Found 3 inspections:

# 262004312945
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-04-08, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: Notification of the Director of Energoritm LLC on the completion of the stages of work subject to verification of construction completion dated 17022020 17790105 the objectives of this audit are to prevent identify and suppress violations of urban planning legislation committed by the developer, technical customer, and the person carrying out construction, including technical regulations and design documentation, compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, and drafting acts of inspection of work on structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


# 261904140266
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: Notification of Energoritm LLC 218360414 dated 16122019 on the completion of the construction of a capital construction facility the objectives of this audit are to prevent, identify and suppress violations of urban planning legislation by the developer, the technical customer, and the person carrying out construction, including technical regulations and design documentation, compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, and drawing up work inspection reports structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902690171
Unscheduled inspection
Start date: 2019-04-29, end date: 2019-05-23, duration:
Authority: Gosudarstvennaya inspekciya truda v Stavropolskom krae
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Written appeal of a citizen 267127519OB dated 23042019


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.