Found 21 inspection:

# 782101188333
Unscheduled inspection
Start date: 2021-10-05, end date: —, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: Determination of compliance of the constructed capital construction facility with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. Prevention, as well as identification and suppression of violations committed by the person carrying out the construction, of compliance with the work performed during the construction of the facility with the requirements of the design documentation. Verification of the completed capital construction facility for compliance with the requirements of design documentation, including fire-fighting measures, measures to ensure the sanitary and epidemiological well-being of the population, environmental protection, energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 782100275972
Unscheduled inspection
Start date: 2021-03-17, end date: —, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: Determination of compliance of the constructed capital construction facility with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. Prevention, as well as identification and suppression of violations committed by the person carrying out the construction, of compliance with the work performed during the construction of the facility with the requirements of the design documentation. Verification of the completed capital construction facility for compliance with the requirements of design documentation, including fire-fighting measures, measures to ensure the sanitary and epidemiological well-being of the population, environmental protection, energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 001902867783
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-09-08, duration:
Authority: SeveroZapadnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Verification of compliance with mandatory requirements in the field of state regulation of ensuring the uniformity of measurements based on Timofeev's complaint to IA vx G60 dated 03072019


# 781801466237
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-10-16, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: monitoring the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 28072017 22317011, the deadline for which expired on 01082018. The objectives of this audit are to identify, suppress and prevent possible violations of fire safety requirements, systematically monitor the implementation of fire safety requirements. The subject of this audit is compliance with fire safety requirements at the protection facility used by the operated an organization in the process of carrying out its activities


# 781801467766
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-10-16, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: monitoring the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 28072017 22317111, the deadline for which expired on 01082018. The objectives of this audit are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements. The subject of this audit is compliance with fire safety requirements at the protection facility used in operation an organization in the process of carrying out its activities


# 781800533914
Unscheduled inspection
Start date: 2018-08-02, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection:


# 781800493810
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 781800470198
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: control of elimination of violations of fire safety requirements specified in paragraphs 12345678910111213141518212223 of the regulation on elimination of identified violations of fire safety requirements dated 25072017 21528911, the deadline for which expired on 01072018 the objectives of this audit are to identify suppress and prevent possible violations of fire safety requirements carry out systematic monitoring of compliance with fire safety requirements The subject of this audit is compliance with fire safety requirements at the facility protection used and operated by the organization in the course of its activities


# 78170802820674
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-12-01, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po gSanktPeterburgu
Purpose of inspection: Control of the execution of the regulation from 17042017 21651


# 78170802540872
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-03, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: This inspection is carried out in order to control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 28102016 2863911, the deadline for which expired on 01102017. The objectives of this inspection are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements. The subject of this inspection is compliance with fire safety requirements. security at the protection facility used and operated by the organization in the course of its activities


# 78170802367420
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-27, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: The purpose is to monitor the elimination of violations of fire safety requirements specified in paragraphs 16171920 of the regulation on the elimination of identified violations of fire safety requirements dated 25072017 21528911, the deadline for which expired on 01102017the objectives of this audit are to identify, suppress and prevent possible violations of fire safety requirements, systematically monitor the implementation of fire safety requirements. The subject of this audit is compliance with fire safety requirements at the protection facility used and operated by the organization in the course of carrying out its activities


# 78170801964710
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-10-09, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: this inspection is carried out in order to control the elimination of violations of fire safety requirements specified in the regulation on the elimination of identified violations of fire safety requirements dated 05102017 g 2863311, the deadline for which has expired the deadline for elimination 10092017 gthe objectives of this inspection are to identify, suppress and prevent possible violations of fire safety requirements carry out systematic monitoring of compliance with fire safety requirements The subject of this inspection is compliance with fire safety requirements at the protection facility used and operated by the organization in the course of its activities


# 78170802424809
Unscheduled inspection
Start date: 2017-09-11, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection:


# 47170801923099
Unscheduled inspection
Start date: 2017-07-01, end date: 2017-07-01, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: completing the preposition


# 78170701483826
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-05-03, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po gSanktPeterburgu
Purpose of inspection: Administrative survey Act dated 31.012017 21320AO


# 00170701454793
Unscheduled inspection
Start date: 2017-03-14, end date: 2017-04-10, duration:
Authority: Komitet po prirodopolzovaniyu ohrane okruzhayuschei sredy i obespecheniyu ekologicheskoi bezopasnosti
Purpose of inspection: prevention detection and suppression of violations of legislation in the field of environmental protection enforcement of legislation in the field of environmental protection compliance with requirements including regulations and regulatory documents in the field of environmental protection as well as ensuring environmental safety by an economic entity in the territory of St. Petersburg


# 78170701299698
Unscheduled inspection
Start date: 2017-01-12, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection:


# 78160700702302
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-10-12, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: control of elimination of violations of fire safety requirements specified in regulation 2865511 of 22092015 on elimination of violations of fire safety requirements


# 78160601614733
Unscheduled inspection
Start date: 2016-05-16, end date: —, duration:
Authority:
Purpose of inspection:


# 78150601414782
Unscheduled inspection
Start date: 2015-12-11, end date: 2015-12-25, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: execution of the order of the Deputy Chairman of the Government of the Russian Federation DO Rogozin dated 22092015 RDP46456 and letters of the NWRC of the Ministry of Emergency Situations of Russia 118283110 dated 02112015 118293110 dated 02112015 orders of the Main Directorate 53 dated 20112015


# 78150601341167
Unscheduled inspection
Start date: 2015-11-16, end date: 2015-12-11, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: control of elimination of violations of fire safety requirements specified in the regulation OND 225879 dated 28102014


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.