dated 20112019 PFO2977 and the documents attached to the report on the elimination of identified inconsistencies with the accreditation criteria specified in the Notification of the Federal Service for Accreditation dated 07112019 PFO2265THE objectives of this audit are to ensure compliance with the requirements of the legislation of the Russian Federation in the field of accreditation, including the Federal Law on 28122013 412 FZ "On accreditation in the National Accreditation System"Order of the Ministry of Economic Development of the Russian Federation No. 326 dated 30052014 "On approval of the criteria for accreditation of the list of documents confirming the applicant's compliance with the accredited person's accreditation criteria and the list of documents in the field of standardization, compliance with the requirements of which by applicants accredited persons ensures their compliance with the accreditation criteria" The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts, compliance by an accredited person in the course of carrying out activities mandatory requirements of the legislation of the Russian Federation for the activities of accredited persons
# 002004197449
Unscheduled inspection
Start date: 2020-01-14, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001904223293
Unscheduled inspection
Start date: 2019-12-17, end date: 2019-12-27, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the completed construction of the capital construction facility "MN Kholmogoryklin Permarlet section 150739150780 km Du1200 PRNU Reconstruction" R481047 NGO and TS on the notice of completion of the construction of the capital construction facility of JSC "TransneftePrikamye" dated November 2019 11714
# 001904265490
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-06, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that the present inspection is carried out on the basis of the notice of JSC Transneft Amur Region on the completion of the construction of the capital construction facility per Io43819 dated 13112019 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work, with the requirements of the project documentation, compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, the subject of state construction supervision is to verify compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001904095315
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-06, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the compliance of the completed works with the mandatory requirements of the design documentation for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility based on the completion notice "Replacement of the section MN AlmetyevskkUibyshev 1 section Almetyevsksamara I 7276 km 606374 km 886910137 km 1031610512 km Dn800mm Reconstruction" 12 stages located at the address of the Russian Federation Samara region Klyavlinsky district tasks of this audit It is the prevention detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer.
# 001904223277
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-11-29, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the completed works to be checked during the construction of the capital construction facility "MN Kholmogoryklin Permarlet site 150739150780 km Dn1200 PRNU Reconstruction" R481047 NGO and CU according to notification 11713 dated 211020198 Electrochemical Protection9 Connection to the existing MN11 Flushing of the dismantled oil pipeline combined with the removal of oil residues from the IGC12 Dismantling of the existing oil pipeline 13 Removal of dismantled pipes of equipment 14 Reclamation and restoration of land
# 001903955455
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-18, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the notice of JSC "TransneftePrikamye" on the completion of the construction of the capital construction facility per Io45219 dated 06112019 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work with the requirements of the project documentation compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001904237709
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903783365
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-08, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of JSC Transneft Amur Region on the completion of the construction of a capital construction facility per Io44519 dated 27092019 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work, with the requirements of the project documentation, compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation. The objectives of this inspection are to prevent and identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts, and design and working documentationthe subject of state construction supervision is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work the requirements of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903765119
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-18, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to evaluate the work performed and decide whether to issue an opinion on the conformity of the reconstructed capital construction facility or to refuse to issue such an opinion. The purpose of this audit is to prevent identify and suppress violations of urban planning legislation committed by the developer or technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or technical customer, including The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, checking the availability of a construction permit, verifying compliance with the requirements of parts 2 3 and 31 of Article 52 Federal Law No. 190 FZ dated 29122004 "Urban Planning Code of the Russian Federation"
# 001903765173
Unscheduled inspection
Start date: 2019-10-08, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903929029
Unscheduled inspection
Start date: 2019-10-30, end date: 2019-11-08, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 7 To establish that the present inspection is carried out on the basis of the notice of JSC Transneftekamye on the completion of the construction of the capital construction facility per Io44919 dated 24102019 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work, with the requirements of the draft documentation, the fulfillment of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation8 with the subject of state construction supervision is the verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used d the availability of a construction permit, compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903934570
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-11-14, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "Boiler house and heating networks of the NPS "Biser" PRNU Reconstruction" according to the notice of completion of the construction of the reconstruction of the capital construction facility of JSC Transneftrikamye dated 07102019 62313 Vx 71913 dated 07102019
# 001904087143
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-11-15, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the completed works that are subject to verification upon completion of the construction of the capital construction facility "Replacement of the section of the Permalmetyevsk MN through the Burnya 193 km Dn1020 mm Reconstruction" R48975 OO and TS according to the notice of JSC "TransneftePrikamye" on the completion of the construction of the capital construction facility 12244 dated 02102019
# 001903934653
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-11-15, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: a the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with design documentation, including energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902991724
Unscheduled inspection
Start date: 2019-09-11, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903684733
Unscheduled inspection
Start date: 2019-09-30, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903624974
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-10-11, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the previously issued regulation 432352019080 dated 31072019 of the appeal to the Volga Department of Rostechnadzor notification of the elimination of violations of the Kazan RNU of Transneft Prikamye JSC exc TPK5005030435253 dated 02092019 ex 47563C dated 02092019the objectives of this audit are to prevent identify and suppress violations of legislation on urban development committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer including technical regulations and project documentation7 The subject of this audit is the fulfillment of an instruction issued by the state construction supervision authority to eliminate identified violations of mandatory requirements
# 001903624007
Unscheduled inspection
Start date: 2019-09-20, end date: 2019-10-17, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the previously issued order 432320197714090 of 14052019 appeals to the Volga Department of Rostechnadzor notification of the elimination of violations of the Almetyevsk RNU of Transneft Prikamye JSC ex 607 dated 06092019 ex 49065C dated 09092019compliance with the order issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements
# 001903623444
Unscheduled inspection
Start date: 2019-09-20, end date: 2019-10-17, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the previously issued regulation 432320197714092 dated 09082019 appeals to the Volga Department of Rostechnadzor notification of the elimination of violations of the Almetyevsk RNU of Transneft Prikamye JSC ex 608 dated 06092019 ex 49060C dated 09092019the tasks of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements
# 001903833693
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-04, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the compliance of the completed works with the mandatory requirements of the design documentation for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility based on the completion notice "MN Kaltasy AlmetyevskkUibyshev 3 site 233288 km 28768288 km DN700 RRNU Reconstruction" located at Samara region Volzhsky district, the objectives of this audit are to prevent identify and suppress violations committed by the developer and the customer. also by a person carrying out construction on the basis of a contract with a developer or customer for violations of legislation on urban planning activities, including project documentation.
# 001903833649
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-04, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the compliance of completed works with the mandatory requirements of the design documentation for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility based on the completion notice "Replacement of the section MN AlmetyevskkUibyshev 1 section Almetyevsksamara I 1134411755 km 1184411918 km 1223713997 km DN800 mm Reconstruction" located at the address Samara region Isaklinsky district, the objectives of this audit are to prevent identify and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer
# 001903716690
Unscheduled inspection
Start date: 2019-09-04, end date: 2019-09-17, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the compliance of the completed works with the mandatory requirements of the design documentation for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "Replacement of the section MN AlmetyevskkUibyshev 1 section Almetyevsksamara I 7276 km 606374 km 886910137 km 1031610512 km Dn800mm Reconstruction" located at the address of the Russian Federation Samara region Klyavlinsky district on the basis of the program of inspections of the capital construction facility objectives of this The purpose of the audit is to prevent identify and suppress violations of the law on urban development activities, including project documentation, committed by the developer, the customer, as well as by persons carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work with the requirements of the project documentation, including requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, the fulfillment of the requirements of Parts 2 3 and 31 of Art 52 of the Urban Planning Code of the Russian Federation on the basis of, on the basis of, a program for conducting inspections of a capital construction facility
# 001903716715
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001903169722
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903308488
Unscheduled inspection
Start date: 2019-07-10, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902909048
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-30, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment by JSC "Transneftekamye" previously issued by the West Ural Office of the Federal Service for Environmental Technological and Nuclear Supervision order 36144519 dated 07062019the objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the customer, of compliance with the requirements of technical regulations performed during the construction of a capital construction facility. regulatory legal acts and design and working documentationthe subject of the audit is the execution of the previously issued West Ural Department of the Federal Environmental Technological and Nuclear Supervision Service Regulation 36144519 of07062019
# 001902909096
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-30, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment by JSC "Transneftekamye" of the previously issued West Ural Department of the Federal Environmental, Technological and Nuclear Supervision Service regulation 35144919 dated 07062019the objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the customer, of compliance with the requirements of technical regulations performed during the construction of a capital construction facility other regulatory legal acts and design and working documentationthe subject of the audit is the execution of the previously issued West Ural Department of the Federal Environmental Technological and Nuclear Supervision Service regulation 35144919 of07062019
# 001902817624
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-12, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment by JSC "Transneftekamye" of the previously issued West Ural Department of the Federal Environmental, Technological and Nuclear Supervision Service regulation 2843819 dated 30042019the objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the customer, of compliance with the requirements of technical regulations performed during the construction of a capital construction facility other regulatory legal acts and design and working documentation6 The subject of verification is the execution of the previously issued West Ural Department of the Federal Environmental Technological and Nuclear Supervision Service Regulation 2843819 of 30042019
# 001902909149
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-07-26, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the notice of JSC Transneft Amur Region on the completion of the construction of a capital construction facility per Io44419 dated 18072019 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work, with the requirements of the project documentation, compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation. The objectives of this inspection are to prevent and identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of the design and working documentationthe subject of state construction supervision is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of Parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902896426
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902898807
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-11, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the compliance of the completed works with the mandatory requirements of the design documentation for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "MN Kaltasy AlmetyevskkUibyshev 3 site 233288 km 28768288 km Dn700 RRNU Reconstruction" located at Samara region Volzhsky district based on the program of inspections of the capital construction facility, the objectives of this audit are to prevent identify and suppress The subject of this audit is to verify the compliance of the work performed and the building materials used during the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and facility equipment requirements. capital construction accounting devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of, on the basis of, a program for conducting inspections of a capital construction facility
# 001902881660
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-07-01, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify the elimination of violations specified in the regulation dated 25042019 1606rp P2019 issued by the Chief State Inspector of the Interregional Department of State Construction Supervision of Lifting facilities and boiler supervision of the West Ural Department of Rostechnadzor, Poyarkov BB, regarding the construction of the capital construction facility "Replacement of the section of the Permalmetyevsk MN through the 193 km Dn1020 mm highway Reconstruction
# 001902898669
Unscheduled inspection
Start date: 2019-06-20, end date: 2019-07-10, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the compliance of the completed works with the mandatory requirements of the design documentation for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "MN AlmetyevskkUibyshev 2 KaleikinoLopatino section 736781 km Dn1000 RRNU Reconstruction" located at the address Russian Federation Samara region Klyavlinsky district on the basis of the program of inspections of the capital construction facility, the objectives of this audit are to prevent identify and suppress The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and facility equipment requirements. capital construction accounting devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of, on the basis of, a program for conducting inspections of a capital construction facility
# 001902881629
Unscheduled inspection
Start date: 2019-06-21, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902823886
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-07-19, duration: —
Authority: Upravlenie Federalnoi sluzhby po akkreditacii po Privolzhskomu federalnomu okrugu
Purpose of inspection: in order to verify the Report of the Joint Stock Company "Transneft Prikamye", the branch of the Joint Stock Company "Transneft Prikamye", "Kazan Regional Oil Pipeline Administration" on the elimination of identified inconsistencies dated 30052019 TPK500207013621200 dated 30052019 PFO1616 and the documents attached to the report on the elimination of identified inconsistencies with the accreditation criteria specified in the Notification of the Federal Accreditation Agency for the Volga Federal District dated 08052019 PFO1064THE objectives of this audit are to ensure compliance with requirements of the legislation of the Russian Federation in the field of accreditation, including Federal Law No. 412 FZ dated 28122013 "On Accreditation in the National Accreditation System"Order of the Ministry of Economic Development of the Russian Federation No. 326 dated 30052014 "On approval of the criteria for accreditation of the list of documents confirming the applicant's compliance with the accredited person's accreditation criteria and the list of documents in the field of standardization, compliance with the requirements of which by applicants accredited persons ensures their compliance with the accreditation criteria"The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts and compliance by an accredited person in the course of carrying out activities with mandatory requirements of the legislation of the Russian Federation for the activities of accredited persons.
# 001902689233
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-06-07, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance with mandatory requirements in the field of urban development The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development The subject of this audit is compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 001902823954
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902648453
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-22, duration: —
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the compliance of the completed works with the mandatory requirements of the design documentation for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "MN AlmetyevskkUibyshev 1 Almetyevsksamar section I 258327626km Dn800 mm Reconstruction" located at the address Russian Federation Samara region Volzhsky district MN AlmetyevskkUibyshev 1 Almetyevsksamar section 258327626 km based on the program of inspections of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development activities, including project documentation, committed by the developer, the customer, as well as by persons carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation in accordance with the requirements of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, the fulfillment of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of a program for conducting inspections of a capital construction facility.
# 001902630562
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-04-02, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this inspection is carried out on the basis of the notice of JSC TransneftePrikamye on the completion of the construction of the capital construction facility per Io43319 dated 18032019 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work, with the requirements of the project documentation, compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation with the objectives of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the customer, of the compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts, and design and working documentation 7 The subject of state construction supervision is to verify the compliance of the work performed and the building materials used during the construction and reconstruction of the capital construction facility construction as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902713721
Unscheduled inspection
Start date: 2019-03-29, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902471765
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-22, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: a the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used b the availability of a construction permit c compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902532444
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-22, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance with mandatory requirements in the field of urban development The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development The subject of this audit is compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 001801924092
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-10-29, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to evaluate the work performed and decide whether to issue an opinion on the compliance of the constructed capital construction facility or to refuse to issue such an opinion on the basis of the order of the West Ural Office of Rostechnadzor dated 09082016 10prk the objectives of this inspection are to prevent identify and suppress violations committed by the developer or technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or by the technical customer of violations of legislation on urban planning activities, including technical regulations and design documentation, the subject of this audit is to verify that the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, comply with the requirements of technical regulations of the project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices used energy resources
# 001801779626
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-05, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out on the basis of the notice of JSC Transneft Prikamye on the completion of the construction of a capital construction facility per Io43218 dated 21092018 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work, with the requirements of the project documentation, compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, The objectives of this inspection are to prevent as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the customer, of the compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts, and design and working documentation 7 The subject of state construction supervision is to verify the compliance of the work performed and the building materials used during the construction and reconstruction of the capital construction facility and as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001801892645
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-11-02, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance with mandatory requirements in the field of urban development The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development The subject of this audit is compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.
# 001802151717
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-11-14, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the completed works subject to verification upon completion of the construction of the capital construction facility "Replacement of the section of the Kholmogoryklin PPMN through the Lysva district by 1,373 km Dn1200 mm main line Reconstruction" according to the notice of JSC Transneft Prikamye dated 05102018 12123 Vx 15826 dated 05102018 R48913 OO and TS
# 001801435656
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-09-25, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance with mandatory requirements in the field of urban development The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development The subject of this audit is compliance with mandatory requirements in the field of urban development compliance with the performance of work and applied building materials during the construction of a capital construction facility as well as the results of such work requirements project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body
# 001800630900
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-08-21, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this inspection is carried out on the basis of the notice of Transneft Prikamye JSC on the completion of construction per Io42118 dated 07082018 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work, with the requirements of technical regulations, norms and rules of project documentation, compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulatory legal acts of design and working documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the customer. 7 The subject of state construction supervision is to verify the compliance of completed works and the construction materials used during construction and reconstruction the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 001800626679
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-17, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this inspection is carried out on the basis of the notice of Transneft Prikamye JSC on the completion of construction per Io42218 dated 31072018 in order to verify the compliance of the work and the use of building materials during the reconstruction process, as well as the results of such work, with the requirements of technical regulations, norms and rules of project documentation, compliance with the requirements of Parts 2 and 3 of the Urban Planning Code of the Russian Federation. The purpose of this audit is to prevent and detect and prevent violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulatory legal acts of design and working documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the customer. The subject of state construction supervision is to verify the compliance of completed works and the construction materials used during the construction and reconstruction of the facility capital construction as well as the results of such work, the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 001800687019
Unscheduled inspection
Start date: 2018-08-29, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800502964
Unscheduled inspection
Start date: 2018-07-03, end date: 2018-07-06, duration: 4
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to establish the fact of the fulfillment of the non-fulfillment by JSC Transneft of previously issued regulations on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements from 22092017 3551 3552 3553, the deadline for which expires 02072018 The purpose of this audit is to monitor compliance with mandatory requirements for the protection of atmospheric air and the use and protection of water bodies The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 001800177748
Unscheduled inspection
Start date: 2018-03-05, end date: —, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800258867
Unscheduled inspection
Start date: 2018-03-06, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800069807
Unscheduled inspection
Start date: 2018-02-19, end date: 2018-03-21, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is conducted in order to implement the audit program dated 28092017 case number 12822017. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer. works and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 001800054611
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to implement the audit program dated 22.012018 case number 13352018. The objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation 7. The subject of this audit is compliance performance of works and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 001800047738
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the inspection program from 13042017 case number 12292017 as amended from 29122017 1575P according to the program, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer 7 The subject of this audit is compliance performance of works and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 001800046959
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-02-09, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of the inspection program dated 26122017 case number 13252017 The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation on the subject of compliance of the work and the construction materials used during construction and reconstruction the capital construction facility and the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 001800047067
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-02-09, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of the audit program dated 25/122017 case number 13232017 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
# 00170802959645
Unscheduled inspection
Start date: 2017-12-06, end date: 2017-12-26, duration: —
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Samarskoi i Ulyanovskoi oblastyam
Purpose of inspection: control of the fulfillment of the prescription
# 001700000371
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-12-25, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the completed works that are subject to inspection upon completion of the construction of the capital construction facility "ZHBR5000 1 fire water reserve LPDS "OSA "PRNU Construction" according to the notice of JSC "TransneftePrikamye" 2124 dated 31102017
# 00170802977894
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-16, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the previously issued regulation 4323087 dated 10102017
# 00170802806612
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-08, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the implementation of paragraphs 19 of the previously issued instruction from 07082017 43181085115the tasks of this audit are to monitor the measures taken by a legal entity to comply with the requirements of the Technical Regulations on Elevator Safety.
# 00170802876244
Unscheduled inspection
Start date: 2017-11-21, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Respublike Tatarstan
Purpose of inspection:
# 00170802938651
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-08, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Appeal to the Volga Administration of Rostechnadzor notification of the developer or technical customer on the completion of the reconstruction of the capital construction facility dated 23112017 TPK0104031345844