# 74170802815875
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya otdelochnyh rabot mest obschego polzovaniya santehmontazhnyh rabot ustroistva vnutrennih sistem holodnogo i goryachego vodosnabzheniya otopleniya vodootvedeniya montazha liftovogo oborudovaniya posle fakticheskogo okonchaniya rabot ustroistva sistemy elektrosnabzheniya slabotochnyh sistem elektroschitovoi posle fakticheskogo okonchaniya rabot soblyudeniya protivopozharnyh i sanitarnoepidemiologicheskih meropriyatii meropriyatii po obespecheniyu dostupa malomobilnyh grupp naseleniya posle fakticheskogo okonchaniya rabot ustroistva krylec posle fakticheskogo okonchaniya rabot blagoustroistva pridomovoi territorii do ukladki verhnego pokrytiya trotuarov i proezdov i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF
# 74170802796669
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the laying of internal engineering systems for electricity, heating, water supply, sewerage, finishing works and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802631454
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work performed when filling window and door openings, finishing facade surfaces and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802631443
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on filling window openings of 710 floors prior to the slopes and installation of window sills finishing works in common areas plumbing installation of internal cold and hot water supply systems heating drainage installation of elevator equipment before the actual completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work requirements of technical regulations project documentation2 Permits for Building3compliance with the requirements of HR 23 ST52 of the Urban Planning Code of the Russian Federation
# 74170802527131
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701814637
Unscheduled inspection
Start date: 2017-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701629764
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701639836
Unscheduled inspection
Start date: 2017-05-25, end date: 2017-05-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot pri montazhe konstrukcii so 2go po 5i etazhi i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74170701567272
Unscheduled inspection
Start date: 2017-04-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701479749
Unscheduled inspection
Start date: 2017-03-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701381838
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 57 floors before the start of installation of load-bearing and enclosing structures of the 8th floor and the building materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 Urban Planning Code Russian Federation
# 74170701302126
Unscheduled inspection
Start date: 2017-01-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701244402
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of supporting structures of the basement and first floor, exterior and interior walls, ceilings and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701206548
Unscheduled inspection
Start date: 2016-12-07, end date: 2016-12-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site, the removal of the axes of the object in kind, the development of the excavation pit and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701248431
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work performed during the installation of the monolithic grillwork and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701070576
Unscheduled inspection
Start date: 2016-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701127672
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the grillwork after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701053089
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu svainyh fundamentov i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 st 52 Gradostroitelnogo kodeksa RF
# 74160700870252
Unscheduled inspection
Start date: 2016-09-29, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: