Unscheduled inspection
Start date: 2019-04-29, end date: 2019-05-31, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms, including on issues of remuneration in connection with the received appeal hc 747177219OB dated 18042019. The objectives of this audit are to ensure that the employer complies with the labor legislation of the Russian Federation and other regulatory legal acts containing labor law norms. The subject of this audit is It is necessary to note the necessary compliance with the mandatory requirements and or requirements established by municipal legal acts
# 741802185446
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801891879
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-11-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800661445
Unscheduled inspection
Start date: 2018-08-30, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800596982
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800525683
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800486574
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on filling window and door openings of 15 floors before the slopes and installation of window sills and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800422857
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a multilayer roof structure for the installation of rafter structures of a hip roof with an external drain and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800268926
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the masonry work on the exterior and interior walls of partitions installation of lintels of staircases and platforms of the 5th floor ventilation shafts of the attic parapet for the installation of precast concrete pavement at otm+15000 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh Articles 23 and 31 of the Urban Planning Code of the Russian Federation
# 741800099892
Unscheduled inspection
Start date: 2018-02-28, end date: 2018-03-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the masonry work on the exterior and interior walls of partitions, the installation of lintels of staircases and platforms of the 4th floor and attic ventilation shafts for the installation of precast concrete pavement on otm+12000 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 The availability of a construction permit 3 The fulfillment of the requirements of hh Articles 23 and 31 of the Urban Planning Code of the Russian Federation
# 74180803033600
Unscheduled inspection
Start date: 2018-01-11, end date: 2018-01-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the masonry work on the exterior and interior walls of partitions for the installation of lintels of staircases and platforms for the installation of precast concrete floors on the 1st, 2nd and 3rd floors at otm+9000 before the start of masonry on the exterior and interior walls of the 4th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802872000
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the zero cycle with the installation of a foundation plate for the installation of a prefabricated ribbon foundation for waterproofing foundations for masonry of the basement for the installation of a prefabricated floor covering of basements at otm 0300 for laying external water supply networks, sewerage, electricity supply before the start of work on backfilling the sinuses of the excavation and the construction materials used during the construction of the capital construction facility and as well as the results of such work, the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802741122
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-10-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the breakdown of the building axes, excavation work on the development of a foundation pit, compliance with fire and sanitary and epidemiological measures before the installation of a monolithic foundation slab and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation