Found 10 inspections:

# 422101159114
Unscheduled inspection
Start date: 2021-10-13, end date: —, duration:
Authority:
Purpose of inspection:


# 242100193070
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 14
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Establish that: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program dated December 23, 2020 for inspections during the construction of the capital construction facility.; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is: 7.1. Verification of compliance of the work performed and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Development Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility metering devices for used energy resources; 7.2. Meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.3. Verification of the construction permit.


# 242100040773
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-03-01, duration: 20
Authority: Ministerstvo ekologii i racionalnogo prirodopolzovaniya Krasnoyarskogo kraya
Purpose of inspection: Objective: to prevent environmental hazards resulting from negative environmental impacts by polluting atmospheric air with emissions from sources of negative environmental impacts if measures are not taken to reduce emissions of harmful (polluting) substances into the atmosphere during adverse meteorological conditions.; Task: assessment of compliance with the implementation by Antares C LLC of measures to reduce emissions of harmful pollutants into the atmospheric air during adverse meteorological conditions from 19:00 on 30.01.2021 to 19:00 on 02/01/2021; Subject: compliance with mandatory requirements and (or) requirements established by municipal legal acts; carrying out measures to prevent the threat of environmental damage during adverse meteorological conditions from 7 p.m. on January 30, 2021 to 7 p.m. on February 1, 2021.


# 242004466430
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 07072020 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation If the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Meeting the requirements set out in Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 422004448662
Unscheduled inspection
Start date: 2020-07-10, end date: 2020-07-15, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: In order to verify the compliance of the work performed and the building materials used in the course of work on the installation of engineering communication networks finishing work installation of technological equipment and automation installation of fire tanks pumping station landscaping requirements of the design documentation The task of the audit is compliance with the requirements of the legislation of the Russian Federation in the field of urban development The subject of the audit is compliance with the requirements of the legislation of the Russian Federation in the field of urban development


# 422004410030
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-28, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the building materials used in the process of work on the communication device, the alarm system, the electrical contact network, the installation work of the EC post, the installation of structures, the finishing work, landscaping, external and internal engineering networks of the fire tank with the requirements of the design documentation, the task of verifying compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during the construction of a capital construction facility, the subject of verification is compliance with the requirements legislation of the Russian Federation in the field of urban development


# 422004343312
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Verification of the compliance of the work performed and the building materials used in the process of work on the communication device, the alarm system, the electrical contact network, the installation work of the EC post, the installation of structures of engineering networks of the fire tank with the requirements of the design documentation. The purpose of this audit is to verify compliance with the requirements of the legislation of the Russian Federation in the field of urban development. The subject of this audit is compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban development


# 422004196922
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-01-16, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: In order to verify the fulfillment by Antares C LLC of inspection instruction 02181901 dated 16122019 in connection with the expiration of the deadline for the fulfillment of this instruction on 13012020, the task of this inspection is to verify the elimination of violations committed during the construction of the facility. The subject of this inspection is the fulfillment of instruction 02181901 dated 16122019


# 421904063021
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 24160601545636
Unscheduled inspection
Start date: 2016-03-31, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.