Found 36 inspections:

# 262100127581
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-05-04, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The purpose of the inspection is to notify about the completion dates of the works that are subject to inspection dated 03/24/2021 inspection program dated 11/06/2018 No. 26/10-2018-9 . Stage 3; verification tasks - the objectives of this audit are to prevent, identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, technical customer, and construction contractor; the subject of the audit is compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, and executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks; - compliance with other requirements when performing work established by the design documentation, including requirements regarding energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262005265327
Unscheduled inspection
Start date: 2020-12-08, end date: —, duration:
Authority:
Purpose of inspection:


# 262005265276
Unscheduled inspection
Start date: 2020-12-08, end date: 2021-01-13, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Objectives of the audit inspection program dated 06112018 2610201810 Stage 2 objectives of the audit the objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction. Subject of the audit is compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, and drawing up certificates of inspection of structures sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


# 262004444299
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection:


# 262004444285
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration:
Authority:
Purpose of inspection:


# 262004396268
Unscheduled inspection
Start date: 2020-04-09, end date: 2020-05-12, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of the completion dates of works subject to inspection dated 24032020 36200105 inspection program dated 06112018 2610201813 Stage 3 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation, compliance with the procedure for construction control, maintenance of general and or special work logs, executive documentation, compilation acts of inspection of work on structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


# 262004390482
Unscheduled inspection
Start date: 2020-04-20, end date: —, duration:
Authority:
Purpose of inspection:


# 262004333591
Unscheduled inspection
Start date: 2020-03-05, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 262004335785
Unscheduled inspection
Start date: 2020-03-06, end date: —, duration:
Authority:
Purpose of inspection:


# 262004335691
Unscheduled inspection
Start date: 2020-03-06, end date: 2020-04-03, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the inspection are notification of the completion dates of the works to be inspected from 27022020 23400105 inspection program from 06112018 2610201812 Stage 1 inspection objectives The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of inspection compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 262004379394
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-04-21, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the inspection are notification of the completion dates of the works to be inspected from 16032020 31160105 inspection program from 06112018 2610201812 Stage 1 2 inspection tasks The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of inspection compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, drawing up certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 262004379347
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-04-21, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the inspection are notification of the completion dates of the works to be inspected from 16032020 31170105 inspection program from 06112018 2610201811 Stage 2 inspection tasks The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of inspection compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261903984379
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-17, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification dated 12112019 195510114 inspection program dated 06112018 2610201813 Stage 2 inspection tasks The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, drawing up certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261903984564
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-17, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification dated 12112019 195530114 inspection program dated 06112018 2610201815 Stage 3 inspection tasks The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation the subject of the audit is compliance with the procedure for conducting construction control, conducting general and or special logs of work on executive documentation, drawing up certificates of inspection of work on structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261903984468
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration:
Authority:
Purpose of inspection:


# 261903984275
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration:
Authority:
Purpose of inspection:


# 261903952871
Unscheduled inspection
Start date: 2019-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 261903524445
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification from 06092019 155650114 inspection program from 06112018 2610201813 Stage 1 inspection objectives The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, the person carrying out the construction, including technical regulations and project documentation subject of the audit the objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the developer, the technical customer, the person carrying out the construction. by the developer, the technical customer, the person carrying out the construction of violations of the legislation on urban planning activities, including technical regulations and project documentation, compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of work on structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the project documentation, including requirements regarding energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


# 261903524411
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 261902895102
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-20, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification dated 18072019 126320114 inspection program dated 06112018 2610201816 Stage 2 inspection tasks The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, drawing up certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902894239
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-08-20, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification from 18072019 126300114 program from 23102018 262120185 Stage 2 verification tasks The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902894426
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 261902894193
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 261902817049
Unscheduled inspection
Start date: 2019-06-25, end date: —, duration:
Authority:
Purpose of inspection:


# 261902816958
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-22, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification dated 14062019 100880114 program dated 9102018 261020182 Stage 3 verification tasks The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902816777
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-22, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification dated 14062019 100830114 inspection program dated 06112018 2610201817 Stage 2 inspection tasks The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation the subject of the audit is compliance with the procedure for conducting construction control, general and or special logs of work on executive documentation, drawing up certificates of inspection of work on structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902826751
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 261902826584
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 261902826538
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-07-25, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of the completion dates of works that are subject to verification dated 20062019 104400114 program dated 23102018 262120186 Stage 2The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, and the person carrying out construction, including technical regulations and project documentation, compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, and drafting acts inspections of structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902732359
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-20, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification from 16052019 77280114 inspection program from 06112018 2610201816 Stage 1 inspection objectives The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, drawing up certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902732194
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-20, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification from 16052019 77290114 inspection program from 06112018 2610201815 Stage 1 inspection objectives The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, drawing up certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902604287
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-05-06, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the inspection are notification of the completion of works that are subject to inspection from 19032019 42290114 inspection program from 23102018 262120186 stage 1 inspection objectives the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of inspection compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902574566
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-04-12, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification from 06032019 33950114 inspection program from 09102018 261020181 stage 2 inspection tasks the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, drawing up certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902574624
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-04-12, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification from 06032019 33970114 inspection program from 06112018 261020181 Stage 1 inspection objectives The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special logs of work on executive documentation, drawing up certificates of inspection of work on structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902574662
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-04-12, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of works that are subject to verification from 06032019 33960114 program from 9102018 261020192 Stage 2 verification tasks The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, general and or special work logs of executive documentation, preparation of certificates of inspection of structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 261902490943
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-04, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The objectives of the audit are notification of the completion dates of the works to be verified dated 31.012019 14610114 the objectives of the audit are to prevent identify and suppress violations of urban planning legislation committed by the developer technical customer person carrying out construction, including technical regulations and project documentation subject of verification compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, and drafting acts inspections of structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts