# 342100471143
Unscheduled inspection
Start date: 2021-08-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342005179826
Unscheduled inspection
Start date: 2020-10-09, end date: 2020-10-19, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, project documentation b The objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, project documentation 7 The subject of this audit is compliance with mandatory requirements regarding a compliance with the performance of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code of Design Documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model if the formation of and the maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 262004496986
Unscheduled inspection
Start date: 2020-08-19, end date: 2020-09-15, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: this inspection is carried out for the purpose of the inspection program from 07082020 22062020 verification stage installation of an inlet water intake structure with a diaphragm device for the HC3 pumping station Installation of a 3T main pipeline for inspection wells The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and design documentationthe subject of this inspection is compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of work on structures, sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts