Found 6 inspections:

# 741800528896
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-08-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 Urban Planning Code of the Russian Federation


# 741800453105
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed when checking the installation of fencing valves identification posts during crimping of the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800242431
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of 3 valves along Uralskaya Street when installing placemarks for the location of underground network devices identification posts and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23i 31 st52 of the Urban Planning Code of the Russian Federation


# 741800099151
Unscheduled inspection
Start date: 2018-02-28, end date: 2018-03-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work performed during the installation of supply lines to houses on 212 Uralskaya Street and Olkhovaya Street on the even and non-even sides of house 27 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741800008571
Unscheduled inspection
Start date: 2018-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802992849
Unscheduled inspection
Start date: 2017-12-26, end date: 2018-01-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the laying of an underground gas pipeline with a supply line to residential buildings along Yesenina Street Uralskaya Street on the even side of house 1434 on the non-even side of house 317 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of h 23 and 31 art 52 The Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.