Found 28 inspections:

# 222100269002
Unscheduled inspection
Start date: 2021-06-09, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: S celyu proverki ispolneniya predpisaniya ot 20.02.2021 № AVM-283, srok ispolneniya kotorogo istek 22.03.2021. Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222105348220
Unscheduled inspection
Start date: 2021-02-17, end date: 2021-02-20, duration: 4
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 02.09.2020 № 3, po izvescheniyu o srokah zaversheniya rabot ot 18.01.2021 № 1 (vh. ot 20.01.2021 № 62/VP/118) Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 742005172726
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-10-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of finishing works, installation of technological equipment, installation of ventilation systems, installation of household and fire water pipes, installation of household sewerage, installation of door blocks and gates, installation of floors, installation of electrical equipment, landscaping, compliance with fire-fighting and sanitary epidemiological measures and building materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities on which energy efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004472136
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 222004496788
Unscheduled inspection
Start date: 2020-08-19, end date: 2020-08-21, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the program of inspections from 02072020 2 The tasks of this audit are the prevention detection and suppression of violations of legislation on urban development activities, including the requirements of project documentation, the subject of this audit is p 1 2 3 h2 st54 GrK RF


# 222004415651
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-28, duration: 4
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 10092019 2 vypolnenie rabot po ustroistvu vnutrennih setei inzhenernotehnicheskogo obespecheniya vypolnenie rabot po montazhu tehnologicheskogo oborudovaniya Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004415715
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-05-29, duration: 4
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 31102019 1 ustroistvo fundamentov podgotovitelnopressovogo ceha kotelnoi bunkera otgruzki v avtotransport bunkera dlya hraneniya luzgi osuschestvlenie podgotovki zemelnogo uchastka geodezicheskie zemlyanye raboty dlya ustroistva rezervuarnogo parka masla protivopozharnoi nasosnoi stancii parka hraneniya SUG Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 421903594618
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902762619
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902610470
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802328180
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 701802182234
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-24, duration:
Authority: Gosudarstvennaya inspekciya truda v Tomskoi oblasti
Purpose of inspection: Ensuring the observance and protection of the labor rights and freedoms of citizens, including the right to safe working conditions


# 421802095594
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421801930989
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel proverka ispolneniya predpisaniya inspekcii 0428148 ot 18052018 zadacha proverka ustraneniya narushenii pri osuschestvlenii stroitelstva predmet ispolnenie predpisaniya inspekcii 0428148 ot 18052018


# 421801902352
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-10-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800948761
Unscheduled inspection
Start date: 2018-09-28, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 421800650488
Unscheduled inspection
Start date: 2018-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 421800438923
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800371915
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel proverka ispolneniya predpisaniya inspekcii 0428145 ot 27102017 zadacha proverka ustraneniya narushenii pri osuschestvlenii stroitelstva predmet ispolnenie predpisaniya inspekcii 0428145 ot 27102017


# 421800165345
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 70170802901011
Unscheduled inspection
Start date: 2017-11-24, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Tomskoi oblasti
Purpose of inspection: proverka sootvetstviya soiskatelya licenzii licenzionnym trebovaniyam i usloviyam pri osuschestvlenii deyatelnosti po montazhu tehnicheskomu obsluzhivaniyu i remontu sredstv obespecheniya pozharnoi bezopasnosti zdanii i sooruzhenii


# 42170802854389
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170802762118
Unscheduled inspection
Start date: 2017-10-23, end date: —, duration:
Authority:
Purpose of inspection:


# 42170802538107
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel Proverka ispolneniya predpisaniya 0428143 ot 25072017 Zadacha proverka ustraneniya narushenii dopuschennyh pri stroitelstve Predmet Proverka ispolneniya predpisaniya 0428143 ot 25072017


# 42170802629095
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170802629074
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170701908634
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-08-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 42170701305446
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-01-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Cel Proverka ispolneniya predpisaniya 0429142 ot 25102016 Zadacha proverka ustraneniya narushenii dopuschennyh pri stroitelstve Predmet Proverka ispolneniya predpisaniya 0429142 ot 25102016


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.